Council archive · source document
SUPERSEDED Decision Notice - 010.2007.00002179.001 [As Published] · 172007.2179
2007/2179
8. The proposed development shall have all kitchen, laundry and bathroom fittings that comply
with the AAA Water Conservation Rating System as defined by the AS/NZS 6400 (Water
Efficient Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and
Drainage Standard Part 1.2), with toilets to comply with the AAAA Water Conservation Rating
System. All tap ware and shower roses shall not exceed a maximum flow of 9 litres per min.
Dishwashers and washing machines are excluded from this requirement.
9. All hot water systems installed shall be either solar systems; electric heat pump systems; or
gas systems (LPG or natural).
10. Existing trees on the site and within road reserves are to be retained, except where required to
be removed due to building operations or the conduct of the approved use. All other
vegetation shall be protected from interference resulting from clearing or construction activities
by:
10.1. Clearly marking vegetation to be retained with flagging tape;
10.2. Installing protective fencing around the drip line of the vegetation;
10.3. Low impact construction techniques are used around vegetation to minimise
interference with the vegetation.
11. Cleared vegetation is to be suitably processed by one of the following methods and removed
from the site: -
11.1. Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled
loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a
minimum of 10 metres between edges of heaps.
11.2. Disposal for firewood.
11.3. Disposal for landscaping purposes.
11.4. Transport to alternative site for breaking down materials provided that all necessary
permits have been obtained to allow the alternate site to be used for this purpose.
11.5. The Applicant is advised that other methods may be considered provided full details of
the method are submitted.
11.6. The applicant is advised that burning off is an unacceptable method of disposal.
12. Buildings and structures (including swimming pools, sheds, tennis courts or outbuildings) are
not constructed under overhead electricity transmission lines, or within any easements.
13. The rear fence adjacent to the beachfront shall be no more than 1.2 metres in height, be of
open construction (at least 50% transparent) and constructed of lightweight materials.
13.1. Gates must not be installed along the rear property boundary.
Demolition
14. Infrastructure including reticulated water, sewerage, stormwater, and electricity are to be
protected from damage and made safe to the standard required by the regulatory authority;
15. All infrastructure must be disconnected, capped or sealed including:-
Page 3 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Decision Notice - 010.2007.00002179.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 60 KB (small file)
- File type
No other editions are linked here.