Decision Notice - Change to an Existing Approval - 010.2001.00210331.004 [As Published] · 132001.210331.4
2001/210331
34. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to or
from the site shall be covered to prevent materials including dust being windblown from the
vehicle.
35. Where the existing retaining wall along the Park Road frontage of the site is removed to create
the driveway crossover the retaining wall shall be remediated immediately following the
completion of the earthworks for the driveway. The height of any retaining wall constructed
within the zone of influence of the existing sewer main shall not exceed one (1) metre unless a
written approval is obtained from Council’s Infrastructures Delivery Unit. A Development
Permit for Operational Works shall be obtained for these frontage works.
Building
36. The Geotechnical report submitted as part of your application has been appraised and
approved subject to the following conditions:-
36.1. There is to be no uncontrolled discharge of water onto the slope;
36.2. Stripping of vegetation for construction purposes should be minimised. If vegetation is
destroyed it should be reinstated immediately after that stage of construction is
completed;
36.3. Additional load due to fill, construction equipment or stockpiled materials should not be
located on the dune slope;
36.4. The use of vibratory equipment of any kind is not permitted to be used, including
vibrating rollers, the use of vibrating installation techniques for sheet piling and other
construction vibrations caused by excavating, earthmoving or demolition machinery or
other similar construction techniques;
36.5. All construction works on site shall accord with the Building Construction Report
prepared by Whaleycg Consulting Group dated December 2002 and the Morrisson
Geotechnic reports dated 1/9/00, 25/5/01.
36.6. A condition survey is to be carried out of adjoining buildings, structures and services
prior to any demolition works or construction works taking place on site. If distress
already exists, a photographic survey shall be undertaken, the distress measured and a
plan to monitor changes to distress shall be implemented. A copy of this report is to be
submitted to Council within 5 business days of survey and prior to construction work
proceeding;
36.7. Copies of all inspection reports by engineers are to be submitted to Council within 5
business days of the inspection taking place;
36.8. A RPEQ is to be engaged by the client to oversee the piling works and copies of all
inspection reports are to be submitted to Council within 5 business days of the
inspection taking place;
36.9. The applicant’s Geotechnical engineer will be required to be on site for the whole of the
time during any excavation. The construction of the whole of the foundations is to be
supervised and directed on site by a consulting Geotechnical engineer. No work of any
such kind relating to the foundations shall be carried out if he is not on the site and
supervising and directing this work. Such works shall only be carried out during dry
weather conditions and if there is a risk of sand movement occurring, all work shall be
suspended until such steps, approved by the applicant’s Geotechnical engineer and the
Council’s Building Surveyor, have been taken to ensure that no further slippage will
result.
36.10.The builder, landscaper and all workers associated with construction of the works shall
at all times comply with the directions of the consulting geotechnical engineer.
Page 6 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Change to an Existing Approval - 010.2001.00210331.004 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 71 KB (small file)
- File type
No other editions are linked here.