38.2. A report prepared by a suitably qualified geotechnical engineer to determine if the
existing site conditions can cater for the expected infiltration should it be proposed;
38.3. The determination of the capacity of the existing Council stormwater system to ensure
that the subject site does not overload the system;
38.4. The design of the drainage system for the site to include backflow protection features;
39. To ensure that polluted run-off does not enter Council’s stormwater drainage system,
stormwater run-off from the carparking areas and the driveways shall have the first flush (the
first 12 mm of rainfall or hose-down) collected in a grease/oil arrestor provided on site prior to
being permitted to discharge into Council’s drainage system.
All other clean stormwater, such as roof water, can be collected on site and discharged
through a single underground drain line directly into the existing drainage system, bypassing
the grease/oil arrestor.
To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil
arrestors, which shall be submitted to the Council for approval prior to obtaining a
Development Permit for Operational Works.
The approved maintenance plan shall be incorporated in the Community Management
Scheme for the development and a copy of this shall be provided for Council’s records prior to
commencement of the approved Use.
A Development Permit for Building Works shall not be granted until a Development Permit for
Operational Works has been issued in regard to the drainage scheme.
40. All site stormwater drainage shall be by means of a gravity system. No mechanical features
are to be used to dispose of stormwater.
Sewer Mains
41. The site shall be connected to Council’s existing sewerage reticulation systems and be
constructed in accordance with Council’s standards and requirements at no cost to Council.
42. The existing sewer main that is located in south-western and north-western corners of the site
and the ‘zone of influence’ (taken as the area within a 45-degree angle measured from the
invert of the sewer main to the finished surface level) shall be accurately located and
determined by a licensed Surveyor and shown on all plans submitted for Operational Works
approval.
To ensure Council’s sewer main is accessible for maintenance purposes and is protected from
risk of damage no structures requiring a building permit (eg. buildings, retaining walls
exceeding 1m in height, raised terraces, etc) shall be constructed within this ‘zone of influence’
or within 1.5m of the centreline of the sewer main, whichever is the greater. As such the
applicant shall amend Operational Works plans including Building plans to ensure compliance.
43. The existing sewer located in the northwest corner of existing lot 1RP903222 (No. 249) and
along and within the western boundary of existing lot 26P9315 (No. 253) shall be removed and
a new 150mm dia. sewer house connection branch constructed out of the existing manhole
MP20/14/01 (located outside and adjacent to northern boundary of lot 26) to serve the
proposed development.
All works to be carried out to the standards and requirements of Council at the applicant’s
cost.
44. The applicant’s shall demonstrate that the new sewer house connection branch referred to in
the above condition fully serves the proposed development in accordance with Council’s
Planning Scheme Policy PSP06 and the Plumbing Code.
Page 6 of 22
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2008.00000587.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 336 KB (small file)
- File type
No other editions are linked here.