Development Application part 2 Report and Plans MCU13/0052

of 132

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (119 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                         sting mature vegetation    igning
                                   benefits to the adjoining properties (looking west)


        In conjunction with the natural vegetation screening, the proposed location also provides
        an   adequate separation distance and setbacks from community sensitive locations which
        will also assist in minimising the visual obtrusiveness of the facility as follows:
             .   Sited on the periphery of the concentrated residential dwellings (aligning Kildeys
                 Road)and over 2 km from the Soreen Point township;
             .   Located within proximity to only (3)residential dwellings within a 500 m radius; and
             .   Setback from all public open space areas including but not limited to;
                    o   More than 900 m from the edge of Lake Cootharaba
                    o   More than 2.3 km from Soreen Field Park

,   ,
                    o   More than 2.6 km from Soreen Point Foreshore Park


        Figure 8.6 below illustrates the view looking north (taken from the ancillary shed) towards
        the existing  powerlines and power corridor which runs from north to south through the
        subject site (approximately 20 m east of the proposed facility). The existing power corridor
        can also be seen in previous Figure 8.2 and demonstrates the facility has been

        appropriately located on a site that contains existing infrastructure.




        NBN-4NBZ-4POM-5136    -
                                  Boreen Point North                                          Page 50
Log in to download the original file

Development Application part 2 Report and Plans MCU13_0052.pdf · 119 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.