Council archive · source document
132006.268.03 - Amended Court Approval - Attachment 2
Roadworks Contributions 15. 16. A contribution of $5,960 shall be paid to the Council towards the cost of improvements to the major road network of Cooroy, as a result of increase traffic generation caused by the proposed development. The contribution shall be paid to the Council prior to obtaining a Development Permit for Operational Works. This amount will be subject to variations in the Consumer Price Index, All Groups Brisbane from December 2007 until the date of payment. A contribution of $160,975 shall be paid to the Council towards the cost of improvements to Cooroy Mountain Road, as a result of increase traffic generation caused by the proposed development. The contribution shall be paid to the Council prior to obtaining a Development Permit for Operational Works. This amount will be subject to variations in the Consumer Price Index, All Groups Brisbane from December 2007 until the date of payment. Water Quality 1%. The applicant shall submit a Water Quality Management Plan for approval prior to the issue of any Operational Works Permit. The water quality management plan shall address treatment of runoff from the proposed use including effluent, car park runoff and by product of the industrial use occurring on site. It shall demonstrate that the treatment system proposed results in a no worsening of the water quality of runoff from the site as a result of the business operations. It will include the requirement for water quality to be monitored for a period of three years from the construction of the car parking and effluent disposal systems. Effluent Disposal 18. 18A. The design and construction of the on-site effluent disposal system and disposal area shall be in accordance with the Site and Soil Investigation for On-site Wastewater Treatment and Effluent Disposal prepared by Future-plus Environmental, dated February 2014, subject to the following requirements: (i) | Ongoing monitoring of treatment process and disposal areas shall be undertaken to ensure both are functioning effectively over time. They shall be undertaken generally as follows: . Annual monitoring shall be undertaken from the time of commissioning to determine the quality of the wastewater produced from the effluent treatment system; . Monitoring of the soils, vegetation and groundwater in the application area shall be undertaken every three years to establish that such is not percolating into the groundwater; . Sampling and testing shall be in accordance with relevant regulatory requirements and manuals such as those provided by the Environmental Protection Agency, with testing undertaken by an accredited Laboratory; ° Continuous monitoring shall be undertaken by the system for any water on the surface of the application area, downslope resurfacing, changing plant growth on or around the application area and any other signs of problems, and addressed through maintenance or servicing. (i) - (ii) -
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
132006.268.03 - Amended Court Approval - Attachment 2.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.