Attachment C - Stormwater report
Attached to the e-mail MCU14/0039 Response to information request Stormwater & Riparian reports email 2 of 3.
6.5. Roles and Responsibilities
Table 19 outlines the responsibilities of parties with respect to ESC during construction.
Table 19 - Roles and Responsibilities
Role Responsibility
Project Superintendent Overall responsibility of ESC implementation
Notify the Environmental Manager immediately of any non-compliance
with ESCP
Ensure the prompt implementation of measures to mitigate erosion and
sediment generation
Project Engineer Provide design information as required
Inspect ESC installation and maintenance
Inspect offsite impacts and management
Site Supervisor/Foremen Monitor daily rainfall
Notify Environmental Advisor/Consultant when runoff generating rainfall
occurs in the previous 24 hours
Maintain current records of rainfall, storage volumes, water quality,
treatment practices, discharge volumes (as appropriate)
Installation and maintenance of ESC
Environmental Advisor/Consultant Conduct in-situ monitoring (as required)
Collect and submit samples to laboratory (as required)
Collate results and prepare reports as required
Conduct site inspections and audits as required
Inspect ESC installation and maintenance
Inspect offsite impacts and management
Erosion and Sediment Control Auditor / Conduct site inspections and audits (as required)
Advisor (CPESC) Prepare audit reports (as required)
Provide advice regarding ESC site improvement (as required)
All Personnel Report any damage to ESC devices and any potential or actual
environmental harm in line with Duty to Notify under the requirements of
the Environmental Protection Act 1994
6.6. Corrective and Preventative Action
An environmental incident with respect to the ESCP is defined as any occurrence where sediment is
released from the site, whether controlled or uncontrolled, or where stormwater is released (controlled)
from site which does not meet the water quality requirements.
All incidents and non-conformances are to be reported, investigated and corrected in accordance with the
ESCP to ensure effective soil and water quality management practices at all times.
Best practice site management requires all ESC measures to be inspected by the Contractors nominated
representative at least daily when rain is occurring, within 24 hours prior to expected rainfall, and within 18
hours of a rainfall event of sufficient intensity and duration to cause onsite runoff (IECA, 2008). Such
inspections must check:
Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive Page 29
D’VINERIPE
R003370
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.