1.9 LPG GAS SERVICES
The work under this section comprises the complete supply and installation of connection of the
LPG gas service from the gas service connection and reticulated throughout the buildings to the
various nominated connection points as nominated on the drawings.
An LPG gas main shall service the hot water generation system, and shall also facilitate
connections to the laundry and kitchen as required for cooking/washing equipment.
The LPG gas service shall be designed in accordance with AS 5601.
Gas services pipework shall be Type B copper tube to AS 1432 of sizes shown on the drawings, and
the underground pipework shall be HDPE pipework complete with gas colour coded pipe.
The gas services works must comply with the following Australian Standards :
AS 1304 Welded Wire Reinforcing Fabric for Concrete
AS 1326 Polythene Film for Packaging and Allied Purposes
AS 1345 Identification of the Contents of Piping, Conduits and Ducts
AS 1599 Pressure Sensitive Adhesive Packaging Tapes
AS 1697 SAA Gas Pipeline Code
AS 2032 Code of Practice for installation of UPVC pipe systems
AG 601 Gas Installation Code
CAROL WILLIAMSON
DIRECTOR
BRW Enterprises (Qld) Pty Ltd
May 25, 2018.
Document : 14,967/da-rep/A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.