PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 9 OCTOBER 2018
The Plan must contain the following information:
The site area for the storage and separation of waste is to be shown on the
plan drawings accompanying the application
A waste management table as indicated below is to be completed showing how
waste material is to be segregated - recycled – reused or disposed.
Table – Waste Management Table
MATERIALS ON-SITE DESTINATION
Re-use and Recycling Disposal
Expected Estimated On-site Off-site *specify contractor
waste volume(m³) *specify proposed *specify and landfill site or
materials re-use or on-site contractor and other disposal site
recycling methods recycling outlet
Excavation
material
Green waste
Bricks
Concrete
Timber-please
specify
Plasterboard
Metals -
please specify
Asbestos
Other - please
specify
Note * If a demolition contractor is undertaking works, then the Waste Management
table is to be completed by the demolition contractor.
Waste Storage & Disposal
21. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy 9, Waste Management, including an external imperviously
paved area correctly sized for all refuse and recycling containers and suitably
screened from public places and neighbouring properties.
22. Waste collection services are limited to between 6.30am and 6.30pm Monday to
Saturday and not permitted on Sunday or public holidays.
Outdoor Lighting Devices
23. Lighting associated with the use must be designed, sited, installed and tested to
comply with Table 2.1 & 2.2 of Australian Standard AS4282-1997 “Control of the
obtrusive effects of outdoor lighting” using a control level of 1.
24. Certification must be submitted to Council from a qualified person which certifies that
all outdoor lighting devices comply with the requirements of this Decision Notice at
the time of commissioning.
For the purpose of certifying outdoor lighting devices for the development, a qualified
person is:
a Registered Professional Engineer of Queensland;
an environmental or electrical design consultant with a minimum of 3 years
current experience in the field of outdoor lighting.
Page 23 of 52
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.