Council archive · source document
132006.268.03 - Amended Court Approval - Attachment 2
24. As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer for design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of all services and structures. All of which shall be submitted to Council for checking and for Council's records. The data must fully detail levels for all engineering works including but not limited to drainage structures, finished ground levels and pavement surface levels. The data shall be submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are available at www.adac.com.au). Approval of works shall not be granted until all As Constructed information has been supplied and accepted by Council. Environmental Health 25. 26. 27. The developer must provide waste storage and disposal facilities in accordance with Planning Scheme Policy No 9 “Waste Management Multi-Dwellings and Commercial and Industrial Premises’, including an external imperviously paved area correctly sized for all refuse and recycling containers and suitably screened from public places and neighbouring properties. A roofed waste/bin wash area is required with a cold-water tap, hose and drain outlet connected to sewer, or approved wastewater disposal system via a bucket trap and grease arrestor. The development must allow refuse-loading areas to be located off street. All vehicles associated with the collection of waste/recyclables, shall enter and leave the site in a forward direction, without the need for any unsafe manoeuvring. A Waste Management Plan (Operational) in accordance with Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and Commercial and Industrial Premises’, must be submitted for the day-to-day operation of the development and approved by Council’s Health Section prior to issue of development permit for operational works. It is critical that waste areas are properly planned. A copy of Planning Scheme Policy No. 9 explaining exactly how to predict waste quantities and design waste areas is available from Council and the web. The Plan shall include the following information: - . The types of waste that will be generated from the activities approved within the development. . Estimated volumes or tonnage of both recyclables and waste generated. . Methods to be used for dealing with garden waste. ° Initiatives to minimize waste either by waste prevention, reduction, re-use or recycling. . Description of procedures for getting all waste to the bins; the storage of bins and the collection of bins by the contractor. . A description of the design details of waste storage and recycling areas including size, location, elevation and floor plan, methods of bin washing and system to prevent storm water getting into sewer via the bin wash. . A description of types and volume of waste storage containers to be used. . The waste and recycling storage area shall include the provision of containers for all waste and recycling materials including putresable matter, non-recycling waste, paper/ cardboard, glass, aluminum/steel cans, waste oil, styrofoam boxes, etc, and bin washing facilities connected to sewer. . A detailed description of vehicular access to collect waste. Where collection is off street, access must allow vehicles to enter and leave the site in a forward direction.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
132006.268.03 - Amended Court Approval - Attachment 2.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.