Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

132006.268.03 - Amended Court Approval - Attachment 2

of 46

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Roadworks Contributions

15.

16.

A contribution of $5,960 shall be paid to the Council towards the cost of improvements
to the major road network of Cooroy, as a result of increase traffic generation caused
by the proposed development. The contribution shall be paid to the Council prior to
obtaining a Development Permit for Operational Works. This amount will be subject to
variations in the Consumer Price Index, All Groups Brisbane from December 2007 until
the date of payment.

A contribution of $160,975 shall be paid to the Council towards the cost of
improvements to Cooroy Mountain Road, as a result of increase traffic generation
caused by the proposed development. The contribution shall be paid to the Council
prior to obtaining a Development Permit for Operational Works. This amount will be
subject to variations in the Consumer Price Index, All Groups Brisbane from December
2007 until the date of payment.

Water Quality

1%.

The applicant shall submit a Water Quality Management Plan for approval prior to the
issue of any Operational Works Permit. The water quality management plan shall
address treatment of runoff from the proposed use including effluent, car park runoff
and by product of the industrial use occurring on site. It shall demonstrate that the
treatment system proposed results in a no worsening of the water quality of runoff from
the site as a result of the business operations. It will include the requirement for water
quality to be monitored for a period of three years from the construction of the car
parking and effluent disposal systems.

Effluent Disposal

18.

18A. The design and construction of the on-site effluent disposal system and disposal area

shall be in accordance with the Site and Soil Investigation for On-site Wastewater
Treatment and Effluent Disposal prepared by Future-plus Environmental, dated
February 2014, subject to the following requirements:

(i) | Ongoing monitoring of treatment process and disposal areas shall be undertaken
to ensure both are functioning effectively over time. They shall be undertaken
generally as follows:

. Annual monitoring shall be undertaken from the time of commissioning to
determine the quality of the wastewater produced from the effluent
treatment system;

. Monitoring of the soils, vegetation and groundwater in the application area
shall be undertaken every three years to establish that such is not
percolating into the groundwater;

. Sampling and testing shall be in accordance with relevant regulatory
requirements and manuals such as those provided by the Environmental
Protection Agency, with testing undertaken by an accredited Laboratory;

° Continuous monitoring shall be undertaken by the system for any water on
the surface of the application area, downslope resurfacing, changing plant
growth on or around the application area and any other signs of problems,
and addressed through maintenance or servicing.

(i) -
(ii) -

Used in these records

About this file

File size
8.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

132006.268.03 - Amended Court Approval - Attachment 2.pdf · 8.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.