85.10 A detailed description of vehicular access to collect waste. Where collection is off
street, access must allow vehicles to enter and leave the site in a forward direction.
86. A Waste Management Plan (Demolition/Construction) in accordance with Planning Scheme
Policy “Waste Management Multi-Dwellings and Commercial and Industrial Premises”, shall
be submitted for the demolition and construction phases of the development and approved
by Council’s Environmental Health Section prior to the issue of the development permit for
operational works. The Plan shall contain the following information:
MATERIALS ON-SITE DESTINATION
Re-use and Recycling Disposal
Expected waste Estimated On-site Off-site *specify
materials volume *specify *specify contractor and
(m³) proposed re-use contractor and landfill site
or on-site recycling outlet
recycling
methods
Excavation
material
Green waste
Bricks
Concrete
Timber-please
specify
Plasterboard
Metals - please
specify
Asbestos
Other - please
specify
Note: Details of site area to be used for onsite separation, treatment and storage (including
weather protection) shall be provided on the plan drawings accompanying your application.
87. Noise emission from swimming pool and spa equipment (including heating equipment) shall
comply with the following requirements:
87.1. The equipment shall be installed and located in a manner that prevents excessive noise
in accordance with Council’s Local Law No. 12 - Control of Nuisances. Infringement
Notices (on-the-spot fines) may apply for offences.
87.2. A person must not use equipment on any day if it makes or causes noise to be made
–
87.2.1. From 10pm to 7am: Which is audible outside the most exposed part of an
affected building
87.2.2. From 7am to 7pm: More than the lower of either –
Page 11 of 16
[OCR of page images]
86.
87.
85.10 A detailed description of vehicular access to collect waste. Where collection is off
street, access must allow vehicles to enter and leave the site in a forward direction.
A Waste Management Plan (Demolition/Construction) in accordance with Planning Scheme
Policy “Waste Management Multi-Dwellings and Commercial and Industrial Premises”, shall
be submitted for the demolition and construction phases of the development and approved
by Council’s Environmental Health Section prior to the issue of the development permit for
operational works. The Plan shall contain the following information:
MATERIALS ON-SITE DESTINATION
Re-use and Recycling Disposal
Expected waste | Estimated | On-site Off-site *specify
materials volume “specify *specify contractor and
(m) proposed re-use | contractor and | landfill site
or on-site | recycling outlet
recycling
methods
Excavation
material
Green waste
Bricks
Concrete
Timber-please
specify
Plasterboard
Metals - please
specify
Asbestos
Other - please
specify
Note: Details of site area to be used for onsite separation, treatment and storage (including
weather protection) shall be provided on the plan drawings accompanying your application.
Noise emission from swimming pool and spa equipment (including heating equipment) shall
comply with the following requirements:
87.1. The equipment shall be installed and located in a manner that prevents excessive noise
in accordance with Council’s Local Law No. 12 - Control of Nuisances. Infringement
Notices (on-the-spot fines) may apply for offences.
87.2. A person must not use equipment on any day if it makes or causes noise to be made
87.2.1. From 10pm to 7am: Which is audible outside the most exposed part of an
affected building
87.2.2. From 7am to 7pm: More than the lower of either —
Page 11 of 16
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.