Figure 8 – Pre- vs Un-Mitigated Post-Development Hydrographs – 1% AEP Event.
The peak flow rate from the site for the pre-development case has been assessed and the design
hydrograph for the 1% AEP plotted as Figure 8. To assess the peak flow rate during the post-development,
unmitigated scenario, an additional 2.016 ha (i.e. 140 m x 144 m roof area) of the impervious area was
added to the model. A summary of the pre- and post-development peak discharge for the 1% and 63% AEP
events is included as Table 14.
Table 14 – Performance of Mitigation Measures – Peak Flow Rate at LPD
3 3
AEP Pre-Development (m /s) Post-Development – mitigated (m /s)
1% 5.24 5.24
63% 1.09 1.09
Results of this assessment demonstrate there is no increase in peak flow rate from the site due to the
construction of the greenhouse. We typically observe an increase in flow rate due to an increase in
impervious surfaces. However, due to the remainder of the site and the flat grades across the site, no
increase was observed in this scenario. It is noted from Figure 8 that the leading edge of the hydrograph
rises quicker in the post-development scenario. This can be attributed to the increase in impervious area.
Further assessment of the XP-SWMM modelling results reveals an increase in runoff volume does occur for
the post-development scenario, but does not translate to an increase in peak flow rate. A comparison of
the runoff volumes for the pre- and post-development scenarios is contained below in Figure 9, and
demonstrates an increase in runoff volume of approximately 540 m3 during the post development scenario.
Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive Page 23
D’VINERIPE
R003370
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.