SUPERSEDED Decision Notice - Council Meeting Decision MCU21 0110.pdf
Ventilation
8. All internal use areas of the accommodation use including hotel suites, common areas,
office, dining, bar and lobby areas shall be fully air-conditioned, allowing external façade
elements (doors and windows) to be closed if required. Fresh air makeup to the air
conditioning systems must be drawn from roof level locations located as far as practical
from the Noosa Wastewater Treatment Plant.
9. Activated carbon filtration must be installed on all fresh air makeup locations of the air
conditioning systems and must be regularly maintained to manufacturer specifications.
Outdoor Use Areas – swimming pools and tennis courts
10. Use by guests and visitors of the tennis courts, is limited to the following time periods:
i. 7am to 6pm: Four courts
ii. 6pm to 9pm: Two courts only
iii. 9pm to 6am: No usage of tennis courts
11. Use by guests and visitors of the swimming pools is limited to the time period 6am to
9pm only.
Acoustic
12. An updated acoustic report must be submitted to Council prior to the issue of an
Operational Works approval. The amended acoustic report must include
recommendations to address the impact on residential amenity attributed to vacuum
truck operations on the site and provide acoustic mitigation measures to achieve
compliance with the noise criteria proposed in Section 6.2.4.1 of the Trinity Noise Impact
Assessment Report dated 20 February 2025. The recommendations of the acoustic
report must be implemented prior to the commencement of the approved uses.
Noise Limits
13. Noise generated by the development must not exceed the following criteria at any off-
site noise sensitive receptor:
Period Background Noise Overall Noise Design
Level L90 dBA Limits Leq,adj,T dBA Component Noise
Limits Leq,adj,T dBA
Day 36 41 39
(7am to 6pm)
Evening 31 36 34
(6pm to 10pm)
Night 28 31 28
(10pm to 7am)
14. Real Time Odour Monitoring
(a) Monitoring Equipment Intent
Install and maintain a real time odour monitoring system which continuously samples
odour on the resort site and provides real time updates to resort management of odour
concentrations. The monitoring system must monitor relevant odour indicators (such as
Hydrogen Sulphide) and provide real time alerts via email/SMS to resort management
when trigger levels are reached/exceeded. The monitoring system must include an on-
Page 4 of 53
Document Set ID: 23746767
Version: 6, Version Date: 22/05/2025
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.