Skip to the record
Accept no substitutions.

Original source · versioned page text

Appendix C - Traffic + Carparking - 6-10 Diamond Street Cooroy - 21.12.18

Attached to the e-mail Commercial Business Type 1 Office, Retail Business Type 2 Shop & Salon & Multiple Housing Type 4 Conventional - 4 units (Traffic & Car Parking Report) - MCU19/0001.

of 68

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

State code 6: Protection of state transport networks
Table 6.2.2: All development

   Performance outcomes                                    Acceptable outcomes                    Response
   Network impacts
   PO1 Development does not result in a worsening          No acceptable outcome is prescribed.   Performance
   of the safety of a state-controlled road.                                                      Outcome
                                                                                                  The site access will
                                                                                                  be restricted to left-
                                                                                                  in/left-out
                                                                                                  movements and
                                                                                                  appropriate sight
                                                                                                  lines are available
                                                                                                  at the site access
                                                                                                  location.
   PO2 Development does not result in a worsening          No acceptable outcome is prescribed.   Alternate Solution
   of the infrastructure condition of a state-controlled                                          There is discussion
   road or road transport infrastructure.                                                         in this report about
                                                                                                  required and
                                                                                                  planned upgrades
                                                                                                  to the Elm Street /
                                                                                                  Diamond Street
                                                                                                  intersection. The
                                                                                                  development has
                                                                                                  minimal impact on
                                                                                                  the operation of this
                                                                                                  intersection on the
                                                                                                  non-critical
                                                                                                  approach following
                                                                                                  signalisation and
                                                                                                  further upgrades are
                                                                                                  not required.
   PO3 Development does not result in a worsening          No acceptable outcome is prescribed.   Alternate Solution
   of operating conditions on a state-controlled road                                             There is discussion
   or the surrounding road network.                                                               in this report about
   To demonstrate compliance with this performance                                                required and
   outcome, it is recommended that an RPEQ                                                        planned upgrades
   certified traffic impact assessment, prepared in                                               to the Elm Street /
   accordance with the Guide To Traffic Impact                                                    Diamond Street
   Assessment, Department of Transport and Main                                                   intersection. The
   Roads, 2017, is provided.                                                                      development has
                                                                                                  minimal impact on
                                                                                                  the operation of this
                                                                                                  intersection on the
                                                                                                  non-critical
                                                                                                  approach following
                                                                                                  signalisation and
                                                                                                  further upgrades are
                                                                                                  not required.




www.bmctraffic.com.au                                                                                                      33
BMC18169: 6 – 10 Diamond Street, Cooroy
6 December 2018
Log in to download the original file

Appendix C - Traffic + Carparking - 6-10 Diamond Street Cooroy - 21.12.18.pdf · 10.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.