                                                                                       2007/2398




67.   Stormwater pipelines within the site shall cater for 1 in 10 Years storm event and secondary
      flowpaths shall be provided within the site to cater for 100 years storm event.
68.   The development must not adversely impact on the existing drainage conditions on other
      properties including not depriving dams on other properties of their natural stormwater runoff.
69.   The applicant shall revise the Concept Stormwater Management Plan for Cooroy Retirement
      Village Trading Post Road, Cooroy prepared by Brown Consulting dated June 2008 to detail a
      stormwater treatment train that can achieve Load Reduction Targets for Total Suspended
      Solids, Total Phosphorous and Total Nitrogen in accordance with the Healthy Waterways
      Water Sensitive Urban Design – Technical Guidelines for South East Queensland (2006). This
      revised stormwater treatment train for the site shall ensure that nutrients can be adequately
      treated prior to release off site. The revised Concept Stormwater Management Plan shall
      specify water quality objectives for stormwater prior to it leaving the site to ensure the
      modelled outcomes are achieved. All stormwater runoff treatment must be undertaken within
      the development areas of the site.
      The applicant shall submit an amended plan for Council approval prior to a Development
      Permit for Operational Works being issued.
70.   Stormwater Quality Improvement Devices as detailed within the Concept Stormwater
      Management Plan for Cooroy Retirement Village Trading Post Road, Cooroy prepared by
      Brown Consulting dated June 2008 and any updates approved by Council shall be installed
      within the development to ensure compliance with the designated water quality objectives are
      achieved. Stormwater likely to contain grease and oil (i.e. from carparking areas) shall be
      managed via grease and oil arrestors prior to treatment within bioretention basins and
      wetlands.
71.   Wetlands and bioretention basins shall be designed and constructed in accordance with
      Healthy Waterways Water by Design Construction and Establishment Guidelines: Swales,
      Bioretention Systems and Wetlands February 2009.
72.   A Stormwater Monitoring and Maintenance Plan (SMMP) shall be prepared ensure stormwater
      treatment infrastructure is performing its intended purpose. The SMMP shall be approved by
      the Council’s CEO or delegated officer prior to issue of any Operational Works Approval. The
      SMMP shall specify:
      72.1    performance indicators including water quality objectives;
      72.2    monitoring schedule to ensure specified performance indicators are achieved;
      72.3    maintenance schedule for all elements of the stormwater treatment train;
      72.4    reporting requirements;
      72.5    corrective actions for non compliance with performance indicators; and
      72.6    responsibility framework.
Sewer Mains
73.   The site must be connected to Council's existing sewerage reticulation system by gravity, and be
      constructed in accordance with Council's standards and requirements at no cost to Council.
74.   The sewer connection shall be generally in accordance with the Sewerage Layout Plan
      Drawing No N07058-DA10 Issue E dated 22/01/09 and the Proposed Sewer Details N07058-
      DA20 Issue (A) dated 22/01/2009 by Brown Consulting. A Development Permit for
      Operational Works is required.
75.   A new sewer connection must be provided within the property boundary of Lot 4 RP 215922.
76.   The applicant must provide written approval from all property owners through which external
      sewers will traverse, to enter, construct and provide a sewer easement. This must be submitted
      prior to the associated development application for Operational Works.

                                                                                         9 of 31

Used in these records

About this file

File size
645 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2398 - SUPERSEDED Negotiated Decision Notice & copy sent to Referral Agencies [As Published].pdf · 645 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.