45 13:46 8755329147

25 January 2005 Maritime Safety

4 ICM PAGE 02/83
0755329147

Queensland
Government

 

Queensland

International Cosstal Management
11 Greer Terrace Queensland Transport
Southport Qld 4215

Att:

Bobbie Corhett

Dear Bobbie

Tidal Works Application
Dredging Permit ~ Noosa River & Canal Nourishment

‘Thank-you for your letter of 19 January 2005 about your request under the Coastal Protectionand
Management Act 1995 for a dredging proposal for the locations mentioned ahove.,

As a concurrence agency, Maritime Safety Queensland has no objection to the proposal provided the
following navigation and marinc safety conditions are addressed.

1:

The dredging operation inust be carried out in the areas described on International Coastal
Management, drawing number NRN-01,02,02-1,62-2,02-3,03,04,05 and 06 attached to your
letter of 19 January 2005.

2. The permit holder shall@yisure that the dredging operation is confined to within the boundaries of
the authorised operating area, Dredging operations must be conducted by means of suitable
dredge plant and equipment as prescribed in the drawings mentioned above.

3. The permit holder shall conduct surveys of the authorised operating area(s) one-month before the
expiry of termination of the dredging permits. Plans of the surveys shall be sent to the Harbour
Master, within one month of the completion of each survey.

4a. In the Weyba Creek Canals - No dredging material shall be removed by the dredger trom the bed
or foreshores within a distance of 1 2m, below the low water mark. This distance must be
measured from the vertical property boundary retaining wall.

4b. In the Noosa River — No dredging material shall be removed by the dredger from the bed or
foreshores within a distance of 18m. This distance niust be measured from the landslide
deposition boundary as depicted on Drawings NRN 02-1, 02-2, 02-3.

5. No dredging material shall be removed by the dredger from the bed below RL-2.5m ABD.

Maritime Safety Queenaland Ourref 710/82 (1) P24492 F4

Brisbane Region Your ref

MacArthur Avenue East Enquiries Pater Marchbank

Pinkenba Queensland 4008 Telephone +61 7 3860 3556

ABN 13 200 330 520 Facsimile +617 3860 3574

Website www.transport.qld.gov.au/maritime

GAMarltime\Marlope\MOFFIC! E\SECT-8m2Slemnoosariver.dac
Log in to download the original file

11. Existing DA (2006).pdf · 3.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.