REFERENCED DOCUMENTS Stormwater MCU13/0098
Dive & STREET ADDRESS: 42 HOFFMAN DRIVE NOOSAVILLE REAL PROPERTY DESCRIPTION: LOT 3 CANCELLING PART CLIENT NAME: MARKRIS FOODS INTEGRATED WATER CYCLE MANAGEMENT NOTES: LOT 2 SP 1. STORMWATER QUANTITY: 2. STORMWATER QUALITY: 3. FLOOD MANAGEMENT: 4. DEMAND REDUCTION: refer: "deemed to comply solutions — stormwater quality management south east queensland’ version 1.0, may 2010 by "healthy waterways’ ON SITE RETENTION TANK DEEMED TO COMPLY SOLUTION Cl1 REFER MINIMUM FLOOR LEVELS ROOF WATER HARVESTING AND ASTAR WELS RATED FIXTURES 222982 ADJACENT INDUSTRIAL ESTATE NOTE: DEPENDING ON GROUND CONDITIONS AND IF REACTIVE SOIL IS FOUND ALL PENETRATIONS, VERTICAL AND HORIZONTAL SHALL BE PROVIDED WITH SWIVEL JOINTS AND EXPANSION JOINTS. ALL SUBSURFACE DRAINS REQUIRE EXPANSION JOINTS AT 10m SPACING. DRAWING SCHEDULE INTEGRATED WATER CYCKLE MANAGEMENT PLAN Site 3266 m? Roof 1800__m? Driveway 944 =m? Landscape 522 m? New impervious 2744 m? 2783-1 COVER SHEET 2783-2 STORMWATER DRAINAGE AND QUANTITY 2783-3 STORMWATER QUALITY DETAILS 2783-4 STORMWATER QUALITY MAINTENANCE CATCHMENT AREAS Bartlett St LOCALITY MAP ~~~ LAWFUL POINT OF DISCHARGE FOR DETAILS REFER TO DRAWINGS PROVIDED BY MORGAN CONSULTING ENGINEERS. \. PROPOSED NEW WAREHOUSE BUILDING LOT 3 INTERNAL ACCESS ROAD (ROW) ———a95-- Soe ] SITE ACCESS 2 ACCESS SCALE: NTS R EN €& S T R E& ET SITE PLAN & EXISITNG SERVICES DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED FOR ASSESSMENT, TENDERING AND CONSTRUCTION. LEGEND GENERAL NOTES WATER SUPPLY Amd Description Date a Rin Water 3 Diameter 1. DO NOT SCALE FROM THESE DRAWINGS. 1. PIPEWORK SHALL BE IN ACCORDANCE WITH AS4020, FOR EXAMPLE: ABS (ACRYLONITRITE STYTRENE), PP (POLY PROPYLENE), PE ae 2, DO NOT RELY ON THESE DRAWINGS FOR ALIGNMENT AND LEVELS OF EXISTING INFRASTRUCTURE. (POLYETHYLENE) OR COPPER U.N.O. Existi Wat 0.8, Cl it ti rf s Existing Sewer C Gapped junction 3. ITIS THE OBLIGATION OF THE CONTRACTOR AND/OR PLUMBING CONTRACTOR TO SURVEY ALL EXISTING SERVICES PRIOR TO 2. WATER SUPPLY PIPEWORK SHALL BE @20 U.N.O. EXCEPTION: ONE FITTING ONLY MAY BE @15. MAX. LENGTH 3000 MM. HOT WATER PIPEWORK Existing Storm water cv Conrol valve CONSTRUCTION. SHALL BE LAGGED. HOT WATER RECIRCULATING LINES TO BE INSULATED WITH 20MM "ARMAFLEX" OR SIMILAR. HD Existing House drain cs Cleaners sink 4. THE PLUMBING CONTRACTOR IS OBLIGED TO OBTAIN REAL SIZE PRINT OUTS (A1 U.N.O.) FOR THE PREPERATION OF TENDER. ANY 3. PROVIDE TEMPERING VALVES ON HOT WATER TO PERSONAL HYGIENE FIXTURES. Sanitary Drainage Swe Bot eter panel CLAIMS REFERED TO AS "DRAWING COPIES" NOT READABLE SHALL BE REFUSED. 4. UNDERGROUND COPPER PIPEWORK SHALL BE "KEMLAGGED" OR OTHERWISE PROTECTED. UNDERGROUND PIPEWORK NOT UNDER —sw— Grey Water oN Bec creek acne 5. ALL KITCHEN, LAUNDRY & BATHROOM FITTINGS AND TOILETS SHALL COMPLY WITH THE MINIMUM WELS WATER RATING LEVEL 4 CONCRETE SLAB MAY BE POLYPIPE CLASS PN20. ONE SIZE LARGER THAN SHOWN. TTT tent fee Een Eccentric Enlarger STAR (FORMER AAAA WATER CONSERVATION RATING AS PER AS/NZ6400). 5. EXPOSED PIPEWORK IN AMENITIES AREAS, SHALL BE CHROME PLATED. aT FOS yeater Elev Dge Evevated Drainage 6. PROVIDE FLOW RESTRICTOR VALVES TO TAPS AND SHOWER ROSES WHERE REQUIRED. 6. SUBMETERS SHALL COMPLY WITH APPROVED DEVICES. REFER LOCAL AUTHORITY REGULATIONS. SUBMETERS SHALL BE LOCATED IN ——— — Storm Water Drainage Fe False. ceiling 7. THE FLOW SHALL NOT EXCEED A MAXIMUM OF 9L/MIN. COMMON AREAS ONLY. voles Eire FH Fire Hydrant 8. WATER SUPPLY AND SANITARY DRAINAGE HAS BEEN DESIGNED AND SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE Q'LD aot Agi Drain FHR Fire hose reel STANDARD SEWERAGE LAW, Q'LD STANDARD WATER SUPPLY LAW, THE NATIONAL PLUMBING, DRAINAGE CODE AS 3500, THE meus Noles Dale FFL Finished floor level Q'LAND DEVELOPMENT CODE QDC, THE FIRE HYDRANT CODE AS2419, ALL RELEVANT AUSTRALIAN STANDARDS, AND THE BACKFLOW PREVENTION x 1107213 ()— © Rain Water Ri ar Cee Hs eptor t REQUIREMENTS OF THE LOCAL AUTHORITY. 1. PROVIDE HOSE CONNECTION VACUUM BREAKERS TO ALL HOSE COCKS PROVIDE RPZD TO ANY IRRIGATION CONNECTIONS, For Development Approval -07- ain Water Riser GP Gully pt 9. THESE DRAWINGS ARE DIAGRAMMATIC ONLY AND SHALL BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECTURAL AND/OR HAZARD ZONES. For Building Approval Cs) Cold Water Riser GMH Gully Man Hole DRAWINGS, OTHER CONSULTANTS DRAWINGS, SPECIFICATIONS AND OTHER WRITTEN INSTRUCTIONS THAT MAY BE ISSUED 2. PROVIDE APPROVED BACK FLOW PREVENTION TO FIRE SERVICES, HYDRANT SUPPLY (TESTABLE SINGLE CHECK VALVE U.N.O.), For Tender @)— Down Pipe gv Gate valve DURING THE COURSE OF THE CONTRACT. ANY DISCREPANCIES SHALL BE REFERRED TO THE SUPERVISING OFFICER FOR ALL FIRE HOSE REELS WHICH MAY BE USED FOR OTHER THAN FIRE FIGHTING SHALL BE EQUIPPED WITH DOUBLE CHECK VALVES For Construction =~ Stack HW Hot water tion branch DECISION BEFORE PROCEEDING WITH THE WORK. CONTRACTOR'S SHALL VERIFY ALL FIXTURE LOCATIONS, INVERT LEVELS, (DCV) U.N.O. hs Constructed @)- Vent Pipe HD House drain SURFACE LEVELS, AND COVER TO PIPES ARE CORRECT AND OBTAINABLE PRIOR TO COMMENCEMENT OF THE WORK. THE EXACT @) 3 HL High level LOCATION OF EXISTING, AND PROPOSED SERVICES, SHALL BE VERIFIED WITH THE RELEVANT AUTHORITY, OR OTHER TRADES AS &) Group Vent IC Inspection Chamber APPLICABLE. FIRE STOP COLLARS TO BE USED ON ALL PLASTIC PIPEWORK PENETRATING FIRE RESISTANT CONSTRUCTION. COVERS RANE S or TO VEHICULAR TRAFFIC TO BE 0535 CAST IRON. MEDIUM DUTY UNO ®) ° Educt Vent IL Invert Level ~ . No. y= Induct Vent io Inspection opening 2. COVERS IN GRASSED OR CONC. AREAS TO BE 535 CAST IRON, CONCRETE INFILL LIGHT DUTY. . ios Inspection Opening to Surface SANITARY DRAINAGE 3. COVERS IN PAVED AREAS TO BE 600 SQ. INFILL TO MATCH PAVING PATTERN. 1 ® (8) Hot Water Riser Kec ore Channel 1. UNDERGROUND PIPEWORK SHALL BE @100 PVC DWV, AND UPVC WHERE EXPOSED, MIN GRADE 1:60 U.N.O. 4. COVERS IN TILED AREAS TO BE AS FOR PAVED AREAS WITH BRASS EDGING. Hyd raulic i ~~ ° Fire Dropper 2. SUSPENDED PIPEWORK SHALL BE PVC CLASS DWV. 5. CONCRETE INFILL COVERS TO BE STAMPED "SWD" OR "SEW" AS APPROPRIATE NRV N t I : . (8) o Fire Riser PB Both box. 3. TRADE WASTE PIPEWORK TO GREASE TRAP SUSPENDED SHALL BE "COESPRENE" OR HDPE. PLV Pressure i 4. UNDERGROUND SHALL BE VITREOUS CLAY OR HDPE. : : TACT: MIEAust RPEQ No 7023 Vv Velve PO Planter outiet 5. TRADE WASTE PIPEWORK TO OIL SEPARATOR SHALL BE HDPE, OR VITREOUS CLAY WITH'NITRILE” RUBBER RINGS. GRATINGS . . contact: Reinhold Koenning Michus ° = he Hose Cock Ree Real propery Sen 6. CLEANOUTS OR INSPECTION OPENINGS BROUGHT TO SURFACE IN PAVED OR CONCRETE AREAS, OR WITHIN BUILDINGS TO HAVE 1. Se OS SG CONOTNON ER TO BE "FASTON, GATIC" OR APPROVED EQUAL DUTY TO MATCH MANUFACTURERS RECOMMENDATIONS Moffat Beach, QLD, 4551 j BRASS CAPS, SEALED AND SCREWED. : email: [email protected] — een Eccentric Enlarger RWO. Rein water outlet Zone device 2. TRENCH GRATE TO BE TRANSVERSE BAR. PH: (07) 5491 4333 FX: (07) 5491 4233 RWH Rain water head 3. FLOOR WASTE GRATES TO BE CHROME PLATED BRASS : ---cr-- en Enlarger . . CLIENT : SD Sanitary Drainage STORMWATER DRAINAGE OQ / et Suton ‘evel 1. UNDERGROUND PIPEWORK SHALL BE 2100 PVC CLASS SW MIN GRADE 1:100 U.N.O. MARKRIS FOODS ORG Overflow Relief Gully sit Safe Tray 2. DOWNPIPES SHALL BE @100 PVC CLASS SW, U.N.O ON HYDRAULIC PLANS. FIRE SERVICE le wo Water SWD Storm water drain 3. RAINWATER OUTLETS (RWO) AND PLANTER OUTLETS (PO) SHALL BE "GATIC WADE" OR SIMILAR, WITH MEMBRANE CLAMPS WHERE 5 wr HYDRANT PIPEWORKC 19 Be DENTIMEDIN ACCORDANCE With ast ade 6.8. ARCHITECT : t/td TI d Tundish REQUIRED. . , Closet yi Test gate snes 4. GULLY PITS SHALL BE CONCRETE BODY IN TRAFFICABLE AREAS AND POLY IN NON TRAFFICABLE AREAS U.N.O. 3. ALL HYDRANTS AND FIRE HOSE REELS SHALL HAVE A MINIMUM CLEARANCE (IN ALL DIRECTIONS) OF 100MM AROUND THE HANDWHEEL. XM SOUL SPACE J Foo} sk Sink td Tundish 5. POLLUTION CONTROL MANAGEMENT PLAN (PCMP): 4. ALL HYDRANTS TO BE FITTED WITH THE VALVE OUTLET AT RIGHT ANGLES TO THE FACE OR WALL BEHIND IT. THE VAVLE OUTLET IS TO BE /provect: 42 HOFFMAN DRIVE \ TG(t) Trench grate transverse bar HORIZONTAL OR SLOPING AT A MAXIMUM OF 35 DEGREES BELOW HORIZONTAL. 5.1. TO BE RESPONSIBILITY OF BODY CORPORATE. NOOSAVILLE (FT Laundry Tub Tet) Trench grate longitudinal bar EXTERNAL FEED HYDRANTS SHALL BE POSITIONED WITHIN 20M OF A ROAD, HARDSTAND OR THE LIKE TO WHICH THE FIRE AUTHORITY PUMP y T.M.V. Thermostatic mixing valve 5.2. TO LIST ALL IN FLOW FILTERING DEVICES LIKE LEAF EATERS AT DP'S AND OTHER FILTERS. 5. , INDUSTRIAL DEVELOPMENT g ol wm — Washing V Tempering valve 5.3. TO KEEP AND MAINTAIN A LOG OF CLEANING. APPLIANCE HAS ACCESS. Machine u/g Underground 5.4. TO CLEAN DEVICES SUCH AS GUTTERS AND GULLY PITS: 6. EXTERNAL HYDRANTS SHALL BE POSITIONED NOT LESS THAN 10M FROM THE BUILDING UNLESS PROTECTED BY A CONSTRUCITON HAVING DRAWING TITLE: u/s Under slab AFIRE RESISTANCE LEVEL OF NOT LESS THAN 90/90/90 EXTENDING AT LEAST 2M EITHER SIDE OF THE HYDRANT OUTLET, AND WHICH EVER FWG Floor Waste Gull i 7 , 3 AS TO MANUFACTURES SPECIFICATION y U.n.o Unless noted otherwise IS THE LESSER, 3M FROM THE GROUND LEVEL ADJACENT TO THE HYDRANT OR THE HEIGHT OF THE BUILDING ws Water supply -MINIMUM QUARTERLY, BUT MONTHLY IN RAINY SEASON : : as Bn Basin “AFTER EACH MAJOR RAINFALL EVENT 7. FIRE AUTHORITY BOOSTER CONNECTIONS SHALL BE INSTALLED WITHIN 8M OF A ROAD, HARDSTAND OR THE LIKE TO WHICH THE FIRE 5.5. TO INSPECT AND CLEAN TANKS MINIMUM ONCE YEARLY. AUTHORITY PUMP APPLIANCE HAS ACCESS. Cc) Bth = Bath Shr Shower 5.6. TO INSTALL AND MAINTAIN PUMP AND FIXTURES FOR REUSE/WATERING/IRRIGATION AS TO MANUFACTURES SPECIFICATION 8. MATERIALS: <@100 CLASS 16 POLY / TYPE correr IN GROUND. COVER SHEET 5 OS mee ener “O10 FRGLTELG/ TYPE B COPPER SERS La «=O ME_— Water Meter CS Cleaners Sk 9. DO NOT USE GALVANISED FOR UNDERGROUND PIPE WORK. Design Ae. Checked (Ch Date 11-07-13 Dwg, No. AMD, \ SCALE: 1: 400 oN At UNO. 1 Of 4 2783-1 J RPD:— LOT 3 / FMR LOT 2 SP 222982
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 3 pages
Page 2
ADJACENT INDUSTRIAL ESTATE
rFOR DETAILS OF ROOF DRAINAGE REFER TO HYDRAULIC CONSULTANTS DRAWINGS
COMBINED ———_.
HARVESTING/RETENTION \
TANK, TYPE ABOVE
GROUND.
TOTAL VOLUME
22,500LITRE
DISCHARGE MINIMUM OF
80% ROOF CATCHMENT
AREA TO TANK.
NS
\,
BIO RETENTION
SYSTEM FOR
ROOF CATCHMENT
MIN AREA 45sqm ~~
#300 SHOWN BESIDE——_]
BRS FOR CLARITY
ONLY
BRS 3/1
300~\
IL3.510~
NI
PROPOSED NEW WAREHOUSE BUILDING
LO
-& FFL5.400 |
N\ DRIVEWAY
CARPARKING
|
|
|
|
|
|
|
|
\
LOT 3 PROPERTY CONNECTION
$375; 5.9m @ 1%
USIL3.470
DSIL3.410
CARPARI
225
1L3.510
——EXISTING
STORMWATER
MANHOLE 1/1:
SL4.870
IL3.555
-) FFLS.400
| FFLS.400
[email protected]
FFLS.200
3x MOTORBIKE
IL3.750-
BIO RETENTION BIO RETENTION
L3.600 SYSTEM FOR SOUTH SYSTEM FOR
CARPARK NORTH CARPARK
CATCHMENT. CATCHMENT.
MIN AREA 11sqm MIN AREA 15sqm
INTERNAL ACCESS ROAD (ROW)
/
/ SITE ACCESS
/
SITE ACCESS
S To FR FF FT
FLOW (LITRES/SEC.)
60
——— NO RETENTION
50:
S WITH RETENTION
40 S
30. Zz
7 ™~
20 ==
° Ce = ~
0 ! T I
2 4 6 8 10 12 14 16 18
TIME (MINS.)
STORMWATER HYDROGRAPH THROUGH TANK
PEAK FLOW MITIGATION THROUGH ON SITE RETENTION TANK
TOTAL PROPOSED TANK VOLUMES:
TANK FOR HARVESTING: 10,500 LITRE
TANK FOR RETENTION: 12,000 LITRE
RUNOFF & DETENTION CALCULATIONS:
MAXIMUM EVENT: Q100
TIME OF CONCENTRATION: Smin
INTENSITY: 326mm/hr
SITE AREA: 3266sqm
IMPERVIOUS AREA: 2744sqm
PRE DEVELOPMENT PEAK RUNOFF: 260L/s
PEAK RUNOFF POST DEVELOPMENT: 290L/s (NO RETENTION)
RETENTION VOLUME REQUIRED: 11,900 LITRE
RETENTION VOLUME PROVIDED: 12,000 LITRE
REDUCTION REQUIRED: 29.8L/s
REDUCTION PROVIDED: 33.9L/s
FROM ROOF
HI-FLOW #300
E
Lt
9
COMBINED 4
HARVESTING/MITIGATION wo
TANK a
TOTAL VOLUME:
22,500 LITRE
50% HARVESTING
Or eae ON KE 90 LO-FLOW SLOW
GS LEAK TO BIO
uw RETENTION SYSTEM
0
oO
I 1 GROUND
KAN AN AN ANA NAN AN ANAS ANIA A WAN
oO
RAINWATER HARVESTING AND
MITIGATION TANK ASSEMBLEY
TO LAWFUL POINT OF DISCHARGE
SCALE: NTS
DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED
FOR ASSESSMENT, TENDERING AND CONSTRUCTION.
[Amd Description Date
Issue Notes Date
For Development Approval X 11-07-13
For Building Approval
For Tender
For Construction
As Constructed
E Hydraulic 3
contact: Reinhold Koenning MiEAust RPEQ No 7023
PO Box 181
Moffat Beach, QLD, 4551
email: [email protected]
PH: (07) 5491 4333 FX: (07) 5491 4233
CLIENT :
MARKRIS FOODS
ARCHITECT :
L SOUL SPACE J
(PRosect: 42 HOFFMAN DRIVE NY
NOOSAVILLE
INDUSTRIAL DEVELOPMENT
DRAWING TITLE:
STORMWATER
DRAINAGE
AND QUANTITY
Design Ae. Checked (Ch Date 11-07-13 Dwg, No. AMD,
\ SCALE : 1: 200 2783-2 SJ
RPD:-— LOT 3 / FMR LOT 2 SP 222982
ON A1 UNO. 2 Of 4
Page 3
N SITE, ABOVE GROUND COMBINED
HARVESTING/RETENTION TANK WITH TOTAL
VOLUME OF 22,500 LITRES. _
12,000 LITRE FOR RETENTION S00 Hl FLOW Brrass
2000 10,500 LITRE FOR HARVESTING LOCATED UNDER. B10
, RETENTION SYSTEM AND
#300 HI-FLOW BYPASS BRS (NOT CONNECTED TO SYSTEM x
SHOWN FOR CLARITY) BYPASS CHAMBER AT a
#90 LO-FLOW CHARGE ON TOP OF BRS INVERT. a
90 LOW-FLOW MITIGATION S 00sq OVERFLOW AND HIGH
DRAIN DISCHARGE TO TOP 5 FLOW BYPASS CHAMBER,
tet ON SITE, ABOVE GROUND COMBINED —~ | 12,000 LITRE Osine ADEROVED FLAP # See ES AND TINGED
HARVESTING/RETENTION TANK WITH TOTAL RETENTION VOLUME VALVE. CHARGE ON TOP OF ° ELEVATED GRATE.
VOLUME OF 22,500 LITRES. | —~e a
GRAVEL MATTRESS FOR 9
12,000 LITRE FOR RETENTION SCOUR PROTECTION. Ww
10,500 LITRE FOR HARVESTING Zz
%300 HI-FLOW BYPASS BRS E
9 —FLOW CHARGE ON TOP OF BR 10,500 LITRE as
90 LO-FLOW CHARGE ON TOP OF BRS HARVESTING VOLUME S
wo
TYPICAL: 5.250N 5.300
%100 SLOTTED PVC WITH ee 5.000 y coc}
CLEANOUT TO SURFACE fl :
USING SCREW CAP.
4.400 4.300
_ | c ~S 4.100
600 FILTRATION LAYER: —~
3.700
100 TRANSITION LAYER.
200 DRAINAGE LAYER
#300 TO LAWFUL POINT OF
DISCHARGE
BIO RETENTION SYSTEM BRS 3/1
LONG SECTION
SECTION (Aa
SCALE 1: 20\ 1 _/
BIO_RETENTION SYSTEM _A_NOTES
CATCHMENT: ROOF 1800m?
¢ FILTER MEDIUM AREA: 45m?
* FORE BAY AREA: 1.5m?
* PROVIDE 100 SUBSOIL DRAINAGE WITH
CLEAN OUT POINTS AS INDICATED ON
PLAN.
xr
&
a
ir
a
Zz
a (2 2
Ne é
it)
E
lu
a
a
ir)
a
Zz
Ld
2 5
Oo
Oo
Q 0 5.300
N
ILTER MEDIUM SURFACE AREA WITH DENSE THE ENTIRE BRS TO BE. ——""
PLANTING. FOR DETAILS OF SELECTED PLANTS SUCH WRAPPED IN CEO TEXTILE
AS GRASSES, SHRUBS AND SELECTED TREES REFER
TO LANDSCAPE ARCHITECTS PLANS. 600 FILTRATION LAYER:
ee. D SL3.500 4.100 DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED
. 100 TRANSITION LAYER —_—_ = FOR ASSESSMENT, TENDERING AND CONSTRUCTION.
200 DRAINAGE LAYER CQ aS [Amd Description Date
#300 TO saawsrer/eyenss-
CHAMBER
BIO RETENTION SYSTEM BRS 3/1
CROSS SECTION
250 WIDE BATTER SURROUNDING BIO RETENTION SYSTEM.
ee BATTER SHALL BE PROVIDED WITH ROCKS AND DENSE SECTION (8
e PLANTING. FOR SELECTION OF PLANTS SUCH AS A
MIXTURE OF GRASS, SHRUBS AND SELECTED TREES REFER SCALE 1: 20
TO LANDSCAPE ARCHITECTS PLANS. :
Issue Notes Date
For Development Approval X 11-07-13
For Building Approval
NOTE: For Tender
: For Construction
IDENTICAL CONSTRUCTION PRINCIPLES As Constructed
E Hydraulic 3
I
contact: Reinhold Koenning MiEAust RPEQ No 7023
PO Box 181
Moffat Beach, QLD, 4551
email: [email protected]
PH: (07) 5491 4333 FX: (07) 5491 4233
CLIENT
00sq HI-FLOW BYPASS AND MARKRIS FOODS
TRANSFER CHAMBER, CONCRETE WITH
ELEVATED GRATE AND WEIR AT ARCHITECT :
SLS.250 SOUL SPACE
yy J
(PRovect: 42 HOFFMAN DRIVE Y
NOOSAVILLE
INDUSTRIAL DEVELOPMENT
DRAWING TITLE:
300 SYSTEM OUTFLOW
DIRECTED TO LAWFUL STORMWATER
POINT OF DISCHARGE
QUALITY
DETAILS
Design Ae. Checked (Ch Date 11-07-13 Dwg, No. AMD,
SCALE: 1 : 50 ON At UNO. 3 Of 4 2783-3
BIO RETENTION SYSTEM BRS 3/1 BIO RETENTION SYSTEM BRS 3/1 w A
SUBDRAINAGE_LAYOUT PLAN VIEW RPD:— LOT 3 / FMR LOT 2 SP 222982
Page 4
RECOMMENDATIONS FOR ESTABLISHMENT & OPERATION:
PHASE OF ESTABLISHMENT:
The first 2 Years after construction are crucial for the performance of the VBFS.
“Ensure the right plant selection (refer "Healthy Waterways" for plant selection)
*“*During dry periods provide sufficient watering
“Perform regular weed removal
****Replace not established plants where required
OPERATIONAL PHASE:
e Perform routine inspections of the raingarden (VBFS) to identify any areas of obvious increased sediment deposition, scouring from
storm flows,
| erosion of the batters from lateral inflows and clogging
Perform routine inspections of the inflow systems in particular the grated drain and clean the grated drain regular from debris and litter
Perform routine inspections of the surface of the raingarden and clean from litter and gross pollutants
Remove sediment build ups in the raingarden
Repair any damage from vehicle traffic
Provide regular irrigation/watering during extended dry periods
Remove any invasive weeds at any time
Remove plants that have died and replace them
Perform regular pruning as to Landscape Architects schedule to encourage growth and healthy establishment of plants
Perform vegetation pest minotoring and control as to Landscape Architects schedule
RECOMMENDATION:
THE RAINGARDEN IS PROPOSED TO BE A STORMWATER TREATMENT DEVICE AS OPPOSED TO A NORMAL GARDEN
BED. WE RECOMMEND TO SET UP A SIGN EXPLAINING THE PURPOSE OF THE RAINGARDEN.
WIDTH AS SPECIFIED IN PLAN
VEGETATED BIO RETENTION SYSTEM LENGTH AS SPECIFIED IN PLAN
Use for mulching: LUCERN, WOODCHIP OR EQUIVALENT.
WIDTH AS SPECIFIED IN PLAN
LAYER: il
Clay 2-4% (<0.002mm) im
Silt 4-8% (0.002-0.05mm) |[||
Very Fine Sand 5-10%(0.05-0.15mm) U
f
Fine Sand 10-25% (0.15-0.25mm)
Med./Coarse Sand 60-70% (0.25-1.0mm)
Coarse Sand 7-10%(1.0-2.0mm)
TRANSITION LAYER:
Coarse Sand__ 100% __0.5-2mm
DRAINAGE LAYER:
O CO Fine Gravel 100% 2-5 mm
Provide PVC perforated pipe with
diameter as specified in plan.
Minimum 2 off.
SPECIFICATIONS
Roof water @
NOTES:
1, Use LUCERN OR EQUIVALENT for mulching
2. Do not use organic Soils or soil fractions
for filter layer.
3. Provide a suitable irragation system required
for the establishment of the plants and for
use in extended dry periods. Irragation
system shall be supplied from the
harvesting tanks.
4. Do not use any geotextile or related
products between filter and transition or
between transition and drainage layers.
5. Geotextiles may be used in addition to the
impermeable concrete & block surrounds.
6. Provide flush out points for subsurface
drainage.
Connect subsoil
drainage to stormwater
infrastructure as
specified in plan.
VEGETATED BIO FILTER STRIP SOIL SPECIFICATION
(NOT TO SCALE)
NOTES:
1. Provide selected plants as to specification of
"Healthy Waterways” http://www.healthywaterways.org/
2. Provide "FOREBAY’ made of rocks and pebbles. For
scour protection. Refer detailed design for area.
MAINTENANCE PLAN
WATER SENSITIVE URBAN DESIGN TECHNICAL DESIGN GUIDELINES FOR SOUTH EAST
QUEENSLAND (Chapter 5, Item 5.6).
The maintenance of the bioretention basin elements involve:
e — Routine inspection of the bioretention basin profile to identify any areas of obvious increased sediment
deposition, scouring from storm flows, rill erosion of the batters from lateral inflows, damage to the profile
from vehicles and clogging of the bioretention basin (evident of "boggy
ilter media surface).
e — Routine inspection of inflows systems, overflow pits and under-drains to identify and clean any areas of
scour, litter build
up and blockages.
appropriate fill (to match onsite soils) and revegetating.
the plant schedule.
e Vegetation pest monitoring and control.
Refer "Water by design" by HEALTHY WATERWAYS.
Removal of sediment where it is smothering the bioretention basin vegetation.
e Where a sediment forebay is adopted, removal of accumulated sediment.
Repairing any damage to the profile resulting from scour, rill erosions or vehicle damage by replacement of
Pruning to remove dead or diseased vegetation material and to stimulate growth.
HARVESTING
&
RETENTION
650m?
389m? 5
DRIVEWAY
562m? 5
DRIVEWAY
—
—
Tilling of the bioretention basin surface, or removal of the surface layer, if there is evidence of clogging.
Regular watering/irrigation of vegetation until plants are established and actively growing.
Removal and management of invasive weeds (herbicides should not be used).
Removal of plants that have died and replacement with plants of equivilant size and species as detailed in
BIO RETENTION
SYSTEM BRS3/1
yd
ZRUUtt
BIO RETENTIO
SYSTEM BRS.3/2
~
~
—
N
BIO RETENTIO
TREATMENT TRAIN
SYSTEM BRS 3/3 RECEIVING WATERWAYS
from carpark
to raingarden
A raingarden is a garden bed which
500
~_<_
uses native plants and free drainage
15
soils to treat the pollutants formed in
stormwater that runs off the driveway
and carpark. Raingardens help to
protect our waterways.
50
to
creek ,
Ww
BIORETENTION FILTER & RAINGARDEN MAINTENANCE CHECKLIST
BODY . .
CORPORATE NAME: DATE:
RESPONSIBILITY CENTRE ; ;
MANAGEMENT NAME: DATE:
OWNER NAME: DATE:
PROVIDE NAME AND DETAILS OF
MONTHLY CONSULTANT IF APPOINTED:
INSPECTION QUARTER
FREQUENCY 6—MONTHLY
DROUGHT
AFTER EVENT
INSPECTION ITEMS Yes _|No ACTION REQUIRED
Overall appearance healthy?
Over:
appearance clean?
Gross litter _on surface?
Sediment accumulation at inlet?
Sediment accumulation on pebble surface?
Sediment accumulation at pipe outlets?
Sediment accumulation in bypass chamber?
Erosion at forebay?
Erosion at overflow?
Any other erosion?
Damage of support structure?
Any other traffic damage present?
Damage to grates and lids?
Visual plant health ok?
Weeds apparent? Weeding required?
Watering required?
Irrigation functional?
Replanting required?
Mowing/slashing/pruning required?
Surface clogging visible?
Excess ponding evident?
Flushing required?
Point of discharge inspected (pit/headwall/swale/creek)?
OTHER
OBSERVATIONS
SIGNATURE & DATE:
NOTE: A4 COPIES OF THE FORM CAN BE OBTAINED BY CONSTRUCTION HYDRAULIC
_1| © ©
TANK SPECIFICATION ' |
TANK SIZE: 10,000 LITRE --1-}--= | et _ ey
DESCRIPTION: PRECAST ff vkno | LEGEND
| 1 ]SOLENOID SWITCHOVER DEVICE
PUMP SPECIFICATION | FRAN VESTING TAO ABLE
MANUFACTURER: TBC ' 4 |REMOTE WATER LEVEL INDICATOR
MODEL: TBC | 5 |PRESSURE LIMITING VALVE, 500 kPA MAX.
° 1 6 |WATER METER
@ | | 7 |TEMPERING VALVE MAX 50°C
8 | FILTRATION DEVICE
SWITCHOVER DEVICE SPECIFICAITON Heater | | 2 RAINWATER PUMP
MODE TORER: TBE 8l{] Harvesting 9 | NC | NORMALLY CLOSED
. =|] | Zone | Vv | BALL VALVE
HWS & | | GV | GATE VALVE
NRV|NON—RETURN VALVE
RAINWATER FILTRATION SPECIFICATION RW ew vy Vv Vv DCV| DOUBLE CHECK VALVE
MANUFACTURER: TBC mark "RAIN WATER” NRV GV [sludge zone |
MODEL: TBC |
1
Stormwater RPB main»
HOT WATER SYSTEM SPECIFICATION System
MANUFACTURER: TBC
MODEL: TBC RAINWATER HARVESTING SCHEMATIC
800
|-——a |
DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED
FOR ASSESSMENT, TENDERING AND CONSTRUCTION.
Amd Description Date
Issue Notes Date
For Development Approval X 11-07-13
For Building Approval
For Tender
For Construction
As Constructed
E Hydraulic
contact: Reinhold Koenning MiEAust RPEQ No 7023
PO Box 181
Moffat Beach, QLD, 4551
email: [email protected]
PH: (07) 5491 4333 FX: (07) 5491 4233
CLIENT :
MARKRIS FOODS
ARCHITECT :
L SOUL SPACE J
(Prosect: 42 HOFFMAN DRIVE NY
NOOSAVILLE
INDUSTRIAL DEVELOPMENT
DRAWING TITLE:
STORMWATER
QUALITY
MAINTENANCE
Design Ae. Checked (Ch Date 11—O07—13 Dwg. No. AMD,
\Q scale: N/A onatuno. 40f 4 2783-4 J
RPD:-— LOT 3 / FMR LOT 2 SP 222982
Used in these records
REFERENCED DOCUMENTS Stormwater MCU13/0098Related documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.