Skip to the record
The gold standard in government transparency.

Council archive · source document

Decision Notice - 010.2008.00000587.001 [As Published] · 132008.587

of 22

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                                         2008/587



45.   The existing sewer manhole located in the south-west corner of existing lot 2RP903222 (No.
      247) to be removed and existing sewer located along and within the western boundary of
      adjacent Lot 22P9315 (No. 247) to be abandoned. Consent of adjacent property owners to
      carry out any necessary works to abandon sewer required prior to issue of any Decision
      Notice in respect to Operational Works. All works to be carried out to the standards and
      requirements of Council at applicant’s cost.
Town Water Supply
46.   The site shall be connected to Council’s existing town water supply and be constructed in
      accordance with Council’s standards and requirements at no cost to Council.
47.   Each individual water connection to the water reticulation system shall extend to the property
      boundary and be metered. All fees for the supply of water meters shall be paid to the Council.
48.   All water meters must be located outside the property boundary and in an easily assessable
      location to facilitate unhindered reading by Council and/or Council’s contracted water meter
      readers, and not behind fences or locked gates. In this regard approval of the water meter
      configuration and location must be obtained from Council’s Water & Sewerage Capital Works
      Manager prior to lodgement and approval of hydraulic drawings.
49.   For Multiple Uses (including Building Format Plans, Group Title Plans, etc) the development
      shall be served by:
      49.1.   A single Body Corporate water meter to measure the total water consumption
              (including fire hose reels, but excluding fire hydrants and fire sprinkler systems), and
      49.2.   Individual water meters to each tenement capable of being separately rated, and
      49.3.   A fire service (fully testable single detector check with metered bypass), where
              applicable, for flows to fire hydrants and fire sprinkler systems (excluding fire hose
              reels).
50.   The applicant is advised that this development may require the provision of fire hydrants and a
      booster pump in accordance with the Building Code of Australia, and consultation may also be
      needed with Queensland Fire Services to ensure suitable fire fighting infrastructure is
      provided. To this end any necessary fire hydrants shall be clearly shown on the plans
      submitted for both Operational Works and Building Works approval and if a booster pump is
      deemed necessary, the plans shall indicate where the fire truck is to be accommodated in
      order to provide boosting to the water supply.
Service Easements (Sewer / Stormwater)
51.   A registered easement shall be created over the zone of influence of all sewers within the
      subject site and over those parts of the subject site that are impacted upon by sewers on any
      adjoining sites. The easements shall generally be parallel to and centred over the sewer main
      and be equivalent in width to twice the depth to invert level of the sewer at the deepest point
      within the allotment (measured from the finished surface) and be no less than 3.0m wide
      overall. In this regard a licensed surveyor shall accurately locate all sewer mains and
      determine the necessary width of the easement, which shall be shown on any plans submitted
      for Operational Works / Building Works approval. To this extent the surveyor shall certify that
      the sewer and the zone of influence is wholly contained within the easement to be created.
      In addition to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate
      undertaking in writing that the Title Deed and the easement documents will be lodged at the
      Land Titles Office and any additional Titles Office forms or requisitions requiring the consent of
      Council will be attended to promptly.

      A duly executed copy of the easement shall be submitted to Council for perusal prior to the
      use commencing.

      Any changes required by Council’s Solicitor must be corrected immediately.
                                                                                      Page 7 of 22

Used in these records

About this file

File size
336 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2008.00000587.001 [As Published].pdf · 336 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.