Original source · versioned page text
SUPERSEDED - Minor Change Existing Approval 132004.5744.12 - (As Published)
77. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
78. As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer
for design intent, and a Licensed Surveyor shall certify the cadastre and the location, level
and type of all services and structures. All of which shall be submitted to Council for checking
and for Council’s records.
79. The data must fully detail levels for all engineering works including but not limited to drainage
structures, finished ground levels and pavement surface levels. The data shall be submitted
in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of
ADAC are available at www.adac.com.au).
80. Approval of works shall not be granted until all As Constructed information has been supplied
and accepted by Council.
Environmental Health
81. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy “Waste Management Multi-Dwellings and Commercial and
Industrial Premises”, including an external imperviously paved area correctly sized for all
refuse and recycling containers and suitably screened from public places and neighbouring
properties. A roofed wash down area is required with a cold-water tap, hose and drain outlet
connected to sewer.
82. Refuse containers must be provided in accordance with the requirements of the
Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
Regulation 2000, for the storage and collection of refuse.
83. A clinical waste service provided by a licensed clinical waste contractor must be provided for
the activities.
84. The development must allow refuse-loading areas to be located off street. All vehicles
associated with the collection of waste/recyclables, shall enter and leave the site in a forward
direction.
85. A Waste Management Plan (Operational) in accordance with Planning Scheme Policy
“Waste Management Multi-Dwellings and Commercial and Industrial Premises”, must be
submitted for the day-to-day operation of the complex and approved by Council’s
Environmental Health Section prior to issue of development permit for operational works.
The Plan shall include the following information: -
85.1 The types of waste that will be generated from the activities approved within the
development.
85.2 Estimated volumes or tonnage of recyclables within the generated waste stream
85.3 Estimated volumes or tonnage of waste generated from the activities.
85.4 Methods to be used for dealing with garden waste.
85.5 Initiatives to minimize waste either by waste prevention, reduction, re-use or recycling.
85.6 Description of procedures involving disposing of refuse to bins; the storage of bins and
the collection of bins by the contractor and who is responsible for each transfer of the
waste.
85.7 A description of the design details of waste storage and recycling areas including size,
location, elevation and floor plan, methods of bin washing and of prevention of storm
water contamination.
85.8 A description of types and volume of waste storage containers to be used.
85.9 The waste and recycling storage area shall include the provision of containers for all
waste and recycling materials including putresable matter, non-recycling waste, paper
and cardboard, glass, aluminium and steel cans, waste oil, styrofoam boxes, etc, and
bin washing facilities.
Page 10 of 16
[OCR of page images]
77.
78.
79.
80.
Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer
for design intent, and a Licensed Surveyor shall certify the cadastre and the location, level
and type of all services and structures. All of which shall be submitted to Council for checking
and for Council’s records.
The data must fully detail levels for all engineering works including but not limited to drainage
structures, finished ground levels and pavement surface levels. The data shall be submitted
in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of
ADAC are available at www.adac.com.au).
Approval of works shall not be granted until all As Constructed information has been supplied
and accepted by Council.
Environmental Health
81.
82.
83.
84.
85.
The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy “Waste Management Multi-Dwellings and Commercial and
Industrial Premises”, including an external imperviously paved area correctly sized for all
refuse and recycling containers and suitably screened from public places and neighbouring
properties. A roofed wash down area is required with a cold-water tap, hose and drain outlet
connected to sewer.
Refuse containers must be provided in accordance with the requirements of the
Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
Regulation 2000, for the storage and collection of refuse.
A clinical waste service provided by a licensed clinical waste contractor must be provided for
the activities.
The development must allow refuse-loading areas to be located off street. All vehicles
associated with the collection of waste/recyclables, shall enter and leave the site in a forward
direction.
A Waste Management Plan (Operational) in accordance with Planning Scheme Policy
“Waste Management Multi-Dwellings and Commercial and Industrial Premises”, must be
submitted for the day-to-day operation of the complex and approved by Council's
Environmental Health Section prior to issue of development permit for operational works.
The Plan shall include the following information: -
85.1 The types of waste that will be generated from the activities approved within the
development.
85.2 Estimated volumes or tonnage of recyclables within the generated waste stream
85.3 Estimated volumes or tonnage of waste generated from the activities.
85.4 Methods to be used for dealing with garden waste.
85.5 Initiatives to minimize waste either by waste prevention, reduction, re-use or recycling.
85.6 Description of procedures involving disposing of refuse to bins; the storage of bins and
the collection of bins by the contractor and who is responsible for each transfer of the
waste.
85.7 A description of the design details of waste storage and recycling areas including size,
location, elevation and floor plan, methods of bin washing and of prevention of storm
water contamination.
85.8 A description of types and volume of waste storage containers to be used.
85.9 The waste and recycling storage area shall include the provision of containers for all
waste and recycling materials including putresable matter, non-recycling waste, paper
and cardboard, glass, aluminium and steel cans, waste oil, styrofoam boxes, etc, and
bin washing facilities.
Page 10 of 16
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.