Minor Change Existing Approval MCU10 2017 01 [As Published] · MCU10/2017.01
Civil Engineering
Vehicle Access / Car Parking
9. Access and carparking shall be provided within the site generally as shown on drawing
number D-C00300-01-C prepared by Martoo Consulting dated 26 August 2010, except as
modified herein.
10. The access, carparking and manoeuvring area at the north-eastern corner of the site
accessed from Morwong Drive must be designed by an RPEQ and be in accordance with
Council’s Codes and Planning Scheme Policies. Plans of the access, carparking and
manoeuvring area must be included with the Building Works application for the site.
Certification of the completed access, carparking and manoeuvring area provided by an
RPEQ must be submitted to Council prior to the issue of a Form 21 for Building Works.
11. The one additional carparking bay in the northeast corner of the site shall be used exclusively
as a staff bay.
12. All staff carparking spaces shall be clearly defined by line marking each space with the words
“Staff Parking Only” and by sign posting each space with a similar wording.
13. All carparking shall be kept, maintained and line-marked in a condition fit for use.
Vegetation Protection & Preservation
14. Vehicular pavements within the drip zone of any of the existing trees on site which are to be
retained, shall be designed as a pervious pavement (such as grass paving cells or similar),
as this will allow water that falls on this surface to penetrate to the trees root system. The
pavement shall be constructed so as not to damage the tree or their root system and in this
regard temporary fencing shall be provided around the trees during construction to help
protect them.
15. Where retained tress are located in areas proposed to filled on site (or are located on
neighbouring allotments to the actual site to be filled), there will be a need to prevent
excessive fill material from being placed on the trees root system. To this end the design of
the filling works will need to incorporate terracing around the tree or a similar means of
ensuring that the natural ground level around the trees remains generally the same as
existing.
Roof Water & Stormwater Drainage
16. Stormwater runoff from the buildings and carparking areas must be controlled within the site
and discharged without causing scour or damage to the site, any adjoining property, and
Council infrastructure.
Earthworks
17. Filling works required on site shall be carried out in accordance with Council’s Planning
Scheme Policy PSP5 – Engineering Design Standards, so as not to cause the additional
ponding of water on any adjoining lands or the blockage of, or interference with, any natural
watercourses.
18. Earthworks carried out on site shall not affect the structural integrity of any of the existing
fences, structures or existing trees on the site and on the border of the development site.
Erosion and Sediment Control
19. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard, plan detailing the methods of controlling erosion and sediment in accordance
with the Healthy Waterways document and fact sheet series titled “Controlling Stormwater
Pollution on your Building Site dated 2006” are required to be submitted with the application
for a Building Works Permit.
Page 3 of 8
Document Set ID: 23407772
Version: 3, Version Date: 17/12/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval MCU10 2017 01 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 161 KB (small file)
- File type
No other editions are linked here.