Skip to the record
Beware of cheap imitations.

Original source · versioned page text

cover letter

of 9

Page text shows just the words. Original shows the document exactly as it was published.

       Ultimate Allocation

       The additions will form part of the final CTS stage 402 which will be allocated to the Parkridge Social Club Community
       Title Scheme.

       Please find attached assessment against the applicable assessment provisions within Appendix C.

       2.4          Changes to Conditions

       The following conditions will require updating/amending (please note, requested additions to conditions are notated
       in bold text and deletions notated by way of strikethrough):

       Condition 2
       Request: It is requested that condition 2 Plans of Approval list is updated for the Maintenance Shed site to include
       the latest Architectural Package (as enclosed in Appendix A) and remove the superseded Architectural Plans.

       The list of approved drawings to be updated to incorporate the following plans:
         Plan No.            Rev.    Plan/Document Name                                                           Date
         7043‐DA01            14     LOCATION PLAN & PROJECT SUMMARY – GFA 2020 by Blackburne Jackson          17‐12‐21
         7043‐DA02            18     SITE PLAN by Blackburne Jackson Design                                    17‐12‐21
         7043‐DA03            17     SITE PLAN by Blackburne Jackson Design                                    17‐12‐21
         7043‐DA04            11     SITE PLAN by Blackburne Jackson Design                                    17‐12‐21
         7043‐DA05            13     SITE SECTIONS by Blackburne Jackson Design                                17‐12‐21
         7043‐DA26            03     FINISHES PALETTE/SCHEDULE by Blackburne Jackson Design                    17‐12‐21
         7043‐DA30            03     HEIGHT PLANE PROJECTIONS by Blackburne Jackson Design                     17‐12‐21
         7043‐DA40            03     HEIGHT PLANE PROJECTIONS ABOVE PROPOSED GROUND by Blackburne Jackson      17‐12‐21
                                     Design
         7043‐DA50            09     SITE MAINTENANCE SHED: PLAN, ELEVATIONS & SECTION by Blackburne Jackson 17‐12‐21
                                     Design
         7043‐DA102           09     SITE MAINTENANCE SHED LANDSCAPING by Blackburne Jackson Design            17‐12‐21



       Condition 3
       It is requested condition 3 is updated to reflect the 1 additional Manager’s unit, as follows:

       3            The approved development comprises a total of 1 x 1 bedroom, 17 x 2 bedrooms and 22 x 3 bedroom units.
       Adopted Infrastructure Charges Notice

       In accordance with Council's resolution No 5.1 dated 16 October, 2020:‐

                   The figure will be split (60% Noosa Council and 40% Unitywater).
                   As the managers residence is 1 or less bedrooms (lower demand), Council states in the AICR, a reduction of
                    ‐$4,135.46 / ‐31.9% will apply.
                   Council Infrastructure Charge ‐ $8,818.84 for 1 bedroom unit




JFP Ref: M2652/E2                                                                                                Page 5
Log in to download the original file

cover letter.pdf · 349 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.