Town Water Supply
24. The site shall be connected to Council’s existing town water supply in Park Road and be
constructed in accordance with Council’s standards and requirements at no cost to Council.
25. Each water connection to the water reticulation system shall extend to the property boundary
and be metered.
Geotechnical Issues/Construction
26. The disposal of sand, soil or any materials created by the construction of the dwellings shall
be removed in accordance with the Construction Management Plan with trucks greater than 6
metres in length not permitted. Details of the method of this disposal of materials are to be
submitted to Council at the Building Application stage. Not more than one vehicle at a
particular time will be parked in Park Road for the removal of, or the delivery of, materials
associated with the site and no such vehicle shall remain overnight. No materials are
permitted to be stored within the road reserve.
27. A program of works is to be submitted with any application for any Development Permit for
Operational Works detailing the construction schedule and proposed environmental protection
measures, including a vegetation management plan, which addresses stabilisation of
disturbed areas. All plans submitted for any Development Permit for Operational Works shall
show the existing public services with and adjacent to the site including the existing sewer
main and its levels and zone of influence.
Prior to commencement of works, a suitably qualified Registered Professional Engineer
Queensland (RPEQ) shall certify the plans for operational works and the program of works.
Where the program of works is changed for any reason whatsoever, a copy of the revised
program shall be submitted to Council’s Works Inspector within seven (7) days.
28. A Traffic Management Plan for the Construction of the Dwelling addressing the access to the
site, the locating of equipment and any potential conflicts with local traffic shall be submitted
and approved by Council prior to Development Permit for Operational Works. It should be
noted that workers vehicles are to park in Allambi Rise, with no vehicles associated with the
construction of the dwelling permitted in Park Road.
29. Prior to the issue of a Development Permit for building works the builder shall submit written
acknowledgment that building works shall proceed in accordance with the 9 tonne load limit
applicable to Park Road, unless varied by Council.
30. At the completion of construction the consulting geotechnical engineer will certify that all works
were carried out in accordance with their recommendations and that the structures and the
site are stable.
Erosion and Sediment Control
31. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required to
be submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works.
General
32. Any damage caused to any public utility during the course of construction shall be repaired to
Council’s standards and at no cost to Council.
33. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
Page 5 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Change to an Existing Approval - 010.2001.00210331.004 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 71 KB (small file)
- File type
No other editions are linked here.