Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

Representations · MCU24/0153

of 5

Text shows just the words. Original shows the document exactly as it was published.

MATERIAL CHANGE OF USE

Condition 3

In accordance with the Decision Notice list of plan amendments, the Architectural Plans have been
revised as follows:

    ●​ The laundry areas in Units 1 and 2 and the kitchens in Units 3-6 have been included in the gross
       floor area calculations. The proposed plot ratio is 0.75:1;
    ●​ Unit 1 courtyard screening has been increased to 3.5m in length along the northern alignment;
    ●​ Unit 3 northern external curved blade wall outside of Bed 3 and Living/Dining has been deleted;
    ●​ Unit 5 garden bed along the northern side setback has been increased to 2m;
    ●​ Unit 5’s rooftop terrace platform has been setback to achieve a minimum setback of 2.5 metres
       (this includes the pool, terrace and planter box);
    ●​ The building height is less than 12 metres above ground level, except where relating to minor
       elements (i.e., part of the balustrade on the rooftop terrace).

As such, it is requested that the Approved Plans table is amended to include the following plans:


  Plan No.     Rev.                     Plan/Document Name                                 Date

     08          D     Site Plan, prepared by Archend                                   23.09.2025

     11          D     Site Plan - Landscaping Areas, prepared by Archend               23.09.2025

     15          D     Floor Plan - Basement, prepared by Archend                       23.09.2025

     16          D     General Arrangement - Ground Floor, prepared by Archend          23.09.2025

     17          D     Floor Plan - Level 1, prepared by Archend                        23.09.2025

     18          D     Floor Plan - Level 2, prepared by Archend                        23.09.2025

     19          D     Floor Plan - Roof, prepared by Archend                           23.09.2025

     20          D     Floor Plan - Ground GFA, prepared by Archend                     23.09.2025

     21          D     Floor Plan - Level 1 GFA, prepared by Archend                    23.09.2025

     22          D     Floor Plan - Level 2 GFA, prepared by Archend                    23.09.2025

     23          D     North Elevation, prepared by Archend                             23.09.2025

     24          D     South Elevation, prepared by Archend                             23.09.2025

     25          D     West and East - Elevation, prepared by Archend                   23.09.2025

     26          D     Section A, prepared by Archend                                   23.09.2025

     27          D     Section A2, prepared by Archend                                  23.09.2025

     28          D     Section B and B2, prepared by Archend                            23.09.2025




                                                                                                     2

Used in these records

About this file

File size
290 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Representations.pdf · 290 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.