Skip to the record
The gold standard in government transparency.

Council archive · source document

SUPERSEDED Decision Notice - 010.2007.00002179.001 [As Published] · 172007.2179

of 8

Text shows just the words. Original shows the document exactly as it was published.

                                                                                          2007/2179



              electricity meters removed and electrical wires disconnected; and

              telephone lines are disconnected; and

              high speed data cables and television provider boxes are disconnected and removed to
              the standard required by the regulatory authority;

16.    All building materials containing asbestos, including asbestos cement sheeting or roofing and
       lagging, must be removed from the building and disposed of in accordance with industry best
       practice.
17.    Waste generated during construction must be stockpiled in a centralised location and covered
       as required to prevent material being blown onto adjoining properties including the road
       reserve or food waste from generating vermin. All site waste must be disposed of to an
       approved waste disposal facility either directly or via an approved waste receptacle and
       collection service.
18.    Sediment and erosion control measures must be placed on site prior to the works
       commencing and shall be maintained until all works are complete. The erosion and sediment
       control measures shall be in accordance with the “Best practice guidelines for control of
       stormwater on building sites” prepared by Healthy Waterways (available at
       www.healthywaterways.org). If such measures are not in place or are not satisfactory, ‘on the
       spot’ fines may be issued. Such fines can be issued if sediments from the site are found to
       enter or have the potential to enter Council’s stormwater system or natural waterways.
Currency
19.    The Preliminary Approval for Building Work lapses if building work has not happened by 26
       August 2010, unless an application to extend the currency is approved by Council.

5      REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:

 Referral Trigger            Referral Status     Referral Agency         Referral Address

 Nil

6      APPROVED PLANS/DOCUMENTS

The approved plans and / or documents for this development approval are listed in the following
table:
 Plan / Document No.       Rev.    Plan / Document Name                        Date
 Sheet 1/8                         Site Plan – Deborah Wagner Architect        26.7.08
 Sheet 2/8                         Lower Level Floor Plan – Deborah            26.5.08
                                   Wagner Architect
 Sheet 3A/8                        Upper Level Floor Plan – Deborah            26.7.08
                                   Wagner Architect
 Sheet 4A/8                        Clerestory & Roof Plans – Deborah           26.7.08
                                   Wagner Architect
 Sheet 5A/8                        Elevations    1    –     Deborah   Wagner   26.7.08
                                   Architect
 Sheet 6A/8                        Elevations    2    –     Deborah   Wagner   26.7.08
                                   Architect
                                                                                         Page 4 of 8

Used in these records

About this file

File size
60 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED Decision Notice - 010.2007.00002179.001 [As Published].pdf · 60 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.