Council archive · source document
132006.268.03 - Amended Court Approval - Attachment 2
The estimated trip generation from the site is expected to generate up to 40 truck movements per week, including refuse collection, deliveries and water carrying vehicles. This equates to 8 trucks per day or 16 trips (8 arrivals and 8 departures) spread throughout the daily hours of operations 7:00am until 6:00pm, Monday to Friday. It is also estimated the site will generate 10 to 15 light vehicle movements per day including staff and ancillary business uses. Assessment of Existing Access The sight visibility has been reviewed in accordance with Clause 3.4 of Austroads 2009 Guide to Road Design — Part 4A: Intersections. Sight distance is measured along the carriageway from the approaching vehicle to the conflict point. The posted speed limit on this section of road is 60km/h. The safe intersection sight distance (SISD) for an observation time of 3 seconds and reaction time of 2.0 seconds (Refer to Table 3.2 of Part 4) for 60km/h is 123m. The access intersection meets this requirement to the west and achieves a sight distance of 130m. The site distance to the east was measured to be 113m; however the additional 10m can be achieved through the removal of vegetation within the road reserve as shown in red in the photographs below. The vegetation is overgrown saplings only ranging in trunk diameter of 50 to 150mm. RoadPro Development ABN 98 615 073 565 13492 Cooroy Mtn Spring Water Access Page 2 of 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
132006.268.03 - Amended Court Approval - Attachment 2.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.