Original source · versioned page text
Development Application part 2 Report and Plans MCU13/0052
The original of this document is very large (119 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn 6.3.2 Remnant Vegetation
Under the VMA, the subject site is mapped as predominantly ’Plantation Forest’ and
containing small portions of Remnant Vegetation that is an ’of concern’ regional
ecosystem and Remnant Vegetation that is a ’least concern’ regional ecosystem (refer to
Figure 6.2 below). Parts of this vegetation are also identified as being Essential Habitat.
The proposed development will not require a permit or notification to the DNRM as, it is
located in a cleared area, approximately 300 m from the assessable vegetation, and the
proposal does not require removal of any significant vegetation.
_/
,/
.
~
.~’ : ~"~’
_ Remnant vegetation conrsi1lng endangered
regional ecosystems
_ Remnant vegetation containing of concern
regional ecosystems
..Remnant vegetation that is a least concern
regional ecosystem
CJ Plantation Forest
c:::::J Dam or Reservoir
c::J Remnant Veget tion
CJ PMAV Category X area
E::] Vegetation Management Aet Essential Habitat
For further Information on VMA Essential Habltot.
please seethe attached VMA Essential Hobi’.! map.
6.4 State Planning Policy Framework
A State Planning Policy (SPP)is a statutory instrument developed by the Queensland
State Government under the Sustainable Planning Act 2009 (or the former Integrated
Planning Act 1997) on matters of State interest. SPPs apply when development is
assessed, land is designated for community infrastructure, and when proposed new
r
planning schemes are made or amended under the SPA. The SPP’s below are current.
State planning policies developed under the Integrated Planning Act 1997 remain current
under the Sustainable Planning Act 2009. There are currently twelve (12) active SPPs,
one (1)of which apply to the proposed development, as demonstrated in Table 6.1 below.
NBN-4NBZ-4POM-5136 -
Boreen Point North Page 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.