Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

Appendix C - Traffic + Carparking - 6-10 Diamond Street Cooroy - 21.12.18

Attached to the e-mail Commercial Business Type 1 Office, Retail Business Type 2 Shop & Salon & Multiple Housing Type 4 Conventional - 4 units (Traffic & Car Parking Report) - MCU19/0001.

of 68

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

7          Conclusions
Following the assessment and analyses presented in this report, it is concluded that:
         The car parking requirement for the development is 44 car parking spaces.
         The proposed parking supply of 44 car plus 4 motorcycle parking spaces meets the site’s parking
          requirement.
         The site is expected to generate some 70 vehicle trips in the road network peak hours.
         Assessment of the traffic impacts of the development at the Diamond Street / Elm Street
          intersection is outlined in this report. This analysis indicates that upgrade of this intersection is
          required, irrespective of development on this site, within the 10‐year design horizon.
         The currently planned signalisation of the Diamond Street / Elm Street intersection has been
          modelled for traffic volumes at the 10‐year design horizon. This assessment shows that the
          development has a minor impact, on the non‐critical approach. As such, contribution to the
          signalisation or further upgrade works are not suggested.
         The car parking layout generally meets the requirements of the Australian Standard, as outlined in
          this report.
         The vehicle crossover provides left‐in / left‐out access to the development.
         Appropriate on‐site servicing is proposed, with swept path assessments demonstrating access of
          Heavy Rigid Vehicles and Medium Rigid Vehicles, with a dedicated Small Rigid Vehicle bay.
         Pedestrian connectivity is achieved to both Diamond Street and Diamond Lane.
         Bicycle parking will be provided at the Diamond Street frontage.




www.bmctraffic.com.au                                                                                             19
BMC18169: 6 – 10 Diamond Street, Cooroy
6 December 2018
Log in to download the original file

Appendix C - Traffic + Carparking - 6-10 Diamond Street Cooroy - 21.12.18.pdf · 10.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.