site access , Driveway Earthworks,Retaining , · OPW24/0017
Our ref: 211101
Council Ref: DBW21/0208
20 February 2023
The Chief Executive Officer
Noosa Shire Council
PO Box 141
Tewantin QLD 4565
Attention: Development Assessment – Jada Lyons
Via email: [email protected]
Dear Jada,
Re: Response to Council’s Information Request
Development Permit for Building Work to construct a Carport and Deck
38 Plover St, PEREGIAN BEACH
Lot 12 on P9313
Council ref: DBW21/0208
I refer to Council’s Information Request, dated 20 December 2021 in relation to the abovementioned
development.
On behalf of the applicant, Stephen Bruce and Kim McLennan, and in accordance with Section 13 of the DA
Rules, we provide a response to all the issues raised. A response to the item(s) raised in Councils Information
Request is outlined below:
ITEM 1:
The proposed carport is located within the front setback. Acceptable Outcome AO9.1 of the
Low Density Residential Zone Code requires a front setback of at least 6 metres. The
application includes examples of houses on Plover Street with similar reduced setbacks.
These examples do not represent the predominant character of the streetscape, which
presents primarily setback carports and dwelling houses from the street.
Information Required:
1. Provide updated plans complying with the minimum front setback of 6 metres; or
2. Provide updated plans with the new carport setback at least the same as the
carport of the adjoining property to the south (number 36).
RESPONSE
Please refer to the revised Design Plans prepared by Clare Design in Attachment 1, demonstrating a complying
front setback of 6 metres. The carport is now located on the side boundary of the site, however, complies in full
with the side boundary setback provisions under AO9.4 of the Code, with the proposal complying with the
Queensland Development Code (QDC MP1.2). Specifically, the open carport is less than 4.5m in height at any
Our ref: 211101 Page 1 of 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.
Full text of the other 24 pages
Page 2
point (max 3.94m achieved) and has a length not exceeding 9m on the boundary. All other parts of the structure
are setback at least 1.5m from the side boundary.
ITEM 2:
The submitted plans do not include sufficient detail on the access driveway and the
manoeuvring area.
Information Required
1. Provide additional detail on the access driveway and the maneuvering area. The detail
must be prepared by a suitably qualified person and include but not be limited to:
a) plan of the driveway in relation to all the existing vegetation, including details of
vegetation to be removed;
b) levels and grades of the access driveway and the maneuvering areas;
c) a longitudinal section extending from the centerline of the formation in Plover
Street to the proposed carport;
d) a driveway designed generally in accordance with Council’s standard drawings
RS-049 and RS-050;
e) demonstrate that a B99 vehicle will not bottom out or scrape entering/exiting the
driveway;
f) the necessary stormwater drainage structures.
RESPONSE
Please refer to the revised Design Plans prepared by Clare Design in Attachment 1 and the Civil Design Plans
prepared by BG & E Engineering in Attachment 2. It is still proposed to realign the driveway to appropriately
service the new carport. The plan sets include the following detail in response to the above items raised:
• plan of the driveway in relation to all the existing vegetation, clearly showing vegetation that will need
to be removed (page 5 of Attachment 2 PDF);
• levels and grades of the access driveway (page 5 of Attachment 2 PDF);
• carport finished floor level of 10.81m (pages 5 & 7 of Attachment 1 PDF);
• a longitudinal section extending from edge of Plover Street to the proposed carport (page 7 of
Attachment 1); and,
• plan demonstrating that a B99 vehicle will not bottom out or scrape entering/exiting the driveway (page
6 of Attachment 2 PDF).
Further, whilst the driveway is designed generally in accordance with Council’s standard drawings RS-049 and
RS-050, the Civil Engineer has identified that “the crossover provided is a non-standard vehicle crossover with a
rise of 50mm (min) instead of the 300mm (min) required in QUDM/Council development Guidelines. This is in line
with the existing driveway and other properties in the vicinity have similar driveways”.
Finally, as per the notes imposed on the revised Design Plans in Attachment 1, the existing driveway stormwater
infrastructure is to be relocated to the new driveway alignment. Additional detail around the onsite stormwater
management is not necessary to be provided on the basis that the roof area and impervious areas remain largely
unchanged by the proposal.
Our ref: 211101 Page 2 of 3
Page 3
This represents our complete response to the Information Request issued by Council, and we look forward to
the Decision Notice being issued in accordance with the relevant provisions of the Planning Act 2016.
As always, please feel free to contact me direct should you require any additional information or clarification.
Yours faithfully,
ADAMS + SPARKES
TO WN P L AN N IN G
Aspen Dunn
TOWN PLANNER
Encl: Revised Design Plans prepared by Clare Design (Attachment 1)
Civil Design Plans prepared by BG & E Engineering (Attachment 2)
Our ref: 211101 Page 3 of 3
Page 4
6000 SITE ADDRESS
38 PLOVER STREET, PEREGIAN BEACH
TUMEN
RPD
EDGE OF BI
LOT 12 ON P9313
new window awning
90D
33.561
2D13'20"
8500
00
GENERAL NOTES
15.088
90
DO NOT SCALE FROM DRAWINGS
ALL DIMENSIONS MUST BE CHECKED ON SITE
PLOVER S REET
remove existing driveway PRIOR TO CONSTRUCTION
Proposed relocated driveway 7° SURVEYOR TO CONFIRM BOUNDARY
Refer to engineers drawings LOCATIONS TO ESTABLISH REQUIRED
182D13'20"
SETBACKS
7°
15.088
DBYD- DIAL BEFORE YOU DIG. LOCATE ALL
new roof new roof. SERVICES PRIOR TO COMMENCEMENT OF
extend from existing CONSTRUCTION
EXISTING HOUSE 7° PLANS BASED ON DRAWINGS SUPPLIED.
ALL DIMENSIONS AND BUILDING LOCATION
new awnings MUST BE CHECKED ON SITE BY A LICENSED
SURVEYOR
TUMEN
box gutter RS2
NOTE:
new roof- translucent 1.5° SEWER LINE LOCATION AND LOCATION OF ALL
sheet
EDGE OF BI
RS1 SERVICES TO BE ESTABLISHED PRIOR TO ANY
CONSTRUCTION
1.5°
1500
RS1 TERMITE MANAGEMENT
33.561
MAX 9000 270D
new boundary/ PROVIDE APPROVED PHYSICAL BARRIERS TO PROTECT THE
carport wall STRUCTURE FROM SUBTERRANEAM TERMITES.
TERMIMESH (OR SIMILAR APPROVED SYSTEM) STRIP AND CAP
SHIELDS TO BE INSTALLED BY A LICENSED OPERATOR TO
COMPLY WITH AS3660.1
INSULATION
NEW ROOF (WHERE APPLICABLE) - TO ACHIEVE R-VALUE 4.1
ROOF COLOUR TO MEET UPPER SOLAR ABSORPTANCE VALUE OF
LESS THAN 0.4
SITE REFER TO COLORBOND STEEL STANDARD COLOURS FOR
1 1 : 200
SUITABLE COLOUR SELECTION
NEW WALLS- TO ACHIEVE R-VALUE 2.8
SMOKE ALARMS
SMOKE ALARMS- TYPES AND LOCATIONS TO COMPLY WITH
CURRENT SMOKE ALAM LEGISLATION AND AS 3786:2014
PROPOSED CARPORT TO EXISTING RESIDENCE SITE
2023 38 PLOVER STREET, PEREGIAN BEACH DWG 01
FEB REV A
20
Scale 1 : 200
Date 20 FEB 2023
Page 5
5 z
” 2
m Wi 2 g
>
eke 5 oS 2 x
Sat ee g 3io0 1.8
S| Su é = S- i > 3 |]ean > 6
O|23 g <2 3 2]/S8N | 3 8
OZ 2 k fon) = - 4 | & 5 6
oO 23 oaks woo a & § iD 2 3
23 5 $85 = x o g aa 5 4%
ans a 2% 83a E Q no o N
Be @ 88ge WW 52Z 2 Nn 3 8
WO 3% 438 $39 e Le G Z S =
~~ =e e8Oree > HO 8 5 a 288
SEE . 8
qt +0 gs sssk Y aN 2 a> 85
Sag a me Of 28 ce 82
Oo : 6 Zw —- Beg 56 a
aO8es§ . © 4 a Ree Be gs
sQce8& g $975 RE g 9 #28 og Be
= # 2 = ; e
en a ge | = 2&ty ge 55
a & Ss w® —€ ze & ga 23
o 0 3s 22 ¢ Wiaog Po
z= a! = BBS 8 52% 3
1 o 08 Qes §
8 3 St
ve 3
NAN
a
c « ae wOGEL oCSL zt
y 5 _
7 Ss spsogas sojemAy
eee em
= &
4 “FE
=
2]
se —“F L
a | fo
4 8
7: BBDOL BRIN RVYVVK. 8
YK’. DS ve25 05 $0 a,
S899993%5 5333599995 99095 995 S353 <4 2
« BEE Secret a 8
oT 325825
= OO
355%
RI
RNY!
ge Soy
5 2 Bs’
D2 23252823
= RK
c BBB b
oo SOX>eI
oO SB:
2 SBS259535
S SRD
& wo SRNR
5-4 S25 25252%
x |= 535333595
' SII B
pees
8 BH >
ee eects $25) g aS
. RYN ¢ s Ox
se Rd ale 5 &
8 RNS od n S. &. 5
252525292) 6 o- $
2 > ON
a7 BY RBIS: sacecacececee «Ser tone
IV BERBERS ome BOHR “e,
pete 6 ENR SRR T
~” 23232825) Ss 525252 S38 52525252 525252) 25> S555 2525252. 5
4 SRRSNLS ic SBIR 9999298 90999999: > F555 2525
” OSs 955252 ” B3239333339239 992. SMO. BIRR
~ 252525252) 335252925 525252525292 52525252 252521 SS SBS25 25252. 50
To SHYHB asec ececececectctcecececece S25523292 S93 9393989939)
S SBKRYKNYVK VNR 5.25252: SSPB5 252535252"
a BERdI32 BNR IDR. BRRKNYNYNRKNY. S535 2525252:
33992829) SYBBYBVYBrvorrwroorry SF 525252 SR RRNINI?
48 peececece secececececececececece SORKIN NR. SFT NF
52529352) BHR Soro NIOND?: @
= x94 BRR NS S555" pacerecerecers =
$2525 BERBER RET NE ere ceceterens o
$5252. BERR ORI SSSS5Y
939393 SR RRS Soo N39092 5
S558) SFT SSS ooo ooo 2252S Nd
52. S555 52% 3352925292 SBN N298: srecececece
939393939: 3338 BPN IIIIINII IT, 5525252 52525353525
S2532525: tl eetetatatatetets BRN
12925252524 o BBB BY pYoseryvooeryvoov> S585 255%%
$$ ._ f= BBR YRK NNR 5252. BBRNYRVR NP
550504 959335339 952993 9 9525999 95952590905 S855:
555% oo ecetacecetacecetacceetacecetaceeetatete 5252535 28292523
232325232 SSS 8e. S255 25825885. acaceerecens
$525 S885 5252925 SBN. 525232925252
BIB ex LD % 3252533952599 RR SBN al|6
BRRK: 8 Ie SBS S5 25882! OO S. SRO =a
x > es
93522 7 3 Q XX
252525252" &, S258N25:
S5252525: _¢ 552529 ~
52525252 5S BOR >I9% wer
BOS ° 35522 o
S229) sro) 33333. ™
325539 SRR a
520299335 NS
RRR 332505252
» >
% es SE
a 3323S 593239395
ae 3 RRS SRNR 3329833
wg S QR’ S335 2525252 0505093 S33
és 5 OBIISe BRR x OOO
w 5258232) OYYBOB ooops $ S25252825
5s y 2 SE 33393539399 99939399 9899) 525259921
os 3 3 SANP55 202: 8 \) S85939535
BR Ep. « BBNINN52
ze z Ee 5 w 4 BORN)
Ze Bey, 33 BBR
5 5 & & Eg 2 Se SBI
oH x= 5 32525:
be Gane EEE EE Sea
l es 25258 533339333
»
®) aN E Bre ROQOD:
©
ss
E
— —___
—E————_.
3 <
E « ae a o.
8 2 Be Sp — a ee |
3 22 88 She Sy
2 _
4 g2,8y 85 BR He) ~
a | cbiaead: TPE ey
2 g att
9 3] 2
| g D> L3A3YLS dasa : %.
& } Ps
By lt! § "No Od “t
| \ =
os
Z| | | gs Zz ®,
ay | Be Sey
| | ‘ 33 >,
| ar oh
®
Page 6
TUMEN
EDGE OF BI
12000
10500
11000
11500
0
00 00 00 0
10 95 80 750
UP
EXISTING STORE
GRATED DRAIN
10500
11000
FL 10190
FL10890
11500
EXISTING
RESIDENCE
FL10890 drainage under
FL 10890
E
UP
TUMEN
IO
EDGE OF BI
E SWP SWP
E
11000
10500
12000
11500
8000
75
00
WM
E
WM
REMOVE EXISTING ON-SITE TREES TO
ACCOMMODATE FOR THE NEW
DRIVEWAY
GROUND FOOR PLAN- EXISTING
1 1 : 100
PROPOSED CARPORT TO EXISTING RESIDENCE GROUND FLOOR PLAN- EXISTING
DWG 02.0
38 PLOVER STREET, PEREGIAN BEACH
REV
Scale 1 : 100
Date 20 FEB 2023
Page 7
UP
UPPER FLOOR- EXISTING
1 1 : 100
[OCR of page images]
wn UPPER FLOOR- EXISTING
\i/ 4:100
Page 8
3
13000 05.0
6000 1 1 2
04.1 04.3 04.3
6754 1370
2940
6m SETBACK
TUMEN existing stair
90 3474 90 4350 90
EDGE OF BI
10500
11500
11000
12000
0
9500
00 00 750
0
10 NEW 80
TERRACE
FL1
NEW LANDSCAPED W05
W03 W04
BANK
90
D02
BUNK ROOM BED ROOM
FL2
robe
robe
FL2
NEW STEP
new beam over to
12870 new beam over to
3855
engineers detail
engineers detail
D03
10500
11000
11500
sc dp
desk
W02
3 2 1 D05 D06
8030
90 1155 90
NEW 4
LANDSCAPED 5
low wall
STEPS 6 D01 FL 9780 D04
EXISTING
FL 9420 FAMILY ROOM
sc
12790
D08 D07
t wm
sc FL 9440
FL10810 LAUNDRY/ NEW
2660
W06 GARDEN
SURBOARDS BATHROOM
W01 FL3
/STORE
PROPOSED RELOCATED DRIVEWAY FL2
RELOCATE EXISTING DRIVEWAY SW PITS
dp
CONNECT TO EXISTING STORMWATER LINE 90 sc sc sc 1 2 3 4 5
2 2
12730 GATE
2 04.1 2 04.1
10
04.2 04.2
GATE 9 1
2
E FL10810 8 7 6 5 4 3
1 SAWCUTS 1
4597
NEW CARPORT
ROOF OVER
TO PATHWAY
TUMEN
04.0 FL1
04.0
RETAIN TRANSLUCENT ROOF
EXISTING SHEET OVER
PANDANUS SWP IO
EDGE OF BI
E SWP
ROOF OVER NEW STAIRS
1 1
11000
10500
11000
E
12000
11500
8000
RELOCATED SW PITS GARDEN
75
04.2 04.2
00
CONNECT TO EXISTING STORMWATER LINE
190
WM
E
80
12570
WM
90 2264 90 1600 90 2470 90
6694
REMOVE 8051 9000 MAX
EXISTING
TREES AS
REQUIRED
1
04.1
2
3 1
04.3
05.0 04.3
GROUND FLOOR- PROPOSED
1 1 : 100
PROPOSED CARPORT TO EXISTING RESIDENCE GROUND FLOOR- PROPOSED
DWG 03.0
38 PLOVER STREET, PEREGIAN BEACH
REV A
Scale 1 : 100
Date 20 FEB 2023
Page 9
1 1 2
04.1 04.3 04.3
6050
spitter
EXISTING BEDROOM 1
DP
NEW
SCREEN
REMOVE SECTION OF
EXISTING BEAM OVER
BOX GUTTER
D1.02
D1.01 NEW
STAIRS
tp
tp tp
1.3 EXISTING BEDROOM 2 EXISTING
EXTENSION TO
BATHROOM EXISTING DECK
1.5° W1.1
EXIST WC
OVERFLOW
1.5° W1.2
2 2
2 04.1 RS2 2 04.1
04.2 04.2
1.5°
1 1
04.0 RS1 04.0
OVERFLOW
1.5° NEW STAIRS
1 1
1490
REMOVE EXISTING DECK TO ACCOMMODATE
04.2 RS1 04.2
17051
1 1 2
04.1 04.3 04.3
UPPER FLOOR- PROPOSED
1 1 : 100
PROPOSED CARPORT TO EXISTING RESIDENCE LIVING. BED 1
DWG 03.1
38 PLOVER STREET, PEREGIAN BEACH
REV
Scale 1 : 100
Date 20 FEB 2023
Page 10
NEW ROOF- RS1
NEW TRANSLUCENT ROOF- RS2
EDGE OF BITUMEN
NEW WINDOW AND HOOD (AH) EXISTING ROOF
EXISTING DRIVEWAY
BOUNDARY
NEW SCREENS
PROPOSED
NEW
DRIVEWAY
FL W1.2
G EXISTING
COURTYARD
TP TP LIVING
2320
NEW TANDEM PARKING 12060
2620
1500MM FAMILY
ROLL
UNDER 9440
EXISTING DRIVEWAY- RED DASHED LINE
Section 1
1 1 : 100
NEW STAIR
6M SETBACK UPPER CARPORT/ ENTRY ROOF
LOWER CARPORT ROOF SHOWN DASHED
4500 abov
e natural gr
ound
W1.2
proposed new driveway beyond EXISTING HOUSE
3500 MAX MEAN HEIGHT
11.3°
3940
PROPOSED CARPORT LEVEL
10810
9000 MAX LENGTH ON BOUNDARY
SOUTH ELEVATION GROUND LINE AT BOUNDARY
2 1 : 100
PROPOSED CARPORT TO EXISTING RESIDENCE SECTION 1
DWG 04.0
38 PLOVER STREET, PEREGIAN BEACH
REV A
Scale 1 : 100
Date 20 FEB 2023
Page 11
BOUNDARY
STORE BEDROOM
NEW GARAGE
W01
SLAB W02
PROPOSED CARPORT LEVEL
D01 robe
10810
desk
NEW ROOMS
9780
Section 2
1 1 : 100
NEW WINDOW AND EXISTING ROOF AND STRUCTURE
HOOD (AH) EXTEND EXISTING ROOF OVER NEW STAIR
NEW TRANSLUCENT
ROOF- RS2
NEW
SCREEN
W1.2
G
BAL1
NEW STAIR
BED 1
12810 EXISTING
LIVING
12060
PROPOSED CARPORT LEVEL
10810
GARAGE LEVEL- EXISTING
10190
FAMILY
9440
BLOCK WALL UNDER
NEW GARAGE FLOOR
TO ENGINEERS DETAIL
Section 3
2 1 : 100
PROPOSED CARPORT TO EXISTING RESIDENCE SECTIONS 2
DWG 04.1
38 PLOVER STREET, PEREGIAN BEACH
REV A
Scale 1 : 100
Date 20 FEB 2023
Page 12
EXISTING
NEW CLADDING EXISTING
NEW HOOD
NEW WINDOW
NEW CARPORT
CL1
W1.2
2273
CL1
PROPOSED CARPORT LEVEL
10810
NEW ROOMS
9780
Section 4
1 1 : 100 NEW STAIR
EXISTING
LIVING
12060
PROPOSED CARPORT LEVEL
10810
EXISTING COURTYARD
EXISTING
FAMILY
9440
Section 5
2 1 : 100
PROPOSED CARPORT TO EXISTING RESIDENCE SECTIONS 3
DWG 04.2
38 PLOVER STREET, PEREGIAN BEACH
REV
Scale 1 : 100
Date 20 FEB 2023
Page 13
EXISTING ROOF
W1.1
D1.01
BED 1
12810
W06
D04 D03
NEW ROOMS
FAMILY 9780
9440
EXISTING GARDEN EXISTING GARDEN
Section 6
1 1 : 100
NEW EXISTING VERANDAH ROOF
OVER EXTERNAL STAIR
EXISTING
AH
NEW
SCREENS
W1.1
D1.01
BAL1
CL1
BED 1
AH
12810
NEW STAIR LIVING
12060
W06 CL1
PROPOSED CARPORT LEVEL
D04 D03
10810 CL1
NEW ROOMS
FAMILY 9780
9440
Section 7
2 1 : 100
PROPOSED CARPORT TO EXISTING RESIDENCE SECTIONS 4
DWG 04.3
38 PLOVER STREET, PEREGIAN BEACH
REV
Scale 1 : 100
Date 20 FEB 2023
Page 14
REDUCE EXENT OF EXISTING
SCREEN AS INSTRUCTED BY NOTE
ARCHITECT ON SITE
DO NOT SCALE FROM DRAWINGS
SCREEN OMITTED FOR CLARITY
ALL DIMENSIONS MUST BE CHECKED ON SITE PRIOR TO CONSTRUCTION
EXISTING TIMBER DRAWINGS ARE NOT FOR CONSTRUCTION PURPOSES
LOUVRES
CL1
NEW SCREENS AND
GATE AROUND ENTRY
BED 1
new weather 12810
LIVING W05 protection hood
12060
W04 W03
PROPOSED CARPORT LEVEL
D02
CL1 10810
NEW ROOMS
FAMILY 9780
9440
NEW CLADDING
COURTYARD WALL SHOWN
TRANSLUCENT FOR CLARITY
NORTH ELEVATION
1 1 : 100
new hood
BED 1 BED 1
12810 12810 DP DP
DP
W01
W01
W02
D01
GARAGE LEVEL- EXISTING
10190 NEW ROOMS
9780
450
WEST ELEVATION Section 8/ WEST ELEV
2 1 : 100
3 1 : 100
PROPOSED CARPORT TO EXISTING RESIDENCE ELEVATIONS 2
DWG 05.0
38 PLOVER STREET, PEREGIAN BEACH
REV A
Scale 1 : 100
Date 20 FEB 2023
Page 15
Door Schedule Window Schedule
Mark Height Width Comments Level Mark Width Height Comments Level
D01 2040 920 TIMBER FRAMED GLASS DOOR (EXT) NEW ROOMS W01 1750 600 LOUVRES NEW ROOMS
D02 2040 820 TIMBER FRAMED GLASS DOOR (EXT) NEW ROOMS W02 1200 1300 LOUVRES NEW ROOMS
D03 2100 3000 TIMBER FRAMED GLASS DOOR (EXT) NEW ROOMS W03 2400 800 LOUVRES NEW ROOMS
D04 2040 920 SOLID CORE DOOR. PAINT FINISH NEW ROOMS W04 2050 800 LOUVRES NEW ROOMS
D05 2100 820 SOLID CORE DOOR. PAINT FINISH NEW ROOMS W05 300 2100 LOUVRES NEW ROOMS
D06 2040 820 SOLID CORE DOOR. PAINT FINISH NEW ROOMS W06 2700 800 LOUVRES NEW ROOMS
D07 2040 820 HOLLOW CORE DOOR. PAINT FINISH NEW ROOMS W1.1 2700 800 BED 1
D08 2032 920 HOLLOW CORE DOOR. PAINT FINISH NEW ROOMS W1.2 1000 1200 BED 1
D1.01 2040 820 SOLID CORE DOOR. PAINT FINISH BED 1
D1.02 2040 820 SOLID CORE DOOR. PAINT FINISH BED 1
NOTE: ANY OVERSIZED LOUVRES TO BE STRONGHOLD
ANY LOUVRE BANKS IN BEDROOMS OR ABOVE 1M FROM THE GROUND TO COMPLY WITH SAFETY FROM FALLING REQUIREMENTS
PROPOSED CARPORT TO EXISTING RESIDENCE SCHEDULES
DWG 06.0
38 PLOVER STREET, PEREGIAN BEACH
REV
Scale
Date 20 FEB 2023
Page 16
HOME RENOVATION
38 PLOVER STREET, PEREGIAN BEACH
STRUCTURAL DRAWING SCHEDULE
DWG No. TITLE
SK01.00 COVER SHEET
SK01.01 TYPICAL DETAILS
SK01.02 SLAB ON GROUND
SK01.03 RETAINING WALL LAYOUT
38 PLOVER STREET, FOR CONSTRUCTION COVER SHEET
A 13.02.23 FOR CONSTRUCTION BDS
PEREGIAN BEACH BK BK BDS BDS
1:100 3 B21132 SK01.00 A
Page 17
55 CLEAR
REFER TO PLANS FOR
SLAB THICKNESS UNO
55 CLEAR COVER
COVER
REFER TO PLANS FOR
REINFORCEMENT UNO N16-400
BLOCKWORK
N12-400 STARTER BARS 3 MIN.
BLOCKWORK
3 MIN. 1
STARTER BARS 55 CLEAR
.
1
55 CLEAR COVER MAXIMUM SLOPE OF
.
REFER ARCH. FINISHED SURFACE.
COVER MAXIMUM SLOPE OF
FOR FALLS FINISHED SURFACE.
190 BLOCKWORK CORE FILL BLOCKWORK WITH 20
200
MPa CONCRETE AND 10mm
CORE FILL BLOCKWORK WITH 20
AGGREGATE.
MPa CONCRETE AND 10mm
LINE OF EXCAVATION
190 BLOCKWORK
DAMP PROOF FOR SUBGRADE COMPACTED SAND AGGREGATE. CLEAN COMPACTED GRANULAR
LINE OF EXCAVATION
N16-400
MEMBRANE TYPICAL COMPACTION REFER TYPICAL 200 CENTRAL BACKFILL TO 98% STANDARD
N12-400
TO SPECIFICATION CENTRAL COMPACTION.
'H'
CLEAN COMPACTED GRANULAR
TYPICAL
BACKFILL TO 98% STANDARD
'H'
N12-400 LAP AS GEOTEXTILE CORE DRAIN. TYPICAL.
COMPACTION REQUIRED.
B1 EDGE
N12-400 LAP AS
TYP. ET REQUIRED. GEOTEXTILE CORE DRAIN. TYPICAL.
TYPICAL SLAB ON GROUND DETAIL THICKENING DETAIL DRAINAGE TO HYDRAULIC 50
DRAINAGE TO HYDRAULIC
ENGINEERS DETAILS.
50 ENGINEERS DETAILS F.G.L.
F.G.L.
300
200
N16-400
N12-400
FORMED KEY JOINT RECESS FOR 1000 N16-200 E.W. TOP & BTM
REFER DETAIL GRATE COVER N12-200 E.W. TOP & BTM
1600
MAX
300
H = 1200 MAX
H = 1200 - 1800 MAX
TYPICAL RETAINING WALL TYPE 1 TYPICAL RETAINING WALL TYPE 2
1N12 CONTINUOUS
150
LAP AS REQUIRED
4N12
150 450 150 N12-300
MAX
3 MIN.
.
55 CLEAR 1 MAXIMUM SLOPE OF
COVER FINISHED SURFACE.
GRATED DRAIN 190
140 BLOCKWORK. CORE FILL BLOCKWORK WITH 20 MPa
CONCRETE AND 10mm AGGREGATE.
WATERPROOFING TO ARCHITECTS DETAILS.
N12-400.
CENTRAL
'H'
DISCONTINUE MESH 75 N12-400
EACH SIDE OF JOINT LAP AS REQUIRED.
CLEAN COMPACTED GRANULAR BACKFILL
6 x 50mm HOT DIP GALV. SAWCUT 30mm DEEP x 6mm WIDE. SLAB TO TO 98% STANDARD COMPACTION.
30 DEEP BE CUT AS SOON AS CUTTING EQUIPMENT SL62 MESH.
DANLEY PLATE DOWELS 50
SAWN JOINT SUPPORTED IN A CRADLE CAN BE PLACED ON SLAB. BUILDER TO
F.G.L.
AT 450 MAXIMUM CRS. DETERMINE CORRECT TIME TO SAW WITHIN
EQ
200
S.F.L. 24 HRS OF POUR
N12-400
200
600 N12-200 E.W. TOP & BTM
EQ
PLATES TO BE GROUND CRACK
SLEEVED ON INDUCER CUT OUT 100 LENGTH OF EVERY 2ND WIRE H = 800 MAX
300 300
ALTERNATIVE CENTRED UNDER JOINT & DEPRESS MESH LOCALLY
TYPICAL RETAINING WALL TYPE 3
SIDES OF JOINT TO MAINTAIN COVER. ALTERNATIVELY, STOP
REINFORCEMENT 30mm EITHER SIDE OF SAWCUT
DOWELLED JOINT (DJ) SAWN JOINT
DENOTED SJ ON PLAN
(POUR OVER)
TENSION LAP CORNER BARS TO MATCH HORIZONTAL TENSION LAP
WALL REINFORCEMENT. TYPICAL.
CORNER BLOCK
TENSION LAP
CORES FILLED CORES FILLED
f'c = 20MPa TYPICAL f'c = 20MPa TYPICAL
TENSION LAP
CORNER BARS TO MATCH HORIZONTAL
DOUBLE 'U' BLOCKS. WALL REINFORCEMENT. TYPICAL.
TYPICAL.
DOUBLE 'U' BLOCKS. TYPICAL.
TYPICAL JUNCTION DETAIL TYPICAL CORNER DETAIL
SCALE 1 : 10 SCALE 1 : 10
38 PLOVER STREET, FOR CONSTRUCTION TYPICAL DETAILS
A 13.02.23 FOR CONSTRUCTION BDS
PEREGIAN BEACH BK BK BDS BDS
1:100 3 B21132 SK01.01 A
Page 18
existing stair
6m SETBAC
TUMEN
90 3474 90 4350 90
EDGE OF BI
10500
11500
11000
12000
0
9500
00 00
10 NEW 80
TERRACE
FL1
NEW LANDSCAPED W05
W03 W04
BANK
90
D02
BUNK ROOM BED ROOM
FL2
robe
robe
FL2
- NEW STEP
new beam over to
12870 new beam over to
3855
engineers detail
engineers detail
---
D03
10500
11000
11500
sc dp
desk
W02
3 2 1 D05 D06
8030
90 1155 90
NEW
LANDSCAPED
GRATED DRAIN 4
5
REFER DETAILS
low wall
STEPS 6 D01 FL 9780 D04
EXISTING
FL 9420 FAMILY ROOM
SJ
sc
12790
D08 D07
t wm
sc FL 9440
ET1 FL10810 ET1 LAUNDRY/ NEW
2660
W06 GARDEN
SURBOARDS BATHROOM
ET1
W01 FL3
/STORE
PROPOSED
SJ
FL2
NEW DJ dp
DRIVEWAY 90 sc sc
DJ
sc
ET1
1 2 3 4 5
2
12730 2 GATE 2
SJ
04.1 100 10
04.2 GATE 9 1 04.2
SOG 2
DJ
SJ
DJ
E FL10810 8 7 6 5 4 3
SAWCUTS
SJ
4597
NEW CARPORT
ROOF OVER
TO PATHWAY
TUMEN
RETAIN ET1 TRANSLUCENT ROOF
FL1
EXISTING SHEET OVER
PANDANUS SWP IO
EDGE OF BI
E SWP
ET1
ROOF OVER NEW STAIRS
11000
10500
11000
E
12000
11500
8000
RELOCATE SW PITS GARDEN
75
ET1
00
190
WM
E
80
12570
WM
90 2264 90 1600 90 2470 90
6694 SLAB ON GROUND SCHEDULE
REMOVE 9000 MAX DENOTED 100 THICK SLAB ON
EXISTING
8051 ET1 . . . DENOTES EDGE 100
GROUND WITH SL82 MESH
TREES AS THICKENING 1 - REFER DETAILS SOG
CENTRALLY
SJ . . . DENOTES SAWN JOINT - ALL SLABS TO BE CAST ON
REFER DETAILS LEVEL 1 COMPACTED FILL, 50mm
BEDDING SAND AND 20um
DJ . . . DENOTES DOWEL JOINT - VAPOUR BARRIER. ALLOWABLE
REFER DETAILS BEARING CAPACITY 120kPa
DENOTES 2N12 TRIMMER BARS ALL SLABS TO BE 32MPa
CONCRETE
38 PLOVER STREET, FOR CONSTRUCTION SLAB ON GROUND
A 13.02.23 FOR CONSTRUCTION BDS
PEREGIAN BEACH BK BK BDS BDS
1:100 3 B21132 SK01.02 A
Page 19
EXISTING FL10.89
NEW FL10.81
existing stair
6m SETBAC
TUMEN
90 3474 90 4350 90
FL10.19
EDGE OF BI
FL9.78
10500
11500
11000
12000
0
9500
00 00
10 NEW 80
TERRACE
FL1
W05
ENSURE ALLOWABLE
NEW LANDSCAPED
W03 W04
BANK
BEARING CAPACITY
90
OF 120kPa D02
BUNK ROOM BED ROOM
SECTION A FL2
robe
robe
FL2
- NEW STEP
new beam over to
12870 new beam over to
3855
engineers detail
engineers detail
---
D03
10500
11000
11500
sc dp
desk
W02
D05 D06
STARTER BAR TO 3 2 1
8030
90 1155 90
NEW 4
MATCH BLOCK
LANDSCAPED 5
low wall
STEPS 6 D01 FL 9780 D04
WORK FL 9420
EXISTING
ET01 D08 D07
sc
FAMILY ROOM
12790
CAPPING BRICK sc
t wm
FL 9440
FL10810 LAUNDRY/ NEW
2660
W06 GARDEN
W01
SURBOARDS
/STORE
AFL3
BATHROOM
PROPOSED
REFER TO DETAILS FOR NEW
FL2
REINFORCEMENT DRIVEWAY 90
dp
sc sc sc 1 2 3 4 5
12730 2
ENSURE ALLOWABLE
2
GATE 2
04.2
BEARING CAPACITY
04.1 10
04.2
OF 120kPa GATE 9 1
2
FL10810
SECTION B
8 7 6 5 4 3
E SAWCUTS
4597
NEW CARPORT
ROOF OVER
TO PATHWAY
TUMEN
FL1
RETAIN TRANSLUCENT ROOF
EXISTING SHEET OVER
PANDANUS SWP IO
EDGE OF BI
E SWP
ROOF OVER
B NEW STAIRS
11000
10500
11000
E
12000
11500
8000
RELOCATE SW PITS GARDEN
75
00
190
WM
E
80
12570
WM
90 2264 90 1600 90 2470 90
6694
RETAINING WALL TYPE 1 - REFER DETAILS
RETAINING WALL TYPE 2 - REFER DETAILS
REMOVE 8051 9000 MAX
EXISTING RETAINING WALL TYPE 3 - REFER DETAILS
TREES AS
EXISTING BLOCKWORK
EXTENT TO BE CONFIRMED BY BUILDER
FOOTING ORIENTATION
ASSUMPTIONS TO BE CONFIRMED BY QUALIFIED
GEOTECHNICAL ENGINEER:
- ALLOWABLE BEARING CAPACITY OF 120kPa
- NO GROUND WATER IS PRESENT
38 PLOVER STREET, FOR CONSTRUCTION RETAINING WALL
PEREGIAN BEACH BK BK BDS BDS LAYOUT
A 13.02.23 FOR CONSTRUCTION BDS
1:100 3 B21132 SK01.03 A
Page 20
E
Pas enger vehicle (5.2 m)
EE
LOT 13
E
P9313
E
FOR VERTICAL ALIGNMENT
E
REFER C-SK002
E
E
E
TREET
E
PLOVER S
E
E
E
E
E
12.80
12.85
E
12.78
LOT 12
12.48 P9313
E
11.14 10.89
3.50m
E
12.8
9.0% 3.5% 15.0%
12.8
12.7
12.6
E
12.5
12.4
12.3
12.2
12.1
12.0
11.9
11.8
11.7
11.6
11.5
11.4
E
11.3
11.2
11.1
E
11.0
12.74 12.85 25.0%
E
E
12.5% E
5.90m
12.78 E
E
E PROPOSED CARPORT
E
E
12.48 E
E
E
E
E
E
E
EXISTING TREE E
TO REMAIN E
E
11.13
LEGEND WM 10.89
5.2
SITE BOUNDARY
WM
E
EXISTING CONTOUR
??.?? DESIGN CONTOUR MAJOR
E
DESIGN CONTOUR MINOR
CHANGE OF GRADE
E
12.69 PROPOSED LEVEL 0.95 3.05
FALL% PROPOSED GRADE
E
BUILDING WORKS
Car/van Vertical Clearance
CONCRETE DRIVEWAY
E
Overall Length 5.200m
LOT 11 Overall Width 1.940m
P9313 Overall Body Height 2.200m
E
Min Body Ground Clearance 0.100m
Track Width 1.840m
E
Lock-to-lock time 4.00s
Curb to Curb Turning Radius 6.300m
E
0 0.5 1.0 1.5 2.0 2.5 3.0m
SCALE 1:50 AT A1 SIZE
CLIENT PROJECT STATUS TITLE
Brisbane Office PROPOSED DRIVEWAY
70-72 Bowen St, Spring Hill QLD 4000
PROPOSED CARPORT AND CARPORT LAYOUT
DRAWN DESIGNED CHECKED APPROVED
C
B
17.02.23
18.11.22
FOR APPROVAL
REVISED DRIVEWAY ALIGNMENT
JC
PH P / +61 7 3167 3300 38 PLOVER STREET, PH PH JC JC PLAN
A 27.09.22 PRELIMINARY FOR DISCUSSION PH E / [email protected]
REV DATE DESCRIPTION RVD REV DATE DESCRIPTION RVD bgeeng.com PEREGIAN BEACH DATUM GRID SCALE PROJECT No. DRAWING No. REV.
REVISIONS
P:\BGE\BNE\B21132\100 DRAWINGS\102 CIVIL\AUTCAD\B21132-DRG-C-SK001.DWG
REVISIONS 1:50 AT A1 SIZE B21132 SK-C-0001 C
17/02/2023 4:45:25 PM
C BG&E Pty Limited
Page 21
PROPOSED CARPORT PROPOSED DRIVEWAY PLOVER STREET ROAD RESERVE
PROPOSED DRIVEWAY
SURFACE. FOR GRADES
AND LEVELS REFER
PLAN
PROPOSED CARPORT PROPOSED DRIVEWAY PLOVER STREET ROAD RESERVE
PROPOSED DRIVEWAY
SURFACE. FOR GRADES
AND LEVELS REFER
PLAN
5.2
0.95 3.05
Car/van Vertical Clearance
Overall Length 5.200m
Overall Width 1.940m
Overall Body Height 2.200m
Min Body Ground Clearance 0.100m
Track Width 1.840m
Lock-to-lock time 4.00s
Curb to Curb Turning Radius 6.300m
0 0.5 1.0 1.5 2.0 2.5 3.0m
SCALE 1:50 AT A1 SIZE
CLIENT PROJECT STATUS TITLE
Brisbane Office PROPOSED DRIVEWAY
70-72 Bowen St, Spring Hill QLD 4000
PROPOSED CARPORT AND CARPORT
DRAWN DESIGNED CHECKED APPROVED
P / +61 7 3167 3300 38 PLOVER STREET, PH PH JC JC VERTICAL CLEARANCE
A 17.02.23 FOR APPROVAL PH E / [email protected]
REV DATE DESCRIPTION RVD REV DATE DESCRIPTION RVD bgeeng.com PEREGIAN BEACH DATUM GRID SCALE PROJECT No. DRAWING No. REV.
REVISIONS
P:\BGE\BNE\B21132\100 DRAWINGS\102 CIVIL\AUTCAD\B21132-DRG-C-SK001.DWG
REVISIONS 1:50 AT A1 SIZE B21132 SK-C-0002 A
17/02/2023 4:45:00 PM
C BG&E Pty Limited
Page 22
Form 15 Compliance certificate for building design or specification
This form is to be used by an appointed competent person for the purposes of section 10 of the Building Act 1975 and sections
73 and 77 of the Building Regulation 2021 (Design-specification certificate) stating that an aspect of building work or
specification will, if installed or carried out as stated in this form, comply with the building assessment provisions.
Additional explanatory information is included in the Appendix at the end of this form.
1. Property description
This section need only be completed if details of street address and property description are applicable.
E.g. in the case of (standard/generic) pool design/shell manufacture and/or patio and carport systems this section may not be
applicable.
The description must identify all land the subject of the application.
The lot and plan details (e.g. SP/RP) are shown on title documents or a rates notice.
If the plan is not registered by title, provide previous lot and plan details.
Street address 38 Plover St
Suburb/locality Peregian Beach
State QLD Postcode 4573
Lot and plan details (attach list if necessary)
Local government area the land is situated in
2. Description of aspect/s certified
Clearly describe the extent of work covered by this certificate, e.g. all structural aspects of the steel roof beams.
Driveway slab on ground and retaining walls.
3. Basis of certification
Detail the basis for giving the certificate and the extent to which tests, specifications, rules, standards, codes of practice and
other publications were relied upon.
Building Regulation 2021 • Section 73 and 77 • Form 15 • Version 1 • September 2021 Page 1 of 4
Page 23
We certify that we have taken reasonable care to design the structural elements in accordance with the National Construction Code
(NCC), relevant Australian Standards and accepted engineering principles, including:
• Structure importance level 03 to the NCC/ BCA.
• AS1170 Parts 0, 1, 2 and 4.
• AS3600
• AS4678
4. Reference documentation
Clearly identify any relevant documentation, e.g. numbered structural engineering plans.
BG&E Structural Drawings:
SK01.00
SK01.01
SK01.02
SK01.03
5. Building certifier reference number and building development approval number
Building development
Building certifier reference
application number (if
number
available)
6. Appointed competent person details
Under Part 6 of the Building Regulation a person must be assessed as a competent for the type of work (design-specification)
by the relevant building certifier.
Name (in full) Bruce Street
Company name (if applicable) BG&E
Contact person Bruce Street
Business phone number Mobile 0409865530
Email address [email protected]
Postal address 180 Ann St
Suburb/locality Brisbane City
State QLD Postcode 4000
Licence class or registration
RPEQ
type (if applicable)
Building Regulation 2021 • Section 73 and 77 • Form 15 • Version 1 • September 2021 Page 2 of 4
Page 24
Licence or registration number
20336
(if applicable)
9. Signature of appointed competent person
This certificate must be signed by the individual assessed and appointed by the building certifier as competent to give design-
specification help.
Signature Date 16/02/2023
LOCAL GOVERNMENT USE ONLY
Date received Click or tap to enter a date. Reference number/s
Appendix – explanatory information
IMPORTANT NOTE: it is an offence for a competent person to give a building certifier a document, including this form, that the
person knows or reasonably suspects, is false or misleading.
Who can complete this certificate? (sections 10 of the Building Act 1975 (Building Act) and 73 of Building Regulation 2021
(BR 2021))
A building certifier can accept from a competent person (design – specifications) a certificate stating that the competent person
has assessed the building design or specification for the aspect of building work, and it will, if installed or carried out under the
certificate, comply with the building assessment provisions, including any relevant standards and codes.
Schedule 10 of the BR 2021 defines building design or specification as any material, system, method of building or other thing
related to the design of or specifications for building work.
For a competent person to meet the regulation requirements (section 77 of the BR 2021) they must substantially complete all
sections of this form, including information, such as the design of a particular material, system, method of building or that a
building element complies with the Building Code of Australia or a provision of the Queensland Development Code. It is also
important that the details of the relevant reference documents are included, for example, the applicable Australian Standards or
other technical provisions that may be applicable to the subject work.
What is the purpose of this form? (section 10 of the Building Act 1975)
The information in this form informs the building certifier’s decision making when they are assessing a building development
application and issuing the building development approval for the building work the subject of the certificate (form).
When is this form not required?
The assessment of some building applications will be entirely within the expertise of the relevant building certifier and therefore
they may not seek the help of a competent person. In these instances, this form is not required.
Is a manufacturer or supplier required under the BR 2021 to complete and sign this Form 15, if requested?
No. A manufacturer or supplier of building materials is not required to complete and give this form or any aspect and inspection
certificates if requested by a construction contractor, builder, appointed competent person, or a building certifier.
However, a manufacturer or supplier may give the construction contractor, builder, competent person or the building certifier
evidence of suitability such as a manufacturers statement for an aspect or material that it is compliant with the relevant
reference documents in the BCA i.e. the applicable Australian Standard/s.
What if there is not enough space for all the supporting material/documents?
Items 2, 3 and 4 requires the competent person to clearly identify the extent of the assessment that was undertaken for aspect/s
of work identified in this form.
For instance, there is provision for material such as specifications, standards, codes or other relevant publications to be
referenced in the form. However, if the space in the form is not sufficient to accommodate all of this material, you can create and
refer to additional material in an addendum or attachment to the form.
The form is also available in a Microsoft Word version, that you can download and edit to include additional material in the
relevant parts of the form. Note: that editing the form in the Microsoft Word version may cause the relevant boxes to expand and
Building Regulation 2021 • Section 73 and 77 • Form 15 • Version 1 • September 2021 Page 3 of 4
Page 25
increase the length of the document. This is acceptable and does not change the approved form, provided the section text (description on the left-hand side of the page) is not altered. Appointed competent person (design or specification) – (sections 34 and 36 of the BR 2021) A building certifier must assess and decide to appoint an individual as a competent person before they can, as a competent person, give design-specification help. The building certifier is required to keep detailed records about what was considered when appointing a competent person. A building certifier must be satisfied that an individual is competent to give the type of inspection help having regard to the individual’s experience, qualifications and skills and if required by law to hold a licence or registration, that the individual is appropriately registered or licensed. An individual is appointed as competent to give design-specification help on or from a particular day. The building certifier can also decide an individual is a competent person (design-specification) and a competent person (inspection) at the same time or for the same systems or components of the work. For further information about assessment of someone as a competent person refer to the Guideline for the assessment of competent persons. PRIVACY NOTICE The Department of Energy and Public Works is collecting personal information as required under the Building Act 1975. This information may be stored by the Department, and will be used for administration, compliance, statistical research and evaluation of building laws. Your personal information will be disclosed to other government agencies, local government authorities and third parties for purposes relating to administering and monitoring compliance with the Building Act 1975. Personal information will otherwise only be disclosed to third parties with your consent or unless authorised or required by law. Building Regulation 2021 • Section 73 and 77 • Form 15 • Version 1 • September 2021 Page 4 of 4