Council archive · source document
07/2398 - SUPERSEDED Negotiated Decision Notice & copy sent to Referral Agencies [As Published] · 132007.2398
2007/2398
The “Turning Path 3” at the north western corner cul-de-sac to be
deleted. The bins for these nine units are to be placed at the nearest
trafficable thoroughfare for collection without any unnecessary reversing
or turning.
102. Provide an adequate number of recycling bins (240L or 1.1 cu.m. bulk) at the waste storage
areas of the Aged Care Residence, Apartment Building, Village Community Centre and
temporary service to the Independent Living Units whilst under construction. The proposed
HRV 12.5m length travel path and turning access to these areas will suffice for collection.
103. The 240L recycling wheelie bin service to the completed Independent Living Units requires:
103.1 Size of the service nodals to increase to accommodate eight bins i.e. one bin shared
between two units.
103.2 10m vehicle length (not 9m as proposed) travel path and turning access.
103.3 Bulk bins (1.1 cu.m.) may also be considered provided HRV 12.5m length access is
available.
104. Plans are to be submitted for approval by Council’s Environmental Health Section of the HRV
12.5m and 10m length waste vehicle travel paths and turning access. Plans must clearly show
routes and ensure that vehicle overhangs when turning are clear of all obstructions e.g. posts,
poles, fences, landscaping, etc.
105. All road traffic islands are to be trafficable for the waste vehicles.
106. All bins are to be placed in the correct position for collection at the roadside without the need
of the driver leaving the waste collection vehicle.
107. Council’s waste collection service during Stage 1 will not commence until the required road
access and waste storage facilities (including temporary ones), are in place.
108. A Waste Management Plan (construction and demolition) shall be submitted prior to
demolition, removal or relocation of any building other than a shed. Waste Management Plan
(construction and demolition) is also required for construction of 15 or more dwelling units or
for any business use of greater than 500m².
Waste Management Plans (construction and demolition) are required to be submitted in
accordance with Planning Scheme Policy 11, Waste Management Plans see table below.
Waste storage areas are to provide for adequate separation of all reusable, recyclable and
waste materials. These shall be located so that they are convenient and safe to use. The Plan
shall contain the following information:
The site area for the storage and separation of waste is to be shown on the plan
drawings accompanying the application.
A waste management table as indicated below is to be completed showing how waste
material is to be segregated - recycled – reused or disposed.
14 of 31
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2398 - SUPERSEDED Negotiated Decision Notice & copy sent to Referral Agencies [As Published]Related documentApplication case desk ↗
About this file
- File size
- 645 KB (small file)
- File type
No other editions are linked here.