SUPERSEDED - Minor Change Existing Approval 132004.5744.12 - (As Published)
will adjusted in line with changes to the Consumer Price Index, All Groups Brisbane from
June 2005 until the date of payment.
Water Supply $419,854
Sewerage $258,718
TOTAL $678,572
All headworks contributions must be paid prior to the issue of a Development Permit for
Operational Works.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
headworks contributions not be paid at the due time, Council shall call upon the trading bank
guarantee in full.
In the event that the Development Permit for Material Change of Use of Premises lapses or
is cancelled, the contribution or trading bank guarantee will be returned.
Earthworks
69. Fill shall be compacted to the requirements of AS3798-1996 ‘Guidelines on Earthworks for
Commercial and Residential Developments’. Any existing fill that does not meet the
requirements of this standard shall be removed prior to additional filling or building works
commencing.
70. A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site,
determine the soil classification and make recommendations on the type of foundation
system(s) best suited for the proposed development. This information shall be submitted to
the Council for assessment and approval prior to obtaining a Development Permit for
Operational Works.
Erosion and Sediment Control
71. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary. In this regard plans detailing the methods of
controlling erosion and sediment are required to be submitted to the Council for approval
prior to obtaining a Development Permit for Operational Works.
General
72. Prior to works commencing contractors shall submit a Traffic Management Plan showing
measures to be put in place during construction for approval by Council’s Works Directorate.
73. A suitably qualified Registered Professional Engineer shall prepare engineering drawings
and specifications for all engineering works that will become Council infrastructure, which
shall be submitted in conjunction with an application for a Development Permit for
Operational Works. In this regard a DXF/DWG file on GDA94 zone 56 grid of the proposed
cadastre layout is to be submitted in conjunction with any application for Operational Works.
74. Digital detailed design drawings and calculations shall be submitted with any application for
a Development Permit for Operational Works in respect of roadworks and stormwater
drainage works. To avoid conflict with underground pipes or services, all existing and
proposed services required by the development shall be shown on the plans.
75. To facilitate production of As Constructed drawings it is suggested that all design drawings
are submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on
the use of ADAC are available at www.adac.com.au).
76. Any damage caused to any public utility during the course of construction shall be repaired
to Council’s standards and at no cost to Council. Particular care shall be exercised when
working near the rising main in the road reserve to the north of the site.
Page 9 of 16
[OCR of page images]
will adjusted in line with changes to the Consumer Price Index, All Groups Brisbane from
June 2005 until the date of payment.
Water Supply $419,854
Sewerage $258,718
TOTAL $678,572
All headworks contributions must be paid prior to the issue of a Development Permit for
Operational Works.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
headworks contributions not be paid at the due time, Council shall call upon the trading bank
guarantee in full.
In the event that the Development Permit for Material Change of Use of Premises lapses or
is cancelled, the contribution or trading bank guarantee will be returned.
Earthworks
69.
70.
Fill shall be compacted to the requirements of AS3798-1996 ‘Guidelines on Earthworks for
Commercial and Residential Developments’. Any existing fill that does not meet the
requirements of this standard shall be removed prior to additional filling or building works
commencing.
A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site,
determine the soil classification and make recommendations on the type of foundation
system(s) best suited for the proposed development. This information shall be submitted to
the Council for assessment and approval prior to obtaining a Development Permit for
Operational Works.
Erosion and Sediment Control
71.
Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary. In this regard plans detailing the methods of
controlling erosion and sediment are required to be submitted to the Council for approval
prior to obtaining a Development Permit for Operational Works.
General
72.
73.
74,
75.
76.
Prior to works commencing contractors shall submit a Traffic Management Plan showing
measures to be put in place during construction for approval by Council’s Works Directorate.
A suitably qualified Registered Professional Engineer shall prepare engineering drawings
and specifications for all engineering works that will become Council infrastructure, which
shall be submitted in conjunction with an application for a Development Permit for
Operational Works. In this regard a DXF/DWG file on GDA94 zone 56 grid of the proposed
cadastre layout is to be submitted in conjunction with any application for Operational Works.
Digital detailed design drawings and calculations shall be submitted with any application for
a Development Permit for Operational Works in respect of roadworks and stormwater
drainage works. To avoid conflict with underground pipes or services, all existing and
proposed services required by the development shall be shown on the plans.
To facilitate production of As Constructed drawings it is suggested that all design drawings
are submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on
the use of ADAC are available at www.adac.com.au).
Any damage caused to any public utility during the course of construction shall be repaired
to Council’s standards and at no cost to Council. Particular care shall be exercised when
working near the rising main in the road reserve to the north of the site.
Page 9 of 16
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.