Attachment C - Stormwater report
Attached to the e-mail MCU14/0039 Response to information request Stormwater & Riparian reports email 2 of 3.
Daily site inspections (during periods of runoff producing rainfall):
Any sign of increased turbidity around the current work areas
Evidence of litter or hydrocarbon sheens around the work area ; and
Any potential sources of contamination on banks or pontoons.
Weekly site inspections (even if work is not occurring on-site):
Occurrences of excessive sediment deposition (whether on-site or off-site);
Occurrences of construction materials, litter or sediment placed, deposited, washed or
blown from the site, including deposition by vehicular movements;
Litter and waste receptacles; and
Oil, fuel and chemical storage facilities.
Spillkits are well stocked and readily available
Prior to anticipated runoff producing rainfall:
All potential sources of contamination, including waste bins, skips and on platforms
Following runoff producing rainfall:
All potential discharge points from pontoons and banks.
Occurrences of excessive sediment deposition;
Occurrences of construction materials, litter or sediment placed, deposited, washed or
blown from the site
Stormwater Management Plan – Lot 1 on SP108094, 305 Lake Macdonald Drive Page 30
D’VINERIPE
R003370
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.