Attachment 1 - RECOR RFI Cover Letter Response_20210216
Original PDF page 2, section 1. The text section number identifies this passage in the reader.
drainage isn’t compromised, while extending the chamber to the kerb inlet
opening. A concrete cover is to be provided above the existing pit.
• The pit chamber and pipes will remain accessible for maintenance through the
proposed grated inlet pit.
As the existing pipes aren’t impacted, the hydraulic intake efficiency of the pit is improved
and the lintel is clear of the driveway so the proposed replacement would minimise any
impact to the existing stormwater.
Item 6. Stormwater Management Plan
The original Stormwater Management Strategy undertaken by Cardno in 2008 (Ref:
LJ8705/R2_V2) utilised the current rainfall data and assumed a post-development
catchment area of 4.658ha and an impervious coefficient of 90%.
A DRAINS model was set up using the catchment characteristics defined under the
original stormwater management plan as well as the storage basin depth-volume
characteristics. The post development peak run-offs as well as the developed peak run-
offs with mitigation from the detention basin were validated against the reported values to
confirm the configuration of the model was consistent with the existing. The validated
results were relatively consistent with the previously modelled data. Refer to Attachment B
for details of these calculations.
The validated model was then rerun with the rainfall intensities increased by 20% to reflect
the forecast average rainfall increase under 2100 climate conditions to determine the
impact upon the effectiveness of the basin.
A comparison of the basin mitigation effects under current conditions, as well as 2100
climate conditions is shown below.
Current Climate 2100 Climate (20% increase)
A.E.P Qreduction (m³/s) Qreduction (%) Qreduction (m³/s) Qreduction (%)
63.2% AEP -0.797 -68% -0.995 -71%
0.5 EY -1.027 -70% -1.282 -72%
0.2 EY -1.340 -71% -1.513 -66%
10% AEP -1.527 -70% -1.700 -64%
5% AEP -1.605 -63% -1.811 -59%
2% AEP -1.799 -61% -2.008 -57%
1% AEP -1.842 -57% -2.156 -56%
As demonstrated above, the basin will continue to offer comparable reduction
effectiveness compared to a non-mitigated development, despite the increased flows. As
a result of the increased flow rates under the 2100 climate conditions however, there will
be an increase in the basin depth during the peak storms.
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads Qld 4567 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.