Skip to the record
Accept no substitutions.

Original source · versioned page text

Development Application part 2 Report and Plans MCU13/0052

of 132

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (119 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
     8.0            OTHER                            ENVIRONM"ENTAL
     CONSTRAINTS AND OPPORTUNITIES
I
     8.1    Visual Amenity and Setting
I    NBN has endeavoured to strike a balance between providing services and minimising any
     visual impact on the community and local environment. Telecommunication facilities need
     to be located in or near the area for which    they are designated to provide or improve
     coverage. This particular location was partly chosen as it provides a significant element of
     separation from nearby sensitive land uses whilst meeting the required radio frequency
     (RF) coverage for the Boreen Point North and Cootharaba area. The height of the
,I   proposed tower is the minimum required to achieve NBN RF objectives.

     The wider area of Boreen Point North and Cootharaba is characterised by large farming
     properties, heavily vegetated areas and large rural-residential allotments. The subject site
     is located approximately 2km north west of the Boreen Point township. The subject
     property is currently used for farming purposes, chiefly forestry and logging. The proposed

I    facility will comprise a 7m x 10m lease area to be located adjacent to the south eastern lot
     boundary of the site. Figure 8.1 below demonstrates the characteristics of the subject site.


I
I
I


I
I
I
I
I
     Although the subject site predominantly contains pine trees for timber harvesting, there are

I    also corridors and areas of existing mature remnant and regrowth vegetation which are
     unlikely to be removed. Figure 8.2 provides an aerial photograph demonstrating the
     existence of existing mature vegetation in the surrounding area which will provide


I
I    NBN-4NBZ-4POM-5136   -
                              Boreen Point North                                       Page 46
Log in to download the original file

Development Application part 2 Report and Plans MCU13_0052.pdf · 119 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.