REFERENCED DOCUMENTS Stormwater MCU13/0098
ADJACENT INDUSTRIAL ESTATE
rFOR DETAILS OF ROOF DRAINAGE REFER TO HYDRAULIC CONSULTANTS DRAWINGS
COMBINED ———_.
HARVESTING/RETENTION \
TANK, TYPE ABOVE
GROUND.
TOTAL VOLUME
22,500LITRE
DISCHARGE MINIMUM OF
80% ROOF CATCHMENT
AREA TO TANK.
NS
\,
BIO RETENTION
SYSTEM FOR
ROOF CATCHMENT
MIN AREA 45sqm ~~
#300 SHOWN BESIDE——_]
BRS FOR CLARITY
ONLY
BRS 3/1
300~\
IL3.510~
NI
PROPOSED NEW WAREHOUSE BUILDING
LO
-& FFL5.400 |
N\ DRIVEWAY
CARPARKING
|
|
|
|
|
|
|
|
\
LOT 3 PROPERTY CONNECTION
$375; 5.9m @ 1%
USIL3.470
DSIL3.410
CARPARI
225
1L3.510
——EXISTING
STORMWATER
MANHOLE 1/1:
SL4.870
IL3.555
-) FFLS.400
| FFLS.400
[email protected]
FFLS.200
3x MOTORBIKE
IL3.750-
BIO RETENTION BIO RETENTION
L3.600 SYSTEM FOR SOUTH SYSTEM FOR
CARPARK NORTH CARPARK
CATCHMENT. CATCHMENT.
MIN AREA 11sqm MIN AREA 15sqm
INTERNAL ACCESS ROAD (ROW)
/
/ SITE ACCESS
/
SITE ACCESS
S To FR FF FT
FLOW (LITRES/SEC.)
60
——— NO RETENTION
50:
S WITH RETENTION
40 S
30. Zz
7 ™~
20 ==
° Ce = ~
0 ! T I
2 4 6 8 10 12 14 16 18
TIME (MINS.)
STORMWATER HYDROGRAPH THROUGH TANK
PEAK FLOW MITIGATION THROUGH ON SITE RETENTION TANK
TOTAL PROPOSED TANK VOLUMES:
TANK FOR HARVESTING: 10,500 LITRE
TANK FOR RETENTION: 12,000 LITRE
RUNOFF & DETENTION CALCULATIONS:
MAXIMUM EVENT: Q100
TIME OF CONCENTRATION: Smin
INTENSITY: 326mm/hr
SITE AREA: 3266sqm
IMPERVIOUS AREA: 2744sqm
PRE DEVELOPMENT PEAK RUNOFF: 260L/s
PEAK RUNOFF POST DEVELOPMENT: 290L/s (NO RETENTION)
RETENTION VOLUME REQUIRED: 11,900 LITRE
RETENTION VOLUME PROVIDED: 12,000 LITRE
REDUCTION REQUIRED: 29.8L/s
REDUCTION PROVIDED: 33.9L/s
FROM ROOF
HI-FLOW #300
E
Lt
9
COMBINED 4
HARVESTING/MITIGATION wo
TANK a
TOTAL VOLUME:
22,500 LITRE
50% HARVESTING
Or eae ON KE 90 LO-FLOW SLOW
GS LEAK TO BIO
uw RETENTION SYSTEM
0
oO
I 1 GROUND
KAN AN AN ANA NAN AN ANAS ANIA A WAN
oO
RAINWATER HARVESTING AND
MITIGATION TANK ASSEMBLEY
TO LAWFUL POINT OF DISCHARGE
SCALE: NTS
DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED
FOR ASSESSMENT, TENDERING AND CONSTRUCTION.
[Amd Description Date
Issue Notes Date
For Development Approval X 11-07-13
For Building Approval
For Tender
For Construction
As Constructed
E Hydraulic 3
contact: Reinhold Koenning MiEAust RPEQ No 7023
PO Box 181
Moffat Beach, QLD, 4551
email: [email protected]
PH: (07) 5491 4333 FX: (07) 5491 4233
CLIENT :
MARKRIS FOODS
ARCHITECT :
L SOUL SPACE J
(PRosect: 42 HOFFMAN DRIVE NY
NOOSAVILLE
INDUSTRIAL DEVELOPMENT
DRAWING TITLE:
STORMWATER
DRAINAGE
AND QUANTITY
Design Ae. Checked (Ch Date 11-07-13 Dwg, No. AMD,
\ SCALE : 1: 200 2783-2 SJ
RPD:-— LOT 3 / FMR LOT 2 SP 222982
ON A1 UNO. 2 Of 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records