Skip to the record
Accept no substitutions.

Original source · versioned page text

Development Application part 2 Report and Plans MCU13/0052

of 132

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (119 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                         .   .




                             ..                            .




3.0
                     .




                         SITE SELECTION
Planning for a new fixed wireless broadband facility is a complex process. NBN Co
conducts a rigorous multi-stage scoping process, as outlined below.


3.1            Identification of areas requiring Fixed Wireless coverage

The NBN Co Fixed Wireless locations will be determined by a number of factors including
the availability of, both the NBN Co Fibre transit network and the availability of Point of
Interconnect (POI)facilities to allow for the installation of NBN Co equipment. NBN Co
uses a         number of methods .to identify those parts of Australia that require Fixed Wireless
coverage. When an area is’identified as requiring Fixed Wir~less coverage,.investigations
are undertaken to determine the me sures required to .provide this coverage.



NBN Co’has identified a requirement to provide a fixed wireless facility in Boreen Point.
The facility will provide Fixed Wireless coverage to dwellings in the Boreen Point North
and Cootharaba area, in addition to serving as a key communications link for other NBN
Fixed Wireless facilities in the wider Sunshine Coast region.


3.2            Site Selection Parameters

NBN Co identifies an area where the requirement for a Fixed Wireless broadband facility
would be highest, a ’search area.’      A preliminary investigation of the area is then
undertaken, in’   njunction with planning and property consult~nts; radiofrequency
                             c

engineers and designers in order to identify possible locations to establish a facility.

c:;enerally, new sites must be located within, or immediately adjacent to, the identified
search area in order to be technically feasible. However, while the operational and
geographical aspects of deploying new facilities are primary factors, there are also many
other issues that influence network design, which have to be resolved in parallel.


Some of the issues that are ..considered include:
       .       visual amenity
   :   ~       potential co-location opportunities
       .the availability and suitabilit              of land as well as a willing site provider
       .       occupational health and safety
      ..
           .




               construction issues (including structural and loading feasibility and              access    for
       :
               m intenance purposes)

       .       topographical constraints affecting network line of site
       .       legislative policy constraints
       .       envir nmental impacts
       .       cost implications.


The number, type and height of facilities required to complete the Fixed Wireless network
are  largely determined by the operational, geographical and other factors discussed
above, which influence final network design. These compounding factors often severely
restrict the available search area within which a facility can be established to provide
                                                                                                   .




reliable Fixed Wireless broadband to a local community.




NBN-4NBZ-4POM-5136                -   Boreen Point North                                           Page 9
Log in to download the original file

Development Application part 2 Report and Plans MCU13_0052.pdf · 119 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.