Council archive · source document
Representations · MCU24/0153
Our Ref: 20240911 Council Ref: MCU24/0153 and OPW24/0202 26 September 2025 Noosa Council PO Box 141 Tewantin QLD 4564 Via email: [email protected] Attention: Andrew Gaffney Dear Andrew, REPRESENTATIONS - DEVELOPMENT PERMIT FOR A MATERIAL CHANGE OF USE OF PREMISES (MULTIPLE DWELLING - 6X SMALL DWELLINGS) AND OPERATIONAL WORKS (ENGINEERING AND LANDSCAPE WORKS) AT 51 ELANDA STREET, SUNSHINE BEACH (LOT 403 RP48112) Further to the Council’s Decision Notice and Preliminary issued on 18 August 2025 for the above development application, and pursuant to Section 75 of the Planning Act 2016, we now make the following representations in regards to Council’s approval. We also request that the Decision Notice is converted to a Development Permit for Operational Works. Please find attached: ● Revised Proposal Plans prepared by Archend; ● Revised Landscape Plans prepared by Anembo Consultants; and ● Revised Engineering Plans and Technical Memorandum prepared by Recor. The following representations are made based on the amended plans. Any new wording will be included in bold writing, and words proposed to be deleted will be struckthrough. APPROVAL TYPE It is requested that the approval type is amended as follows: ● Development Permit for Material Change of Use - Multiple dwelling (6 x small dwellings); ● Preliminary Approval Development Permit for Operational Works – Roadworks, Stormwater, Landscaping and Earthworks.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 4 pages
Page 2
MATERIAL CHANGE OF USE
Condition 3
In accordance with the Decision Notice list of plan amendments, the Architectural Plans have been
revised as follows:
● The laundry areas in Units 1 and 2 and the kitchens in Units 3-6 have been included in the gross
floor area calculations. The proposed plot ratio is 0.75:1;
● Unit 1 courtyard screening has been increased to 3.5m in length along the northern alignment;
● Unit 3 northern external curved blade wall outside of Bed 3 and Living/Dining has been deleted;
● Unit 5 garden bed along the northern side setback has been increased to 2m;
● Unit 5’s rooftop terrace platform has been setback to achieve a minimum setback of 2.5 metres
(this includes the pool, terrace and planter box);
● The building height is less than 12 metres above ground level, except where relating to minor
elements (i.e., part of the balustrade on the rooftop terrace).
As such, it is requested that the Approved Plans table is amended to include the following plans:
Plan No. Rev. Plan/Document Name Date
08 D Site Plan, prepared by Archend 23.09.2025
11 D Site Plan - Landscaping Areas, prepared by Archend 23.09.2025
15 D Floor Plan - Basement, prepared by Archend 23.09.2025
16 D General Arrangement - Ground Floor, prepared by Archend 23.09.2025
17 D Floor Plan - Level 1, prepared by Archend 23.09.2025
18 D Floor Plan - Level 2, prepared by Archend 23.09.2025
19 D Floor Plan - Roof, prepared by Archend 23.09.2025
20 D Floor Plan - Ground GFA, prepared by Archend 23.09.2025
21 D Floor Plan - Level 1 GFA, prepared by Archend 23.09.2025
22 D Floor Plan - Level 2 GFA, prepared by Archend 23.09.2025
23 D North Elevation, prepared by Archend 23.09.2025
24 D South Elevation, prepared by Archend 23.09.2025
25 D West and East - Elevation, prepared by Archend 23.09.2025
26 D Section A, prepared by Archend 23.09.2025
27 D Section A2, prepared by Archend 23.09.2025
28 D Section B and B2, prepared by Archend 23.09.2025
2
Page 3
OPERATIONAL WORKS
In accordance with Condition 1 of the Preliminary Approval for Operational Works, the Engineering and
Landscape Plans have been revised to reflect the Architectural Plans. In addition to this, the Engineering
and Landscape Plans have been amended to include the following:
● Updated stormwater and engineering drawings including:
a. Additional detail demonstrating that the post-development peak flow rate discharging to
structure “7/1” does not exceed the pre-development peak flow rate. The detail must clearly
demonstrate that the development and calculations incorporate appropriate climate change
allowances in accordance with AO2.4 of the Water Quality and Drainage Code.
b. Additional detail confirming an appropriate climate change allowance has been applied to the
sizing of all detention tanks.
c. A stormwater design calculation table.
d. Details of detention outlet orifices / controls.
e. Engineering documentation showing the materials, stair treatment and handrails along the
pedestrian pathway adjacent to the southern frontage;
f. Prepared by a suitably qualified person (RPEQ)
● Updated access drawings/documents including:
a. Appropriate manoeuvring areas for access to the car stackers in accordance with
AS2890.1:2004 and the manufacturers specifications.
b. Linemarkings for the car stackers.
c. Prepared by a suitably qualified person (RPEQ).
It is requested that standard conditions are applied to the Development Permit. In addition, it is
requested that the Approved Plans table is amended to include the following plans:
Plan No. Rev. Plan/Document Name Date
Landscape Plans
S2411198 E General notes, sheet layout and site location, prepared by 26.09.25
LD1 Anembo Consultants
S2411198 C Project specifications, prepared by Anembo Consultants 26.09.25
LD2
S2411198 C Project specifications, annual maintenance and finishes 26.09.25
LD3 schedule, prepared by Anembo Consultants
S2411198 C Plant schedules, prepared by Anembo Consultants 26.09.25
LD4
S2411198 C Typical details, prepared by Anembo Consultants 26.09.25
LD5
S2411198 C Landscape Plan (Ground 1/2), prepared by Anembo 26.09.25
LP1 Consultants
S2411198 C Landscape Plan (Ground 2/2) and Basement, prepared by 26.09.25
LP2 Anembo Consultants
3
Page 4
S2411198 C Landscape Plan (First Level), prepared by Anembo 26.09.25
LP3 Consultants
S2411198 C Landscape Plan (Second Level), prepared by Anembo 26.09.25
LP4 Consultants
S2411198 C Landscape Plan (Roof), prepared by Anembo Consultants 26.09.25
LP5
Engineering Plans
Technical Memorandum, prepared by Recor 26.09.25
20240127 B Cover Sheet and Locality Plan, prepared by Recor 26.09.25
001
20240127 B General Notes, prepared by Recor 26.09.25
002
20240127 B Existing Layout Plan, prepared by Recor 26.09.25
003
20240127 B Siteworks Overall Layout Ground, prepared by Recor 26.09.25
010
20240127 B Siteworks Overall Layout Basement, prepared by Recor 26.09.25
011
20240127 B Detailed Ground Level Layout, prepared by Recor 26.09.25
012
20240127 B Vehicle Crossover Longitudinal Section, prepared by Recor 26.09.25
014
20240127 B Footpath Longitudinal Section, prepared by Recor 26.09.25
015
20240127 B Roadworks Details, prepared by Recor 26.09.25
016
20240127 B Driveway Vertical Vehicle Tracking, prepared by Recor 26.09.25
017
20240127 B Bulk Earthworks Layout Plan, prepared by Recor 26.09.25
020
20240127 B Bulk Earthworks Sections - Sheet 1, prepared by Recor 26.09.25
021
20240127 B Bulk Earthworks Sections - Sheet 2, prepared by Recor 26.09.25
022
20240127 B Stormwater Catchment Layout, prepared by Recor 26.09.25
041
4
Page 5
20240127 B Stormwater Longitudinal Sections - Sheet 1, prepared by 26.09.25
042 Recor
20240127 B Stormwater Longitudinal Sections - Sheet 2, prepared by 26.09.25
043 Recor
20240127 B Stormwater Details, prepared by Recor 26.09.25
044
20240127 B Water and Sewer Layout Ground Level, prepared by Recor 26.09.25
050
Should you have any questions in relation to the above, please do not hesitate to contact the
undersigned.
Yours faithfully,
Adapt Development Management Pty Ltd
Liam Pinese Tiani Boulton
Managing Director Director
E: [email protected] E: [email protected]
M: 0432 497 857 M: 0404 924 160
5
Used in these records
Representations.pdfRelated documentApplication case desk ↗
About this file
- File size
- 290 KB (small file)
- File type
No other editions are linked here.