Council archive · source document
Minor Change Existing Approval MCU10 2017 01 [As Published] · MCU10/2017.01
General
20. Any damage caused to any public utility during the course of construction shall be repaired
to Council’s standards and at no cost to Council.
21. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
22. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to
or from the site shall be covered to prevent materials including dust being windblown from
the vehicle.
Infrastructure Contributions
23. The applicant must pay contributions towards trunk infrastructure in accordance with the
following Planning Scheme Policies and Council Policies:
(a) Planning Scheme Policy 12 – Public Open Space Contributions;
(b) Planning Scheme Policy 13 – Contributions in Lieu of Off Street Parking;
(c) Planning Scheme Policy 20 – Pathway Trunk Network Contributions;
(d) Council Policy – Rural Roadworks Contributions;
(e) Council Policy – Master Drainage Contributions.
For material change of use of premises approvals the contributions must be paid prior to the
commencement of use, for reconfiguring a lot approval contributions must be paid prior to
Council approval of the plan of subdivision.
The actual amount of the contribution must be calculated and paid in accordance with the
Planning Scheme Policies and variations due to indexation current at the time of payment.
Unitywater
Town Water & Sewerage
24. The fire-fighting demand on Unitywater’s water supply system from the development must
not exceed 30 litres per second.
25. A single Unitywater installed primary water meter must be provided immediately inside the
property boundary. Additional water meters must be installed for each title of a community
title or sub-lease scheme. Meters must be Unitywater approved, installed in accordance with
Unitywater requirements and remain accessible at all times for reading and maintenance
purposes.
26. Construction works undertaken in the vicinity of Unitywater water supply or sewerage
infrastructure must not adversely affect the integrity of the infrastructure. All costs associated
with repair, replacement or alteration of infrastructure must be met by the applicant.
Page 4 of 8
Document Set ID: 23407772
Version: 3, Version Date: 17/12/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval MCU10 2017 01 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 161 KB (small file)
- File type
No other editions are linked here.