Original source · versioned page text
Appendix K - Hydraulic and Wet Fire Services Report
BRW Enterprises (Qld) Pty Ltd
“DA Report”, PF 80 Cooroy Care Farm Development for LCC. Page : 3
______________________________________________________________________________________
With regards to fire services, the fire service tanks and pumps, and booster assemblies, will be
required to be installed within the first part of the development, and can then be further utilised to
service the future stages. As part of the masterplan design for the overall site, a fire hydrant ring main
will be proposed for the overall site, but smaller ring mains will then facilitate supply to the
individual stages of the development to achieve compliance.
With regards to pipework materials and hydraulic items to be used in this project, a full
assessment of all commercially available products shall ensure that the most suitable and durable
products are specified. Equipment and materials shall be selected with particular relevance to
extended longevity with minimal maintenance. The schematic design and design development
phase of the project shall fully encompass and review all ESD Items and Initiatives including
water harvesting methodology and the use of WELS rated tapware.
1.1 DESIGN PARAMETERS
Sewer drainage, house drainage and sanitary plumbing and trade waste drainage and
plumbing shall be designed in accordance with Australian Standard, AS 3500.2.2.
Hot and cold water services shall be designed in accordance with Australian Standards, AS
3500.1 and AS 3500.4.
Fire services shall be designed in accordance with Australian Standards, AS 2118.1, AS
2419.1 and AS 2441.
Pipework materials, fixtures and tapware shall be specified in accordance with Australian
Standards and specific client requirements.
All underground drainage and water service pipework shall be identified with approved
traceable marker tape. All visible pipework shall be identified/labeled in accordance with
Australian Standard, AS 1345 – 1995.
Gas Services shall be designed in accordance with AS/NZS 5601.
The hydraulic service system shall be inspected and tested by the applicable authority to ensure
conformance. Hydraulic service documentation submission shall be made to the Noosa Shire
Council & QFES to ensure that all required permits are obtained for the hydraulic service system.
Document : 14,967/da-rep/A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.