85 13:46 8755329147 4 Ic PAGE 03/83

0755329147

6 Dredging operations must be condneted in a manner that ensures a suitable navigation channel is
Open to vessel traffic at all times,

7. Where the dredge causes damage to any navigatiozal aid due to the operation, the permit holder
shall repair or replace the navigational aid to the satisfaction of the Harbou? Master,

8. The permit holder shall not remove any material within a horizontal distance of 40 m from any
aid to navigation, including any ground tackle attached to the aid.

9. Dredging operations shal] be carrj éd out without Causing interference to other dredge operators
within the vicinity of works.

10. All floating dredge plant and equipment used by the permit holder for purposes of this permit
shall conform to the Jransport Operations (Marine Safety) Act 1994. All floatin ¥ Pipeline shall
be appropriately lit and/or marked to the satisfaction of the Harbour Master,

11. All vessels and/or floating plant engaged in the dredging operation must obtain or hold a valid
Certificate of Survey or a valid permit issued by Maritime Safety Queensland pursuant to the
Transport Operations (Marine Safety) Act 1994.

12. If any ohsfruotions are encountered during dredging operations, the permit holder shall at his cost
and expense remove and dispose of them as directed by the Harbour Master,

13. ‘Lhe permit holder must give the Harbour Master two weeks notice, before commencing or
ceasing dredging operations. This information is required for the issuing of a Notice to Mariners,

14, The permit holder must  gomply with all written instructions issned by the Harbour Master.
15. ‘This permit may be suspended or cancelled at the discretion of the Harbour Master.

Dredging must be completed within two years from the date of the approval, Lf dredging is not
completed, you will nced additional or amonded comments from: the Regional Harbour Master,

Maritime Safety Queensland does not need to be further consulted if all of the above conditions are
met,

The above conditions must be included in your application to the assessment manager.

A copy of this letter has been forwarded to the Environmental Protection Agericy

«

Yours sincerely

 

Marltime Safety Queensiand / Page 2of2
Log in to download the original file

11. Existing DA (2006).pdf · 3.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.