Council archive · source document
132006.268.03 - Amended Court Approval - Attachment 2
(iv) - (Vv) = (vi) Washing plant, equipment or vehicles shall be undertaken off-site. If on-site washing of any plant or equipment is necessary, all wastewater shall be collected in a sump and disposed of off-site as trade waste by a registered operator. (vii) (viii) Rehabilitation of the waterway of the site, as indicated by the 1997 Strategic Plan (Open Space-Conservation & Waterway Protection) is to be undertaken in addition to replanting as detailed in Drawing HJ0085.1.2 of the Conceptual Site- Based Stormwater Management Plan. 18B. - Erosion & Sediment Control 19. Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site control measures such as silt fencing, controlled gravel access to the site and controlled disposal of waste, will be necessary. In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted to the Council for approval prior to obtaining a Development Permit for Operational Works. General 20. 21. 22. 23. For the following classes of work associated with development, a Development Permit for Operational Works must be obtained prior to commencement of works relating to that class of work. The application may combine any or all of these classes of work:- ° Access and/or Carparking. ° Roadworks. . Stormwater Drainage. . Frontage Works. . Erosion & Sediment Control A suitably qualified Registered Professional Engineer shall prepare engineering drawings and specifications for all engineering works that will become Council infrastructure, which shall be submitted in conjunction with an application for a Development Permit for Operational Works. In this regard a DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be submitted in conjunction with any application for Operational Works. Digital detailed designs including drawings, calculations, specifications and a schedule of works, shall be submitted with any application for a Development Permit for Operational Works in respect of roadworks and stormwater drainage works. The design shall be in accordance with Council’s Planning Scheme Policy PSPO5 — Engineering Design Standards — Roads, Drainage and Earthworks. To avoid conflict with underground pipes or services, all existing and proposed services required by the development shall be shown on the plans. To facilitate production of As Constructed drawings it is suggested that all design drawings are submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are available at www.adac.com.au).
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
132006.268.03 - Amended Court Approval - Attachment 2.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.