Council archive · source document
132006.268.03 - Amended Court Approval - Attachment 2
Photograph 2 — View looking west from Access The access driveway location has been reviewed with consideration to the number of vehicles accessing the site. The existing driveway has been operating adequately for many years. The proposal meets the requirement for access driveway location in accordance with Clause 3.2.3 and Figure 3.1 of AS2890.1:2004. Given the good sight visibility, low traffic volumes and the existing local driver awareness of this access, it is considered appropriate to retain the driveway in its current location. The driveway has been assessed in regard to operational performance. According to Austroads Guide to Traffic Management Part 3 — Traffic Studies and Analysis, Table 6.1, “At unsignalised intersections with minor roads where there are relatively low volumes of cross and turning traffic, capacity considerations are usually not significant and capacity analysis is unnecessary’. Table 2 below shows the volumes where intersections operate adequately and capacity analysis is not required. Roadway Capacity Type of Road Light cross & turning volumes Maximum design hour volumes Vehicles per hour (two way) Two Lane major road 400 500 650 Cross road 250 200 100 The traffic volumes for Cooroy Mountain Road are 500 vehicles per day with less than 100 vehicles in the peak hour past the subject site. RoadPro Development ABN 98 615 073 565 13492 Cooroy Mtn Spring Water Access Page 3 of 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
132006.268.03 - Amended Court Approval - Attachment 2.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.