                                                                                           2008/587



Roadworks Widening
31.   The full length of the David Low Way frontage of the development site shall be upgraded by
      providing kerb & channel, bitumen road widening and landscaping improvements to the
      footpath. These works are to be undertaken by the applicant at no cost to Council unless the
      nominated works have been previously undertaken by Council as part of their improvements
      to David Low Way. The alignment of all new kerb and channel shall be as directed by
      Council’s Manager Works Planning. All associated and ancillary work including pavement
      correction to the existing pavement, drainage works, modification of the footpath, and
      adjustments to the existing infrastructure shall be undertaken to complete the roadworks
      widening.
      In this regard a schedule of works, specifications and plans detailing this work shall be
      prepared and submitted to Council for approval prior to obtaining a Development Permit for
      Operational Works.

Frontage Works
32.   Footpath improvements such as topsoiling, grassing, and tree planting are required to the
      David Low Way frontage of the site in accordance with Planning Scheme Policy PSP03
      Landscaping Plants & Guidelines. Grass shall be couch, free of weeds.
33.   A new 2.0m wide concrete path shall be constructed along the David Low Way frontage of the
      site in accordance with Council’s design standards and to an alignment that protects any
      significant vegetation or any underground services.
34.   All paths, driveways and parking areas shall be designed and constructed to ensure
      pedestrian safety using non-slip materials, to produce an evenly graded surface finish, and to
      be in accordance with the Disability Discrimination Act 1992 and Australian Standard 1428.1
      Design for Access & Mobility.
35.   All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel,
      footpath paving and landscaping such as trees and grasses in accordance with Council’s
      Standard specifications prior to commencement of the use permitted by this permit.
Roof Water & Stormwater Drainage
36.   Roof runoff from any new building shall be directed to a rainwater storage system or tank
                                                                 2
      (minimum storage the greater of 5000 litres or 15 litres/m of roof area) that is installed to
      ensure water from the tank is used for external uses (such as watering gardens, irrigation,
      ornamental ponds, water features, outdoor cleaning, etc) and for use in flushing of toilets
      internal to the building. All rainwater tanks are to be designed and installed in accordance
      with the Queensland Development Code (QDC), Part 25 – Rainwater Tanks, and shall be part
      of the plumbing application in conjunction with the building approval. The location and
      capacity of the tanks shall be clearly shown on the plans submitted for Building Works /
      Operational Works approval and any overflow shall be directed to the stormwater drainage
      system.
37.   All stormwater drainage (including roof water overflow from the rainwater storage system)
      shall be collected and discharged so there is no net increase in stormwater runoff from the
      site. The runoff from the site shall be controlled via a combination of retention, detention, on
      site infiltration and gravity drainage lines. Stormwater drainage permitted to drain from the site
      shall be discharged to Council’s existing drainage structures located in the adjoining property
      to the north (Lot 95 SP137431).
38.   The design of the stormwater drainage system for the site shall be prepared by a suitably
      qualified Registered Professional Engineer. The design shall include but not be limited to:
      38.1.   The design of any required on site infiltration system to be of sufficient size to cater for
              a Q100 rainfall event for the catchment area draining to the on site infiltration system.

                                                                                       Page 5 of 22

Used in these records

About this file

File size
336 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2008.00000587.001 [As Published].pdf · 336 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.