SUPERSEDED Decision Notice - Council Meeting Decision MCU21 0110.pdf

of 53

Page text read automatically using OCR, there may be inaccuracies

                        Odour
                 2.     Be advised that the development is located in near proximity to the Unity Water Noosa
                        Sewerage Treatment Plant, the operation of which may, at times, result in detectable
                        odours on the development land. This advice is provided to ensure that the developer
                        and resort operator are informed of the potential for detectable odours due to sewerage
                        treatment plan operation and the basis for conditions in this approval package with
                        respect to odour monitoring/management measures. It is the responsibility of the
                        developer/resort operator to ensure that compliance with odour monitoring/management
                        conditions is achieved at all times.
                        Building and Construction Industry (Portable Long Service Leave) Levy
                 3.     The QLeave levy must be paid prior to the issue of a development permit where it is
                        required. Council will not be able to issue a Decision Notice without receipt of details
                        that the Levy has been paid.
                        Co-ordination of Operational Works Assessment
                 4.     Additional application fees apply to Operational Work applications where the different
                        aspects of the works are lodged separately. Significant savings in application fees will
                        result if all works are lodged in a single application.
                        Qualified Person
                 5.     For the purpose of preparing a Geotechnical Report, and for certifying geotechnical
                        stability for the development, a qualified person is considered to be a person who:
                        a.      is a Registered Professional Engineer of Queensland (RPEQ); and
                        b.      has a degree in civil engineering or engineering geology; and
                        c.      has a minimum of 5 years experience in the field of geotechnical engineering or
                                engineering geology.
                        Preparation of a Preliminary Construction Management Plan
                 6.     A preliminary Construction Management Plan must be submitted with the Operational
                        Works application and must address the following:
                        a.      traffic management during all aspects of the construction phase including:
                                i.     a Traffic Management Control Plan in accordance with the Manual of
                                       Uniform Traffic Control Devices (MUTCD) detailing all temporary signage
                                       and traffic control measures prior to construction
                                ii.    maintenance of safe pedestrian access for the areas affected by the works
                                       during and after daily construction has ceased
                                iii.   proposed fencing to the site during the construction phase of the
                                       development
                                iv.    approval of the Traffic Management Control Plan by the Department of
                                       Transport and Main Roads (DTMR) for any works on State controlled roads
                                v.     provision for worker car parking
                        b.      maintenance and protection of water quality and existing drainage lines through
                                the construction site, through the implementation of appropriate erosion and
                                sediment control measures
                        c.      works programme identifying key components of the works and their respective
                                durations




                                                                                                       Page 15 of 53
Document Set ID: 23746767
Version: 6, Version Date: 22/05/2025

Log in to download the original (SUPERSEDED Decision Notice - Council Meeting Decision MCU21 0110.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.