Original source · versioned page text
Attachment C - Stormwater report
Attached to the e-mail MCU14/0039 Response to information request Stormwater & Riparian reports email 2 of 3.
Figure 9 – A Comparison of the Runoff Volumes for the Pre- (left) and Post-Development (right) Scenarios. 5.6. Regional Flooding A hydrological model was developed by Hydrology & Water Management Consulting for the 1% AEP Duration Independent Storm (DIS) event. The hydrological model indicates a peak flow rate of approximately 470 m3/s is the critical design flow rate for the catchment at the site boundary. The design hydrograph was utilised by Water Technology in a flood model to determine the peak water levels and inundation extent for the site. The hydrographs of the 1% AEP design event for both the site and the catchment as a whole are shown in Figure 10. The peak flow rate from the farm site represents a little more than 1% of the peak flow in the whole catchment and therefore does not make a significant contribution. The 1% AEP DIS event hydrograph rises for approximately 8 hours before reaching the peak flow rate (and therefore peak water level at the site). Analysis of the site hydrology reveals the critical storm duration is the 180 minute storm. As illustrated by Figure 10, the critical hydrograph for the site has entered the receiving waters and left the site well before the peak flow rate associated with the larger catchment reaches the site. As a consequence, the increase in runoff volume associated with the greenhouse roof has no impact on the peak water level for flooding associated with the larger catchment. It is therefore considered that no adverse impacts associated with flooding will occur for neighbouring properties due to the construction of the greenhouse. Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive Page 24 D’VINERIPE R003370
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.