Compiled Reference Documents - MCU25/0091 (As Published)

of 52

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (15.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 6, section 1. The text section number identifies this passage in the reader.

            Wingara Hills Pty Ltd




            Photograph 2: Base of southern side of the knoll location of TP5 (facing west)


            4.0       METHOD OF INVESTIGATION
            As part of our investigation, a desktop study was carried out comprising a review of the published geological
            maps of the area, the NC landslide hazard (susceptibility) maps and historical aerial imagery. This was
            followed by a site walkover and subsurface investigation.

            4.1 Walkover Survey and Subsurface Investigation
            Following the desktop study, a walkover survey was conducted to assess the ground conditions and to make
            an appraisal of the general condition of the site.

            The walkover survey was carried out by an engineering geologist on 29 July 2025.
            The walkover survey included assessment of topography, drainage, vegetation cover, geology, erosion, and
            slope stability. Results of the walkover survey are discussed in Section 5.0.
            4.2 Fieldwork
            The investigation fieldwork was undertaken on 29 July 2025 comprising five test pits (designated TP1 to
            TP5). Three test pits (TP1 to TP3) were excavated in the area of the proposed cabins. Test pits TP4 and
            TP5 were located in areas initially considered for effluent disposal fields.
            Test pits were excavated with a 4.5 tonne excavator, fitted with a 0.7 m toothed bucket to depths of up to 3
            m below ground level (BGL). Dynamic Cone Penetrometer (DCP) tests were also carried out adjacent to the
            test pits to assess soil strength.
            The fieldwork was carried out in the presence of a geotechnical engineer from Core, who logged the
            subsurface conditions in accordance with Australian Standard AS1726-2017 Geotechnical site
            investigations.
            Test locations were recorded in the field using a handheld GPS unit. Investigation locations are shown on
            the attached Figure 1.
            Reports of Test Pits are attached in Appendix A, together with explanatory notes. Subsurface conditions are
            discussed in Section 5.2.




            J002915-001-R-Rev0                                3


Document Set ID: 24031832
Version: 1, Version Date: 14/08/2025
Log in to download the original file

Compiled Reference Documents - MCU25_0091 (As Published).pdf · 15.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.