Attachment 1 - RECOR RFI Cover Letter Response_20210216

of 18

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 1, section 1. The text section number identifies this passage in the reader.

            28 September 2022

            Ref:        MCU22/0084

            Noosa Council
            PO Box 141
            TEWANTIN QLD 4565


            Attention:                           Mark Lewis

            Dear Sir,

                            Re:                  Information Request
                            At:                  62 Gateway Dr, Noosaville, Qld 4556


            With reference to the abovementioned information request for the development
            application (ref: MCU22/0084), we have been engaged to prepare additional information
            and design plans to respond to your queries as follows:

            Items 2. – 4. HRV/MRV zone and parking

            The design plans have been updated to address the information request with the
            additional details below:

                    -   The occasional parking space has been increased to the size required for a semi-
                        trailer loading bay (15.0m x 3.6m) to comply with the Driveway and Parking Code.
                        The occasional parking area will therefore be suitable for use as a semi-trailer to
                        serve all tenancies if required.
                    -   The occasional HRV/MRV parking area has been relocated further into the site to
                        reduce the risk of traffic conflicts at the entry/exit to the premises. This further
                        prevents the obstruction of the PWD space and visitor parking
                    -   Spaces to the rear of the site, which may be obstructed while the service vehicle
                        bay is occupied, are now nominated as staff parking to minimise disruption to
                        users of the site.

            Item 5. Crossover impact on existing stormwater structure

            The design plans have been updated to generally align with Standard Drawings RS-051
            and Council’s Drainage Standard Drawings. The proposed plans improve the drainage
            situation by:

                        •   Replacing the existing lintel and inlet with a new lip-in-line kerb inlet pit further
                            south of the driveway wing to ensure a minimum of 1m clearance to the pit
                            lintel. This will allow for capture of the existing kerb and gutter flows from
                            Gateway Drive, with the new grated inlet opening providing for greater
                            hydraulic capture.
                        •   The existing pit chamber will be modified to extend to approximately 2m in
                            length to retain the existing piped inlet and outlet connections so the existing



P +61 7 5211 1003             A 75 Noosa Drive, Noosa Heads QLD 4567   E [email protected]       recorconsulting.com
Log in to download the original file

Attachment 1 - RECOR RFI Cover Letter Response_20210216.pdf · 2.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.