Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

12. Appendix I - Engineering Services Report

of 39

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 6, section 1. The text section number identifies this passage in the reader.

                                                                                             Infrastructure Services Report
                                                            Noosa Marketplace Development,   2 - 20 Hofmann Dr, Noosaville



Table 2-1       Site Identification Details
 Item                                 Details
 Applicant                            Noosa - Spotlight Property 2 Pty Ltd
 Site Address                         2-18/20 Hofmann Drive, Noosaville QLD 4558
 Real Property Description            Lot 4 SP2465848, Lot 1 SP222982
 Area                                 35.83 ha
 Planning Scheme                      Noosa Planning Scheme
 Zone                                 Shire Business Centre
 Precinct                             Precinct 5B
 Development Proposal                 Material Change of Use—Commercial precinct consisting
                                      of four buildings and associated carpark




Figure 2-2 Site Zoning (Noosa Council Enterprise Mapping System)

2.2             Land Encumbrances
Both lots are subject to a number of easements and covenants. Located on the northern boundary of the
subject site, and adjoining the eastern edge alongside Hofmann Drive, is an environmental covenant to
preserve native vegetation on site. Running through the site from north to south is a drainage easement
designed to capture overland flow from the wider catchments and discharge into the downstream
environmental reserve. Finally, located to the south of the site, on the eastern boundary is an environmental
covenant to preserve native vegetation. It is noted that this land cannot be used or cleared to treat stormwater
flows discharging from the site.




17 May 2019                                             Cardno                                                           6
Log in to download the original file

12. Appendix I - Engineering Services Report.pdf · 6.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.