FIRE MANAGEMENT REPORT FM 5601
PO4 AO4.1
Essential community Development involving essential The development does not
infrastructure is able to community infrastructure is not involve essential community
function effectively located within a medium or high infrastructure
during and immediately bushfire hazard area.
after bushfire events.
OR
AO4.2
Where located in a medium or
high bushfire hazard area,
development involving essential
community infrastructure is
designed to function effectively
during and after a bushfire event
in accordance with a Bushfire
hazard Management Plan.
PO5 AO5.1
Public safety and the Hazardous materials are not No hazardous material will be
environment are not manufactured or stored in bulk in manufactured or stored in bulk
adversely affected by the a bushfire hazard area on site
impacts of bushfire on
hazardous materials
manufacturing or storing
on site
PO6 AO6.1
Roads provide for easy The road layout provides for The access complies with “Fire
and safe evacuation of through -roads and avoids cul-de- Hydrant and Vehicle Access
premises and access by sacs and dead-end roads Guidelines for Residential,
emergency services. Commercial and Industrial Lots”
OR published by QFES and Qld
Government.
AO6.2
The development has a perimeter
road reserve with a minimum
width of 20m and maximum
gradient of 12.5%
OR
AO6.3
Cul -de-sacs or no through roads
are provided with fire trails or
access easements, which are
capable of being navigated by
conventional vehicles and which
link to through roads.
AO6.4
Safe access and egress is The access complies with “Fire
available at all times to all of the Hydrant and Vehicle Access
development for emergency Guidelines for Residential,
vehicles and personnel Commercial and Industrial Lots”
published by QFES and Qld
Government.
AO6.5
Where an emergency access No emergency access point is
point is required, it complies with required
the relevant works codes and
PSP6 Engineering Design
Standards
ELDON BOTTCHER ARCHITECT PTY LTD © 15/06/22 41
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.