SERVICES & ORGANISATION COMMITTEE MEETING AGENDA 7 MARCH 2017
Page 39 of 55
SERVICES & ORGANISATION COMMITTEE MEETING AGENDA 7 MARCH 2017
500524 500524 - Whole of Shire Playground Refurbishments 100,000 100,000 100,000 30,000 145 0.15%
500525 500525 - Whole of Shire Park Furniture Renewal 50,000 50,000 50.000 12,750 0.00%
500551 500551 - Noosa Hinterland Priority Playground - Planning & Design 0 49,178 49.178 689 1.40%
500594 500594 - Botanic Garden Shade House 0 0 28,000 523 1.87%
500618 500604 - Noosaville Foreshore Park Furniture Replacement 0 5,838 5,838 5,838 5,728 464 98.13%
500627 500613 - Tewantin RSL Park Shade Structure Renewal 0 48,093 24,781 24,781 23,581 95.16%
500666 500666 - Noosaville, Gympie Terrace Park Furniture Renewals 140,000 140,000 140,000 56,000 33,389 23.85%
500667 500667 - Pomona, Skate Park Shade Sail 25,000 25,000 25,000 7,500 19,909 79.63%
500668 500668 - Sunshine Beach, Skate Park Refurbishment 200,000 200,000 200,000 3,529 1.76%
500669 500669 - Noosaville, Munna Park Basketball Court Replacement 40,000 40,000 40,000 16,000 33,689 56 84.22%
500670 500670 - Noosaville, W yuna Drive Playground Renewal 85,000 85,000 85,000 34,000 71,511 84.13%
500735 500735 - Whole of Shire BBQ Renewals 0 0 98,000 0.00%
Total Parks & Playgrounds 685,000 825,373 929,102 238,674 231,369 519 33.78%
Pathways & Enabling Facilities
500099 500099 - Eenie Creek Pathway Stage 1 Signage 6,103 6,103 6,103 7,168 68,250 117.44%
500103 500103 - Cooroy Noosa Road Corridor Improvement 48.471 48.471 48.471 45,166 93.18%
500526 500526 - Noosa Heads Park Road, Boardwalk Design and consultation 30,000 90,000 90,000 130,879 7,192 145.42%
500616 500602 - Sunshine Beach - Solar Bollard Replacement Trial 2,164 2,164 2,164 1,798 83.08%
500628 500614 - Tewantin Poinciana Avenue Shared Path Upgrade Design & Const 84,224 $4,224 $4,224 84,135 99.89%
500629 500615 - Noosaville Eenie Creek Road OffRamp to Underpass Design & 123,043 543 543 1,098 202.29%
500630 500616 - Whole of Shire - Noosa Pedestrian and Cycle Data Counters 76,990 76.990 50,000 0 0.00%
500636 500622 - Noosa Heads Noosa Parade Road Corridor Upgrade - Design 161,617 161,617 121,617 38,359 75,106 23.73%
500643 500628 - Peregian Beach David Low Way Pathway Re-alignment 141,206 141,206 70,000 4,740 3.36%
500671 500671 - Noosa Heads, Park Road Boardwalk Construction 1,500,000 1,500,000 1,027,000 0 0 0.00%
500672 500672 - Noosa Heads, Main Beach Boardwak Construction 200,000 200,000 200,000 51,000 1,398 4,400 0.70%
500700 500700 - Noosaville, Sea Eagle Drive Pathway Construction 10,000 10,000 10,000 0 8,788 2,257 87.88%
500701 500701 - Cooran, James Street Pathways Construction 100,000 100,000 100,000 0 32,730 32.73%
500719 500719 - Munna Crescent Boardwalk Renewal 33,389 33,389 32,937 98.65%
500736 500736 - Tewantin Cranks Park Pathway Renewals 13,200 13,200 13,125 99.43%
500737 500737 - Noosa Heads Pinaroo Park Pathway Renewals 16,700 16,700 16,688 99.93%
500738 500738 - Noosaville Wallace Park Pathway Renewals 17,500 17,500 16.983 97.05%
500739 500739 - Peregian Beach David Low Way Raised Pedestrian Crossing 80,000 0 0.00%
500740 500740 - Botanic Gardens Pathway Replacement 129,075 0 0.00%
Total Pathways & Enabling Facilities 1,810,000 2.483.819 2,238,183 604,912 435,993 157,205 24.09%
Public Transport infrastractare
500001 500001 -Ekctric Bus Feasibility S tudy 0 0 0 0 640 253,052 0.00%
500312 500528 - Whole of Shire Bus Shelter Disabled Compliant Program 1,000,000 1,000,000 1,000,000 278,000 240,924 392,135 24.09%
500702 500702 - Noosaville, Lake Weyba Drive Bus Turnaround 200,000 200,000 0 0 0 0 0.00%
Total Public Trans port Infrastructure 1,200,000 1,200,000 1,000,000 278,000 241,564 645,187 20.13%
Sealed Roads Network
100742 100742 - Sealed Road Pavement surveys and Investigations 0 3,439 0 0 0 9,500 0.00%
500054 500054 - Whole of Shire - pavement surveys 0 1,350 0 0 0 0 0.00%
500206 500206 - Tewantin Cooroy Noosa Rd Stages 2-6 Design Only 0 104,481 104,481 60,000 20,955 6,694 20.06%
500530 500530 - Whole of Shire Reseal & Rehabilitation Program 4,000,000 4,473,547 4,473,547 1,698,064 1,176,925 3,542,255 26.31%
500531 500531 - Whole of Shire Pavement surveys and Investigations 2015/2016 0 0 0 2,063 0 0.00%
500544 500544 - Cootharaba - Dr Pages Road & Kinmond Creek Rd - Construction 0 91,609 91,609 90,558 4,000 98.85%
500619 500605 - Cooroy-Belli Ck Road Slip Repair 0 1,301 1,301 1,301 0 100.03%
500631 500617 - Sunrise Beach - Ben Lexcen Drive Southern end Road Corridor 179,321 179,321 53,796 244,644 5,628 136.43%
500633 500619 - Black Mountain Rd Landskp 299.265 299,265 234,000 34,228 35,125 11.44%
500741 500741 - Noosaville - Mary Street footpath, roadworks & drainage impr 0 74,400 0 35,266 20,721 47.40%
500747 500747 - Sunrise Road Cycle Lanes Design 0 0 0 821 0 0.00%
Total Sealed Roads Network 4,000,000 5,061,403 5,223,923 2,138,770 1,606,763 3,623,924 40.17%
Sports Ground and Facilities
500545 500545 - Tewantin Noosa District Sports Complex - ternal roadway pl 0 25,240 25,240 0 11,873 0 47.04%
500644 500629 - Girraween S portsground Water Bore & Storage 0 25,000 80.000 80,000 40,792 36,975 50.99%
500745 500745 - Tewantin, Sports Complex Stage 1 Carpark 0 21,350 11,009 51.57%
Total Sports Ground and Facilities 0 50,240 126,590 80,000 63.674 36,975 0.00%
Stormwater Drainage
500057 500057 - Gympie Terrace pipe rehabilitation 0 142,641 142,641 27,300 3,630 0 2.55%
500058 500058 - Re-lining of Ben Lexcen stormwater 0 13,327 13,327 13,327 5,829 0 43.74%
500060 500060 - Whole of Shire - stormwater structures 250,000 250,000 70,000 381 0 0.54%
500532 500532 - Whole of Shire CCTV Dramage program 2015/2016 0 20,773 20,773 20,773 7484 45,171 36.03%
500534 500534 - Whole of Shire S tormwater Pit Structure renewal program 125,000 125,000 125,000 25,000 326 49.400 0.26%
500535 500535 - Whole of Shire Kerb & Channel Renewal Program 30,000 30,000 30,000 6,000 106 0 0.35%
500634 500620 - Cootharaba Kinmond Creek Road Sandy Ck Amco Renewal - design 0 24,578 24,578 24,578 35,426 505 144.14%
500635 500621 - Cootharaba Kinmond Creek Road Eastern Branch Amco Renewal - 0 26,117 26,117 26,117 35,183 505 134.71%
500674 500674 - Cootharaba, Kinmond Creek Road Sandy Creek Culvert 750,000 750,000 1,050,000 14,186 520 1.35%
500675 500675 - Cootharaba, Kinmond Creek Road Eastem Branch Culvert 500,000 500,000 1,050,000 760 0 0.07%
500676 500676 - Noosaville, Thomas Street & Gympie Terrace Culverts 350,000 350,000 530,000 9,500 29,076 438,774 5.49%
500677 500677 - Whole of shire, Bioretention/Water S ensitive Urban Design 80,000 80,000 80.000 80,000 73,929 2,907 92.41%
500742 500742 - Tewantin Poinciana Ave Kerb & Channel Renewal 0 0 52,000 0 0.00%
500743 500743 - Noosaville Eenie Ck & Reef Street roundabout dramage mprov 0 0 15,500 0 0.00%
Total Stormwater Drainage 2,085,000 2,312,437 3,229,937 232,596 206,317 537,781 9.90%
Streetscapes and Road Corridors
500085 500085 - Peregian Beach - precinct planning 0 29,150 29,150 5,000 12,622 43.30%
500673 500673 - Peregian Beach, Peregian Square Pathways and Hard Landscapin 10,000 10,000 10,000 10,000 333 3.33%
500703 500703 - Whole of Shire, Street Lightmg Program 20,000 20,000 20,000 0.00%
500704 500704 - Pomona Master Plan 20,000 20,000 20,000 0.00%
500744 500744 - Noosa Heads Noosa Junction - Timber Assets Renewal 90,000 15,000 54 0.06%
Total Streetscapes and Road Corridors 50,000 79.150 169,150 30,000 13,010 26.02%
Transport and Infrastructure Management
500536 500536 - Tewantin Cooroy Noosa Rd Traffic Management Construction -A 0 0 1,794 1,794 2,642 147.28%
500300 500546 - Whole of Shire Forward Planning & Design Program - Construct 400,000 564,774 564,774 144,300 58,293 46,900 10.32%
500547 500547 - Sunrise Beach Ben Lexcen Drive School Crossing Improvement-c 23,303 0 0 0.00%
500548 500548 - Road directional signage (incl Noosa Entrance sign 2,290 2,290 2,290 10,213 446.07%
500552 500552 - Noosa Transport Strategy 0 29,708 29,708 30,220 600 101.72%
500553 500553 - Whole of Shire Street lighting program 2015/2016 13,669 13,669 0 191 1.40%
500615 500601 - Noosaville Eenie Ck Pathway signage stage 2 116.810 116.810 46,000 3,190 1,595 2.73%
500678 500678 - Castaways Beach, David Low Way Safety and Corridor Improveme 475,000 475,000 50,000 0 3,848 4,372 7.70%
500679 500679 - Tewantm, Hilton Terrace & Emest Street Intersection 1,425,000 1,425,000 425,000 0 7,900 1,000 1.86%
500680 500680 - Tewantin, Cooroy Noosa Road Improvements, Stage 4 360,000 360,000 360,000 31,750 954 3,800 0.27%
500705 500705 - Tewantm, Poinciana Avenue & Moorindil Street Intersection 300,000 300,000 50,000 406 406 0.81%
500706 500706 - Pomona, Station Road Car Parking and Safety Improvements 250,000 250,000 250,000 29,776 2,776 1.11%
500707 500707 - Whole of Shire, Significant Local Roads Directional Signage, 200,000 200,000 50,000 10,490 3,497 20.98%
500708 500708 - Sunshine Beach Pacific Ave/Sunshine Beach rd Minor Intersect 50,000 50,000 50,000 8,500 0.00%
Page 39 of 55See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.