Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

Fmp 11C Church Street Pomona -1

of 45

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (137 MB): the original may take a few minutes to open or download. The page text below is quick to read.

                                                               FIRE MANAGEMENT REPORT FM 5601




       PERFORMANCE                  ACCEPTABLE OUTCOMES                    COMMENTS
       OUTCOMES
       PO1                          AO1.1
       Development maintains        Development which will materially      The proposed development is
       the safety of people         increase the number of people          not located within a medium or
                                    living or congregating on              high bushfire hazard area.
                                    premises, including reconfiguring
                                    a lot, is not located within a
                                    medium or high bushfire hazard
                                    area.

                                    AO1.2
                                    Development maximises setbacks
                                    from hazardous vegetation to           Setbacks from hazardous
                                    achieve an acceptable risk             vegetation is maximised to
                                                                           achieve an acceptable risk,
                                                                           demonstrated that only one
                                                                           building will be within 100m of
                                                                           threat vegetation
       PO2
       Bushfire mitigation          No acceptable outcome provided         The proposed development is
       measures do not                                                     situated within a cleared portion
       adversely impact on:                                                of the site and rehabilitation
            (a) Biodiversity                                               based on Low Threat
                 values,                                                   vegetation is required within the
                 connectivity,                                             water way corridor.
                 and ecosystem
                 functioning; and
            (b) The long-term
                 physical
                 integrity of
                 waterways,
                 wetland, and
                 areas of native
                 vegetation
       PO3                          AO3.1
       Development provides         Premises are connected to the          The premises will be served by
       an adequate water            reticulated water supply               reticulated water
       supply for firefighting
       purpose which is reliable,   OR
       safely located and freely
       accessible.                  AO3.2
                                    Where there is no available
                                    reticulated water supply, the
                                    premises has:
                                         (a) An accessible dam,
                                              swimming pool or water
                                              tank available for
                                              firefighting purposes with
                                              an onsite water volume
                                              of not less than 5,000
                                              litres; and
                                         (b) A water supply outlet
                                              pipe of 50 mm in
                                              diameter fitted with a
                                              standard fire brigade
                                              fitting connected to the
                                              water supply (other than
                                              where the water supply
                                              is in a swimming pool or
                                              dam)




ELDON BOTTCHER ARCHITECT PTY LTD                    ©             15/06/22                             40
Log in to download the original file

FMP 11C CHURCH STREET POMONA -1.pdf · 137 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.