Attachment C - Stormwater report
Attached to the e-mail MCU14/0039 Response to information request Stormwater & Riparian reports email 2 of 3.
5. Flooding and Water Quantity Management 5.1. Introduction Hydrologic and hydraulic modelling has been undertaken of the site to establish the flow regime and peak discharges at the outlet of the site to the north. The modelling has been undertaken in XP-SWMM for both the pre and post development scenarios. The modelling undertaken for this SMP represents the site catchment only, and does not take into consideration the large catchment of which the site forms a part. 5.2. Catchments Due to the flat grades of the site and lack of defined flowpaths, the site has been considered as a single 33.2 ha catchment for the purposes of this modelling 5.3. Rainfall Intensities Intensity Frequency Duration (IFD) data for the site has been derived in accordance with Australian Rainfall and Runoff (ARR) though the use of the AUS-IFD software. The rainfall intensities generated for the site are shown below in Table 13. Table 13- IFD Data Applied to Hydrologic Assessment Duration I1 I2 I5 I10 I20 I50 I100 (mins) (mm/hr) (mm/hr) (mm/hr) (mm/hr) (mm/hr) (mm/hr) (mm/hr) 10 95 121 151 168 192 223 247 15 80 102 127 142 162 188 208 20 70 89 111 124 142 165 183 25 62 80 100 111 127 148 164 30 57 73 91 101 116 135 150 45 45.7 58 73 82 94 110 122 60 38.9 49.8 63 70 80 94 104 90 30.2 38.8 49.4 56 64 75 84 120 25.1 32.4 41.6 47.2 55 65 72 Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive Page 21 D’VINERIPE R003370
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.